Rate Analysis - : Rate Analysis can be defined as the analytical study (qualitative and quantitative) that leads to the definition of a new unit rate referring to a given job or work type, by identifying its basic elements. How is a new unit rate defined? The starting point to define the new unit rate, is to run a careful analysis of the elements and resources that build up to form the new work item. The elementary components, or resources, are generally the following: • workforce • materials • hired equipment • overheads • company profits Labor The cost of labor is defined by the type of workers (specialized, qualified operators) and the hours of work necessary per quantity unit. Materials To define the cost of the necessary materials, you need to determine the following: the purchase price • on-site transport costs • unloading • stacking and storage • waste (an excess percentage of unwanted material due to the production processes) Rentals Meaning the rented equipment or machinery that may be of 2 main types: • “operated equipment”: this means that the rental cost is inclusive of both the equipment, or machinery, and the necessary operational labor (eg. a crane and the crane operator). The operated equipment rental includes the labor costs required for its use, the fuel, lubricants, insurance costs and maintenance. • “without operator”: in this case the equipment or machinery is rented with the operator. This kind of freight cost does not include the cost due to labor required for its use. Neither does it take into account the cost for fuel, lubricants or maintenance. Overheads Overheads are the costs incurred in an indirect way and not directly related to the works or to the construction site. On average they are quantifiable with a fixed percentage of between 13% and 17% - (may vary from zone to zone). Overhead costs include the following items: • Administrative and Management • site technical systems • surveys and audits rzp.io/l/Vy5ZxFep1
HLO,MY ITI DRAUGHTSMAN CIVIL TRADE COMPLETE KARA HU & AUTOCAD SOFTWARE SIKHA HU & ABHI SURVEYOR KI TRAINING LENA CHAHTA HU TOH DESIGNING FIELD MAY EXPECT LARU JAISE AUR SOFTWARE'S SIKHU YA SURVEYING SIKH KR CAREER KO AAGAY BADHAU KUCH SAMAJ NAHI AA RAHA PLEASE REPLY BADE BHAI DHANYAVAD 🙏🏼❤️
In case core test results are not satisfy the requirements then we go with load test for flexural members . Other than flexural members should be preferably investigated by analysis.
সিভিল ইঞ্জিনিয়ার পড়ছি আমার জন্য দোয়া করবেন। আমি সারাবিশ্বে ফার্স্ট ক্লাস ফার্স্ট বিশ্বসেরা সিভিল ইঞ্জিনিয়ার ব্যারিস্টার হতে চাই ইনশাআল্লাহ। অনেক অনেক অনেক চিরস্থায়ী ভাবে আশির্বাদ করবেন ইনশাআল্লাহ
Initial setting time for OPC is Min 30 minutes And final setting time is max 600 minutes Apane kaha ki 600 se jyada final setting time hota hai.. Pls don't give wrong information to students.
Calculating 16mm Steel rod weight per metre we used the formula D^2 L/162 and per foot D^2 L/162. We know that 16mm dia of Steel bar have 3 number of Steel in one bundle and length of one piece of rod is 12 m. 16mm steel bar weight:- 16mm steel bar supplied in U bent or straight rods, length of 16mm steel bar is 40 feet or 12meter and 16mm steel bar weight is 1.580 kgs/m, 0.480 kgs/foot, 18.96 kgs/piece and 56.889 kgs/bundle. 16mm rod length:- 16mm rod supplied in U bent or straight rods, length of 16mm rod are 40 feet or 12meter
8mm ka 4.5 10mm ka 7.5 12mm ka 10.5 16mm ka 18kg 20mm ka 30 kg or agar steel 40 feet ka ho toh 1 2 kg fark aa jata he sir yeh sab easy he column ka center chapte he toh usme triangle shape se column sidha kaise le uski video banao aap sab padhe likhe engineer ho or me steel ka majdoor hu bhai hamare liye bhi video bana do plz🙏🙏🙏
Agar meri civil degree huyi hai, Mere pass Civil license hai, Mujhe woh license RENT pe dena hai, Toh mereko APPROXIMATE kitna FIX RENT mil skta hai...??? ( YEARLY NAI TO MONTHLY ) Bhai plz bataye 🙏🙏🙏💯💯💯 Boht jaruri hai....🙏🙏🙏
Q.no.8 answer-(16^2/162)×12=1.5802×12=18.962 kg
th-cam.com/video/4Cfqtcy0EGY/w-d-xo.html
@@anjconstruction02 u
@@simavloge1543 what is this
It's correct
Q 8 answer is 18.96
Good knowledge sharing
neme k Engineer hai Hume se ache Labour hai aaj k Duniya m Jo Rooz 800 Kama leete hai.hum tu Baat soon kr bhi 15000 who bhi 1 month m Dil Uthe gaya hai.B.C Engineer name se
Ha bhai..kya kr sakte h yaar
Right yar
U r not working as engineer. U r working as a munshi.
