Using MT100 Bobcat to Prep a Driveway

แชร์
ฝัง
  • เผยแพร่เมื่อ 9 ม.ค. 2025

ความคิดเห็น • 4

  • @lawdtjr19
    @lawdtjr19 ปีที่แล้ว +1

    Is there a difference between new construction prep and grading then existing grading and prep?

    • @innovativeconcretesolution3522
      @innovativeconcretesolution3522  ปีที่แล้ว +1

      Well the way that we prep new construction driveways is base on existing dirt/grade that they had brought from dirt pad for house foundation. Normally its 1/8 inch slope per foot or 1% slope
      But sometimes we need to drope slope more, that depending on grade of the existing yard of the property

  • @chenzhou4078
    @chenzhou4078 ปีที่แล้ว

    I am planning to purchase Vermeer 925 or Bobcat MT100, which one is better? Which one is more powerful? Which is more suitable for digging soil?

    • @innovativeconcretesolution3522
      @innovativeconcretesolution3522  10 หลายเดือนก่อน

      Well the MT 100 is good for small projects
      I we love our machine it’s powerful for its size but if looking to move tons of dirt I would recommend look in to a regular size skid steer