Unboxing the Shariff DMC2 Desktop CNC Milling Machine Kit

แชร์
ฝัง
  • เผยแพร่เมื่อ 20 ม.ค. 2025

ความคิดเห็น • 21

  • @mowermicah7880
    @mowermicah7880 2 ปีที่แล้ว +5

    I am interested in one of these machines. Further build, or review videos would be very helpful and much appreciated.

  • @airatooo
    @airatooo 2 ปีที่แล้ว +7

    hey, are you planning to make build videos for this machine? cheers!

  • @GatorGlider
    @GatorGlider 2 ปีที่แล้ว +2

    I didn't get in on the Kickstarter but in batch 2. Hopefully mine should be shipping soon. It bums me out over the poor powder coating. It looks like yours was well packed and received. In someone else's video they had bent parts and a few items that had been dropped. I've read through the build guide a couple of times but am looking forward to seeing a build video.

    • @GregsStoneYard
      @GregsStoneYard  2 ปีที่แล้ว

      I still haven't put mine together yet! I picked mine up so didn't have to worry about shipping damage. Hope yours arrives without issue.

    • @GatorGlider
      @GatorGlider 2 ปีที่แล้ว

      @@GregsStoneYard I'm at the lower opposite end of the US from where Omar is located. The boxes in his pictures and the packing evident in your video looks like it's more at the mercy of the shipper than anything else. Was yours from the initial Kickstarter batch? I didn't have the funds available to get into the campaign but was able to get into the second batch. I hoped that by doing so would also be beneficial as any issues would be resolved. Your assessment of the powder coating on the frame components match the assessment of another person's during unboxing. I'm half tempted to strip them sandblast them and have them powder coated locally. Last thing I want is the flood coolant causing any issues with poorly protected metal.

    • @GregsStoneYard
      @GregsStoneYard  2 ปีที่แล้ว +1

      @@GatorGlider I sent Omar a note about the powder coating and he informed me that for batch two they switched to a different company to do the coating, and the quality was much better. So hopefully you are good. Other than that, I wouldn't expect too many other differences between batch 1 & 2 as he had already ordered much of batch 2 components/materials before batch 1 shipped. So I don't think there is much opportunity for improvements based on feedback from batch 1.

    • @GatorGlider
      @GatorGlider 2 ปีที่แล้ว

      @@GregsStoneYard That's good to hear about the powder coating! I figured feedback from batch 1 wouldn't be incorporated just for the reason you mentioned. I was more hoping to avoid "small" issues like having to unsolder and resolder a diode that got placed wrong on the board (was surprised that happened).

  • @dilloncloran
    @dilloncloran ปีที่แล้ว +1

    Did you get any directions with yours? I didn’t receive anything no paperwork, thumb drive or even an email with directions? Ive tried emailing but still have not received a reply

    • @GregsStoneYard
      @GregsStoneYard  ปีที่แล้ว

      Yes he has a google docs share with the various manuals. You can contact me by email greg9504 at gmail.com for the link. I haven't assembled mine yet. Those who have noted some problems getting everything alined correctly. There is a Discord group, 3D Misfits, I think this link should work: discord.com/channels/794761695993397291/934469236112384091

    • @ChocFlip201
      @ChocFlip201 ปีที่แล้ว

      @@GregsStoneYardDo you still have those assembly instructions? I just received my unit and I’m ready to start assembling but don’t know where to begin

    • @GregsStoneYard
      @GregsStoneYard  ปีที่แล้ว

      @@ChocFlip201If you just received it, does that mean Shariff is still making the kits? If he is he should be able to provide you with an up to date link. Otherwise contact me at greg9504 at gmail.com

  • @wiremonkeyshop
    @wiremonkeyshop ปีที่แล้ว

    Hey Greg, I have one of these machine's sitting in my garage for a year now. Getting ready to finally build it. Disappointing to see the powder coating over mill scale! How long did it take you to get the machine up and operational?

    • @GregsStoneYard
      @GregsStoneYard  ปีที่แล้ว

      I only got as far as the unboxing. There is a discord with more help, channel 3D Misfits, then select the CNC General Discussion. It's almost all DMC2 related. One day I'll assemble it.

  • @canadiangemstones7636
    @canadiangemstones7636 2 ปีที่แล้ว

    Would love to know if this thing is worth a damn.

    • @GregsStoneYard
      @GregsStoneYard  2 ปีที่แล้ว

      I haven't assembled mine yet, as I got it in the spring and was too busy with outside stone cutting. However from what I've recently read, is no, it's not worth it. You are better to look at something like the Langmuir MR1

  • @eprohoda
    @eprohoda 2 ปีที่แล้ว

    very amazing content,ese u around-bro! =)

  • @rigon63
    @rigon63 2 ปีที่แล้ว

    What happened to this machine? As far as I can tell Omar dropped off the face of the planet after the kickstarter ended and his shop shows out of stock.
    I want to purchase one but as far as I can tell he's either not selling it anymore or he's working on new iterations and he's not replying to his business emails

    • @GregsStoneYard
      @GregsStoneYard  2 ปีที่แล้ว

      He is currently shipping out orders from the first batch. He is usually pretty good at replying to emails. He told me when I picked mine up that he is already receiving items to send out batch 2. I'd try contacting him again. Unfortunately I haven't had time to assemble mine yet. You might want to wait until some reviews come out now that people have them.

    • @rigon63
      @rigon63 2 ปีที่แล้ว

      @@GregsStoneYard Awesome! Glad to hear that this project is still alive. I'll shoot him another email thanks!

    • @hamiltonpianos
      @hamiltonpianos 2 ปีที่แล้ว

      @@rigon63 Definitely still alive; mine shipped yesterday, and is arriving next week! :) As Greg says, he's good at replying to emails, and has kept the backers updated every week since the Kickstarter campaign finished. I'd guess he's snowed under getting the current orders filled as there were three times more backers than expected!!!