Engineer Salary starts from 30,000/-
And he do not stand whole day on site.
Jab Tak Chale Raha hai Aallah ka Shukar Hai Company hai Jab Tak aap ki Zaroorat hai tab tak Bakki Din Ghar pr.
Bhai kaam ana chahiye kitni bhii salry le sakte ho
Shaander vedio .. Good information sir ...aap ase he vedios bnate rhe ...
Thanks... Please subscribe for more video like this
1- soil samples liye jayge (SBC)
2- Soil report aygi
3- drawing aygi
4- excavation hoga....
Sabase pahele estimate nikalenge
@@Engineeraddas432 no...first step Conception in the mind of owner .
Question no. 8 answers is 18.96 kg
Nice
Thanks sr ji
Its ok
Kya karti hai mam
Thank you so much sir for all videos ,no one share knowledge with us due to lack of knowledge I felt very low but you trained me with your great skill and give me confidence.
Best knowledge. Thank 🙂🤝 sir
18.96 kg
18.96 kg hoti hai
@@AnkitKumar-zx8od ok sir. Thank
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
Nice teaching skills sir ji
Thanks you sir
For giving good knowledge & experience
Thanks sir
Please upload new video in footing to slab casting in house construction steps Question/Answer.
😀😀😀😀😀
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
Excellent video sir aise hi video upload kijiye
Thank you Sir Ji 🙏🙏🙏
Nidhi ji kya aap meri help kar sakti ho kya
शानदार कॉन्सेप्ट्स गुरु
Thanks for giving such knowledge I will note down these points to work on site
Yes
Job lgi?
Upka Bahut Galan answers hai
Rate Analysis - :
Rate Analysis can be defined as the analytical study (qualitative and quantitative) that leads to the definition of a new unit rate referring to a given job or work type, by identifying its basic elements.
How is a new unit rate defined?
The starting point to define the new unit rate, is to run a careful analysis of the elements and resources that build up to form the new work item.
The elementary components, or resources, are generally the following:
• workforce
• materials
• hired equipment
• overheads
• company profits
Labor
The cost of labor is defined by the type of workers (specialized, qualified operators) and the hours of work necessary per quantity unit.
Materials
To define the cost of the necessary materials, you need to determine the following:
the purchase price
• on-site transport costs
• unloading
• stacking and storage
• waste (an excess percentage of unwanted material due to the production processes)
Rentals
Meaning the rented equipment or machinery that may be of 2 main types:
• “operated equipment”: this means that the rental cost is inclusive of both the equipment, or machinery, and the necessary operational labor (eg. a crane and the crane operator).
The operated equipment rental includes the labor costs required for its use, the fuel, lubricants, insurance costs and maintenance.
• “without operator”: in this case the equipment or machinery is rented with the operator. This kind of freight cost does not include the cost due to labor required for its use. Neither does it take into account the cost for fuel, lubricants or maintenance.
Overheads
Overheads are the costs incurred in an indirect way and not directly related to the works or to the construction site.
On average they are quantifiable with a fixed percentage of between 13% and 17% - (may vary from zone to zone).
