ขนาดวิดีโอ: 1280 X 720853 X 480640 X 360
แสดงแผงควบคุมโปรแกรมเล่น
เล่นอัตโนมัติ
เล่นใหม่
Thanks sir for your videoRagavan from India EAZYCHEM chemicals supplier
Hi! Very helpful video. How long it took to apply in one hold?
about 6 hours each hold, with two teams working on each side, and one team on deck to assist with the heaving line and transfer of equipment.
Sir ask lng po ako..kasama din po ba yung tank top e slip coating po??
@@seamandelicades4432 no need tank top, slip coat will protect the paint coating of bulkheads. basta malinis ang tank top, free of rust and flakes, and no residue of previous cargo, pasado na po yan sa inspector.
Kahit pi ba sulphur e no need na po ba sa tank top. Salamat po
Anu po mixing ratio ng hold block pre-load 300
Thanks sir for your video
Ragavan from India EAZYCHEM chemicals supplier
Hi! Very helpful video. How long it took to apply in one hold?
about 6 hours each hold, with two teams working on each side, and one team on deck to assist with the heaving line and transfer of equipment.
Sir ask lng po ako..kasama din po ba yung tank top e slip coating po??
@@seamandelicades4432 no need tank top, slip coat will protect the paint coating of bulkheads. basta malinis ang tank top, free of rust and flakes, and no residue of previous cargo, pasado na po yan sa inspector.
Kahit pi ba sulphur e no need na po ba sa tank top. Salamat po
Anu po mixing ratio ng hold block pre-load 300