Big mistakes that made this building failure 😑

แชร์
ฝัง
  • เผยแพร่เมื่อ 18 พ.ย. 2024

ความคิดเห็น • 1.2K

  • @josephpeter6796
    @josephpeter6796 4 ปีที่แล้ว +326

    I am a doctor, but i always tell ppl that you don't need to be a doctor to save lives. this analysis can save many lives. grt work engineer boy ..... keep it up

    • @Sulimankhanacademy
      @Sulimankhanacademy  4 ปีที่แล้ว +17

      Thank you so much sir for this huge appreciation ❤️❤️❤️❤️

    • @mellygibbs7011
      @mellygibbs7011 2 ปีที่แล้ว

      Doctors kill people one at a time, engineers can kill people by the thousands at a time ;)
      Kill and save are interchangeable

  • @rahulvaidya6753
    @rahulvaidya6753 3 ปีที่แล้ว +403

    Without even studying engineering, I can tell the structure feels wobbly.

    • @Sulimankhanacademy
      @Sulimankhanacademy  3 ปีที่แล้ว +21

      yes

    • @alzmirza6504
      @alzmirza6504 3 ปีที่แล้ว +10

      This is a best example for new students as not to build the building like this.

    • @j12325
      @j12325 3 ปีที่แล้ว +5

      Evrry structure during construction feel woobly

    • @fillettru
      @fillettru 2 ปีที่แล้ว +1

      @@j12325 No sherlock

    • @yishaithegift9953
      @yishaithegift9953 2 ปีที่แล้ว +2

      I mean it just takes attention to detail, and a little common sense. Nobody should have been working on that building with how bad the structures foundation was.

  • @jagruknagrik1690
    @jagruknagrik1690 4 ปีที่แล้ว +64

    Its just the beginning.
    We will get this kind of many engineers in lockdown.

    • @Sulimankhanacademy
      @Sulimankhanacademy  4 ปีที่แล้ว +2

      Hehe.

    • @vivosereni
      @vivosereni 4 ปีที่แล้ว +1

      Hehehehe

    • @deependrakumar2623
      @deependrakumar2623 4 ปีที่แล้ว +5

      I am one of them

    • @nuwansampath7348
      @nuwansampath7348 4 ปีที่แล้ว

      @@deependrakumar2623 hahaha!

    • @riyuzakhi
      @riyuzakhi 3 ปีที่แล้ว +3

      Thats because we follow western method of construction that is half explained by the people who teach,because they themselves are not sure of their stupid methods.

  • @muhdharith2790
    @muhdharith2790 4 ปีที่แล้ว +33

    The only reason is wrong equipment, they should rent proper standard scaffold that ensure safety to workers

    • @Sulimankhanacademy
      @Sulimankhanacademy  4 ปีที่แล้ว +1

      Yes

    • @aluk.m527
      @aluk.m527 4 ปีที่แล้ว

      That iis actually almost true ,sir .!

    • @devilff7645
      @devilff7645 3 ปีที่แล้ว

      Bhai ye india hai yaha log ghar bNate samay jugadu smaan lete hai.

  • @timange124
    @timange124 3 ปีที่แล้ว +66

    The problem is simple, don’t use chopsticks to hold up a structure..

    • @detroitisback8021
      @detroitisback8021 3 ปีที่แล้ว +5

      DUDEEE! LMAO

    • @episode361
      @episode361 2 ปีที่แล้ว

      Lol.. than how
      Maybe u one of those contractor too ..lmao

  • @MilciadesAndrion
    @MilciadesAndrion 4 ปีที่แล้ว +16

    Structural failures that cause structures to collapse can be prevented by following safety standards and specifications required by designers, builders, and specifications. Elementary safety standards must not be postponed or forgotten and the quality of materials must be optimal. Fortunately in this example, there were no fatalities to mourn. The explanations are concise and precise and it gives us a great teaching in the field of Civil Engineering. Great video. Thanks.