Overhead costs include the following items:
• Administrative and Management
• site technical systems
• surveys and audits
rzp.io/l/Vy5ZxFep1
th-cam.com/video/9SRTwI0Ec9E/w-d-xo.html
HLO,MY ITI DRAUGHTSMAN CIVIL TRADE COMPLETE KARA HU & AUTOCAD SOFTWARE SIKHA HU & ABHI SURVEYOR KI TRAINING LENA CHAHTA HU TOH DESIGNING FIELD MAY EXPECT LARU JAISE AUR SOFTWARE'S SIKHU YA SURVEYING SIKH KR CAREER KO AAGAY BADHAU
KUCH SAMAJ NAHI AA RAHA PLEASE REPLY BADE BHAI DHANYAVAD 🙏🏼❤️
Very halpfull vedio for civil engineer .
Thanku sir 💝
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
Useful 👍👍
In case core test results are not satisfy the requirements then we go with load test for flexural members . Other than flexural members should be preferably investigated by analysis.
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
Excellent Boss
Thanks you 🙏
Good morning ❤️
Gm
(16^2÷162) ×12= 1.580×12=18.96 kg
Nice work
Thanks
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
Q1. Plastering first and then flooring work will be done....
Right bro
Q.8 ans
(16^2÷162)×12=18.96kg
One length bar weight hai 12meter ki hoti hai
Aapne to 16mm ko meter me change hi nhi kiya hai
Thank u it is very much use full 🙏
I think in mix design it would be Cement:Coarse Aggregate:Fine Aggregate
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
No cement sand agreegat
@@chetankante1484 are bhai wahi baat h unhone b shi bola h sand or aggregate ko coarse &fine aggregate bolte h knowledge le bhai acche se
সিভিল ইঞ্জিনিয়ার পড়ছি আমার জন্য দোয়া করবেন। আমি সারাবিশ্বে ফার্স্ট ক্লাস ফার্স্ট বিশ্বসেরা সিভিল ইঞ্জিনিয়ার ব্যারিস্টার হতে চাই ইনশাআল্লাহ। অনেক অনেক অনেক চিরস্থায়ী ভাবে আশির্বাদ করবেন ইনশাআল্লাহ
Thanks
Bhai bas questions type video or banaye it's very interesting
Thanks
Tqq so much sir
8th answer 18.96
Good 👍👍👍👍👍
Thanks... Please subscribe for more video like this
Thanks... Please subscribe for more video like this
Q-8...
Ans- 18.96kg
Tq so much sir for this vidio because this vidio very useful of civil engineering prectical vive 🙏
th-cam.com/video/9SRTwI0Ec9E/w-d-xo.html
Thank you for civil engineering interview questions
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
Thankyou so much sir,it helped alot really!!!!
Keep watching my videos
Thank you Gurooji 😊
DPR- daily progress report.
Good Information tqs
the weigth will be 18.96 kg
Sir lintel aur chajja beam aur slab se pahele cast kita jata aur first step clean ing of site hota hai
Sahi kaha bro
Nice video sir 🙏🙏
Thanks... Please subscribe for more video like this
16mm 12m weight of steel 18.93
18.96
Initial setting time for OPC is
Min 30 minutes
And final setting time is max 600 minutes
Apane kaha ki 600 se jyada final setting time hota hai..
Pls don't give wrong information to students.
Tum theory base per kisiko judj mat karo
Thank you sir
I like this video
No:8 Question ka Answer 18.96
You r totally extraordinary speaker .
👍👍👍
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
Nict sir thanks🌹🌹🙏🙏🙏 guru ji
Initial setting time not less than 30 minutes final setting time not more than 600minutes i.e, 10 hrs
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
Bhai pehla video dekh raha hu apka .. aur itna hi kahi ga ..ki abse sabi video dekha karu ga, well down 👍
Thanks
Gupta and Gupta soil
Thank u for this ❤️
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
Q8)
Ans = (16²/162)×12
= 18.96 kg
Thanks sir 🙏
Thanks sir
Subscribe
(8) Questions for answer 18.96 kg
Super
18.962kg (16mm dia steel with 12m)
Great Boss
Thank's Sir 😍
18.96
Correct
Pointing ke baad plastering hota hai joints ko thoda kured te hain fir plastering karte hain taki wall aur mortar me achha bond ho
Calculating 16mm Steel rod weight per metre we used the formula D^2 L/162 and per foot D^2 L/162. We know that 16mm dia of Steel bar have 3 number of Steel in one bundle and length of one piece of rod is 12 m.
