    One more option is core cutting which I do not recommend as it requires coring of the RCC member at multiple places which again affects strength and durability and chances of cutting of steel hence I did not include in this. Although as per ACI actual strength of concrete is considered as 85% of cylinder strength.

    • @danishhasan8380
      @danishhasan8380 3 ปีที่แล้ว

      What will be the dimensions of cylinder (core cut)

  • @danishhasan8380
    @danishhasan8380 3 ปีที่แล้ว +1

    What should be the strength after 56 days and should the cubes to be kept under curing for 56 days?

    • @EverythingCivil
      @EverythingCivil  3 ปีที่แล้ว

      Yes 56 days strength to be checked only if strength not achieved at 28days.. yes to be cured till 56 days.

  • @hz8200
    @hz8200 3 ปีที่แล้ว

    Sir bohot Sahi info diye ho..bohot shukriya🤗

  • @atiqueahmed8201
    @atiqueahmed8201 3 ปีที่แล้ว

    Sir can we use saline water in concrete making
    If not what is reasons?

    • @EverythingCivil
      @EverythingCivil  3 ปีที่แล้ว +1

      No it cannot be used. initially you will get large strength gain but later on strength will reduce of concrete due to the crystallization of the salt particles which is water.

    • @atiqueahmed8201
      @atiqueahmed8201 3 ปีที่แล้ว

      @@EverythingCivil thank you sir

  • @flywithzunera
    @flywithzunera 3 ปีที่แล้ว

    What a great info

  • @ajazsayyed8487
    @ajazsayyed8487 3 ปีที่แล้ว

    Sir if some portion of column concreting one day then after how many days should concreting done remaining portion.

    • @EverythingCivil
      @EverythingCivil  3 ปีที่แล้ว +1

      You can do it next day no issues. Make sure that old surface is properly roughened to expose aggregate and use proper bonding agent like cement slurry

    • @ajazsayyed8487
      @ajazsayyed8487 3 ปีที่แล้ว +1

      @@EverythingCivil sir my doubt is the first portion not getting strength and even concreting is done above it

    • @EverythingCivil
      @EverythingCivil  3 ปีที่แล้ว +4

      Look after one day the column will definitely not have enough strength to take the design load. But it will definitely have the strength to take the upper portion of concrete which is casted. The casting height of upper portion should be less than 1m then it's ok. Other wise it is better to wait for 3days.

    • @ajazsayyed8487
      @ajazsayyed8487 3 ปีที่แล้ว

      @@EverythingCivil thank you so much sir.

  • @paramhanshkumar9651
    @paramhanshkumar9651 2 ปีที่แล้ว

    IS CODE PLEASE MENTION KARIYE KAHA PAR LIKHA HAI "REBOUND HAMMER &PLUSE VELOSITY KARNA ANVAR HAI

  • @pardeepsingh4783
    @pardeepsingh4783 6 หลายเดือนก่อน

    @everything civil comcrete never achieves 100 % strength in 28 days its basic civil engg

  • @salmanmiya9194
    @salmanmiya9194 3 ปีที่แล้ว

    Sir what is value of Sigma ?

  • @modassariqbal306
    @modassariqbal306 3 ปีที่แล้ว

    Sir agar 24.6 ah rha hai 28 day M25 grade k to kya cube pass hoga kya 98 percent results to ah rha hai na

    • @EverythingCivil
      @EverythingCivil  3 ปีที่แล้ว +1

      24.6 average hai ya individual?

    • @modassariqbal306
      @modassariqbal306 3 ปีที่แล้ว

      @@EverythingCivil average hai sir G

    • @EverythingCivil
      @EverythingCivil  3 ปีที่แล้ว +1

      Technically to fail hai..but factor of safety hota hai load ka to waha se to ye safe hai😁
      But mere hisab se ek bar consultant ko inform kar do

  • @muhammedlamyp.j9860
    @muhammedlamyp.j9860 3 ปีที่แล้ว +2

    English.....😥😥

  • @nityanandasenapati4878
    @nityanandasenapati4878 8 วันที่ผ่านมา

    😢😢