Drive WCE Section 6 (Dashcam): Bandar Bukit Raja (Utara) Interchange to Assam Jawa / LATAR Highway

แชร์
ฝัง
  • เผยแพร่เมื่อ 22 ก.ย. 2024
  • The West Coast Expressway (WCE) / Lebuhraya Pantai Barat (LPB) is an interstate controlled-access highway running along the west coast of Peninsular Malaysia.
    The 233-kilometre (145-mile) expressway is currently under construction, with several sections open for public use.
    Once completed, the expressway will run between Changkat Jering, Perak and Banting, Selangor, following federal routes 5 and 60 for most of its route.
    The expressway will operate in three sections, with sections of federal route 5 completing the missing connections; these sections will be upgraded to limited-access roads.
    The expressway is expected to be fully completed by the end of 2024, except for a 10 km stretch from Section 7B which is expected to be completed by June 2026.
    The expressway is being built by Konsortium Lebuhraya Pantai Barat. Approval was given by the government for the construction, which was to begin from 20 December 2013 and was to be completed within five years.
    It originally was given route code E28 but later changed to E32, and E28 was used by Sultan Abdul Halim Muadzam Shah Bridge.
    The project was delayed and actual construction began in May 2014. Currently, a 9.7-kilometre (6.0 mi) segment between Kapar and Bukit Raja, a 19-kilometre (12 mi) segment from Hutan Melintang to Teluk Intan and a 45-kilometre (28 mi) segment from Lekir to Beruas are opened to traffic.
    Once the expressway is completed, it will be the fourth longest in Peninsular Malaysia, after the North-South Expressway Northern Route, the East Coast Expressway and the North-South Expressway Southern Route.
    #wce #selangor #fawwazmedia
    --------------------
    Dominant by Punch Deck | / punch-deck
    Creative Commons / Attribution 3.0 Unported License (CC BY 3.0)
    creativecommon...

ความคิดเห็น • 12

  • @mohdirwanbinabdullah9874
    @mohdirwanbinabdullah9874 10 หลายเดือนก่อน +3

    semalam aku dah lalu...Dr SUK Selangor ke exit tol Assam Jawa tue..ambk masa dlm 30 minit...naik motor..speed dlm 100.tp lps exit tol assam jawa ke kuala Selangor ambk masa dlm 10 minit lg....

  • @izzaniielachannel
    @izzaniielachannel 10 หลายเดือนก่อน +3

    Terbaik admin..terima kasih atas perkongsian

  • @irvalfirestar6265
    @irvalfirestar6265 10 หลายเดือนก่อน +1

    looks a lot like the highway's subgrade hasn't settled enough yet before the official opening, the road's bumpiness reminds me of Bukit Raja to Meru (Section 5) during its first few months.
    At some points during Section 5's early months, it was so bumpy that going full speed on a motorbike would have been a suicidal decision and would have caused you to catch serious air (before crashing back down to Earth).

  • @adewiraperkasa
    @adewiraperkasa 10 หลายเดือนก่อน +2

    spe pun buat camni , suke pun sama

  • @FaizAris
    @FaizAris 10 หลายเดือนก่อน +2

    ❤️😊👍🏻

  • @amirism91
    @amirism91 10 หลายเดือนก่อน

    Bawak laju ke tu tuan

  • @yasukizzi
    @yasukizzi 10 หลายเดือนก่อน +1

    berapa jarak dia dr tol ke tol? google map xupdate lg jln ni

    • @midiz8817
      @midiz8817 10 หลายเดือนก่อน +1

      14 mnit da smpi...laju

  • @mohdnajib83
    @mohdnajib83 10 หลายเดือนก่อน +1

    Selepas tol assam jawa, simpang nak ke Kuala Selangor bawah flyover Latar tu dah buka ke belum? Dlm video macam masih ada kon utk nak belok ke kanan?

    • @Permaimerah
      @Permaimerah 10 หลายเดือนก่อน +2

      sudah buka, dah boleh lalu. video dron mungkin sehari sebelum buka kot. sama dengan kon merah di persimpangan bukit raja di awal video. Dalam video dron ni masih ada kon merah. dalam video dashcam, kon tu dah dialihkan.

    • @mohdnajib83
      @mohdnajib83 10 หลายเดือนก่อน +1

      @@Permaimerah terima kasih 👍🏼

    • @FawwazMedia
      @FawwazMedia  10 หลายเดือนก่อน +3

      betul.