How much would the price be to be able to make 4 grouts so that they have 4 12"X8" steel columns that must support 3.5 tons? It will be for a single crane that supports 2.5 to 3 tons maximum. I don't want it exactly. I need help
@Tewit Yes 28 days required to get maximum hardness. When get maximum hardness this grout could withstand great force. The word maximum i wrote before related to 'concrete compression test' which take 3 times after grout pouring: 3 days, 7 days and 28 days after pouring.
👇 SUBSCRIBE TO Aperture Of Construction TH-cam CHANNEL NOW 👇
th-cam.com/channels/P_Az1G815pZLYCkYhrssIA.html
Need to use more water brothers, 215 more flowable the 212 so that it can get in under your I beam.
How much would the price be to be able to make 4 grouts so that they have 4 12"X8" steel columns that must support 3.5 tons?
It will be for a single crane that supports 2.5 to 3 tons maximum.
I don't want it exactly. I need help
This mix should be flowing from one side to another
I gotta do this tomorrow at a 45 degree angle 📐 😩 still learning
What is the size of column
Boss itu ruang bawah h beam lapik apa boss ? Supaya boleh dpt mcm boss buat utk letak sika grout.. bawah h beam ade gap..
How long before it's fully dry??
Wait for 48 hours until fully dry.
For foundation pump 1400x700x50 it's posible use sika grouting
Should be no problem. But you have to get advice from consultant / engineer
If you have viberations, epoxy grouts are better.
Should be self flow by gravity
What is the size of h beam? And the size base plate?
Thanks🙏🙏🙏
need to add more water for good flow of grout
ilang kilo ihalo sa tubig sir
How much volume covered with 1 bag of Sika Grout 215?
it’s 25KG per bag.
the specification please refer to official website
mys.sika.com/content/dam/dms/my01/5/sika_microcrete_-217.pdf
thank you
Is curing required after this? If so, how long?
28 days needed to get maximal hardness
@@purple12227 You cure for 28 days for cement grout?
@Tewit Yes 28 days required to get maximum hardness. When get maximum hardness this grout could withstand great force. The word maximum i wrote before related to 'concrete compression test' which take 3 times after grout pouring: 3 days, 7 days and 28 days after pouring.
@@purple12227 28 days is to develop full strength, but curing for 28 days is overkill
老板。酱快上柱子了哈哈
上了 哈哈 铁的 不是我们的工作范围
老板。如果是做石屎的就比较慢对吧哈哈哈
老板。你在柱子放洋灰。是不要让它进水是吗?哈哈
如果做 石灰 工程是比较慢 也比较贵
铁可以比起石灰可以做高很多
做一个保护 不要那么容易接触到水 不然很容易就生锈
Question!
Do you still need to apply a bonding agent in the old concrete before applying the Sika Grout 215?
Thanks
Hello , we didn’t apply the bonding agent. Make sure the Sika Cement well pouring and try to vibrate if possible
@@apertureofconstruction1739 thank you
You are welcome
👍🏻
Appreciated for comment :) Hope you help to share
Me parece q no es lo correcto, el grot debe estar más líquido
You have to wear a rubber cloves
Made in Pakistan...😱😱