Stone House Work Trips in 2019

แชร์
ฝัง
  • เผยแพร่เมื่อ 16 ก.ย. 2024
  • During 2019 we made three work trips to the Maryland stone house. We discovered flowers in April, and cleared wisteria vines that had been spreading unchecked for at least 30 years. The modern kitchen was demolished in July and a temporary roof was put on the newly exposed original kitchen. In September we worked on exposing more of the stone inside the house by removing foam and the plaster that came off with it and drywall on the upper loft and the ceilings.

ความคิดเห็น •