16mm steel bar weight:- 16mm steel bar supplied in U bent or straight rods, length of 16mm steel bar is 40 feet or 12meter and 16mm steel bar weight is 1.580 kgs/m, 0.480 kgs/foot, 18.96 kgs/piece and 56.889 kgs/bundle.
16mm rod length:- 16mm rod supplied in U bent or straight rods, length of 16mm rod are 40 feet or 12meter
Right
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
Perfect!
@@Civiconcepts Sir kisi Manufacturing company m Experience waale students se kon se questions ask kiye jaate h interview ke time please tell me
The Art of ur teaching is very intersting and humble
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
Formula to calculate unit weight of steel is, D^2 L / 162
No !
For calculate unit weight of steel is (D^2/162) only
@@shubhamkishor3464 yeah "L" is replaced with unity.
Thank you
(8) questions answere: 18.96kg
Right
@@Civiconcepts sir is time pe kahi job mil sakti hi Kya civil engineer
@@Civiconcepts pls reply sir
Thnks sir
Sir interview mai calculator allowed hai Kya?
Nhiiii
@@subhadrapanda7482 oooh
Nhi😄
@@civilengineer5325 ....ji
@@subhadrapanda7482 hyyy ji
Nice bhai
Q.8- 18.96 Kg
Muje bhi sikha doge kiya esi calculations
Thank u for information
play @ 1.5 speed
Sir our aisi hi video bonao
0:58 PCC not PPC
Yes
Thank u very much sir
Thanks... Please subscribe for more video like this
18.96 kg
Thank you sir ..,
very knowledgeable👍
I didn't get 7th one
Sir is traha ka he short vedio banow bhot maza karta ha sir dakna ma
18.97 kg for 16mm dia 12m long steel baar
Ryt
No it's 18.962
Thank u so much sir from the all corner of the 🙏🙏
3:58 that is not dumpy level,that is auto level
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
8mm ka 4.5
10mm ka 7.5
12mm ka 10.5
16mm ka 18kg
20mm ka 30 kg or agar steel 40 feet ka ho toh 1 2 kg fark aa jata he sir yeh sab easy he column ka center chapte he toh usme triangle shape se column sidha kaise le uski video banao aap sab padhe likhe engineer ho or me steel ka majdoor hu bhai hamare liye bhi video bana do plz🙏🙏🙏
18.962 kg sir👍
Correct
Very very very nice videos
1.185
Q.8
Ans: (16^2÷162)×12 = 18.96
Right
Good work sir g
Kis kis ko question ke answers patha the?
क्क्क्क्क्क्क्क
18.8 kg
super
18.96
Sir good information knowledge for civil engineers 🙏
Agar meri civil degree huyi hai, Mere pass Civil license hai, Mujhe woh license RENT pe dena hai, Toh mereko APPROXIMATE kitna FIX RENT mil skta hai...??? ( YEARLY NAI TO MONTHLY ) Bhai plz bataye 🙏🙏🙏💯💯💯 Boht jaruri hai....🙏🙏🙏
In Canadian gallon 4.54 litres pr gallon
😁ye kaha padh liya😂
@@Anandpandey01 😀😀 indian always have some extra information faltu ki 😀🥰
@@Stepfordreams sahi kaha bhai😂😂😂😂😂
question no 8. ka 18.962
Yes sir thank 🙂 answer correct h mera.
Building construction steps
LayOut should be the No. 1 step ...you skipped it .
8ka ans 18.96kg hoga n
18.96m
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html
Tq so much sir👍
th-cam.com/video/PkN5tBIEQcA/w-d-xo.html