    • @Sulimankhanacademy
      @Sulimankhanacademy  4 ปีที่แล้ว

      Thank you so much sir for the compliment

    • @taffythegreat1986
      @taffythegreat1986 2 ปีที่แล้ว

      There doesn’t seem to be any H&S in these countries

  • @roshanaw33
    @roshanaw33 3 ปีที่แล้ว +14

    This explanation was very good and scientific way ..you have good way of focusing on the first Problem which caused other problems.🔥

  • @cktechedu1455
    @cktechedu1455 4 ปีที่แล้ว +42

    I think The main reason is front side it has only 2 columns . In a large distance area

  • @MS-zk8px
    @MS-zk8px 4 ปีที่แล้ว +84

    The main problem is there are no load bearing walls or columns & peripheral wall to carry the load this is what happens when it’s not under engineers supervision

    • @Sulimankhanacademy
      @Sulimankhanacademy  4 ปีที่แล้ว +9

      Yes you are right

    • @babyscute2498
      @babyscute2498 2 ปีที่แล้ว +1

      Jesus Christ powerful holy Saviour and mighty Bless you kids anen❣️👋One God powerful holy and Saviour in World

    • @Mohammad-or2tz
      @Mohammad-or2tz ปีที่แล้ว

      True

    • @booooo666
      @booooo666 ปีที่แล้ว

      No.. The main problem is the men have no fkn brains

  • @sheldoncooper1593
    @sheldoncooper1593 3 ปีที่แล้ว +39

    The slab had no support. They should have placed beams between the columns. Still the clear span between the column on longer length is too high I think.

    • @abidasultana5546
      @abidasultana5546 3 ปีที่แล้ว

      Allah bless our selves and helpful

    • @ABHI690
      @ABHI690 ปีที่แล้ว

      @@abidasultana5546 no Allah is shit

  • @RK-MAHAVADI
    @RK-MAHAVADI ปีที่แล้ว +4

    The main reason is Failure of Beams due to improper specifications. The C-C distance between Columns look more than permitted.

  • @onlinechatter8578
    @onlinechatter8578 3 ปีที่แล้ว +21

    feel like watching TENET!!! but nice video

  • @TheHunter004
    @TheHunter004 2 ปีที่แล้ว +4

    I think major root cause are
    1. Central roof don't have any column.
    2. Rebar overlapping is provided on centre of roof. There must be single straight piece rebar and must be lock with corner columns rebar like cranking system rebaring or plate beam system rebaring..

  • @muralikrishna5435
    @muralikrishna5435 4 ปีที่แล้ว +15

    The prime reasons maybe
    1.Props are not perpendicular
    2.double stage props were given which are always very dangerous
    3.The base ground should be compacted well and should be laid with PCC before propping
    4.Before concreting proper checking about props stability was not done.

    • @Sulimankhanacademy
      @Sulimankhanacademy  4 ปีที่แล้ว +1

      Yes 🤩

    • @AashishKumar-ij4tq
      @AashishKumar-ij4tq 2 ปีที่แล้ว +1

      Without structure stability. They start work , double story prop and . Length between Span too much .. is prime reason

    • @Bhaiya518
      @Bhaiya518 ปีที่แล้ว

      If this slab cannot be sustain ,main reason lack of column ,slab will deflect and collapse later if not collapse at that time

  • @tropicthunder5970
    @tropicthunder5970 2 ปีที่แล้ว +3

    On the bright side, they can collect remaining concrete and can build a compound near their building and now they know they have to modify their structure and will avoid collapsing before furnishing it

  • @BoomibalanMurugesan
    @BoomibalanMurugesan 4 ปีที่แล้ว +28

    This video is Very useful and experience for engineers
    Before avoid the mistakes

  • @nicolasalmendrez3840
    @nicolasalmendrez3840 4 ปีที่แล้ว +10

    So many factors why this happened. Not just the support and scaffolds.

  • @anilrockzzz6756
    @anilrockzzz6756 3 ปีที่แล้ว +9

    Front side minimum 4 columns require to balance the load of that wide slab..

  • @ungreen6385
    @ungreen6385 3 ปีที่แล้ว +30

    apart from the expanse being too wide without additional columns, they may not wait for the columns underneath to solidify.

    • @Sulimankhanacademy
      @Sulimankhanacademy  3 ปีที่แล้ว

      Yes

    • @gregorypaulino8842
      @gregorypaulino8842 3 ปีที่แล้ว

      Exactly! columns are too wide.

    • @zuludeltanovember
      @zuludeltanovember 3 ปีที่แล้ว

      @@Sulimankhanacademy your accent is stupid by the way. just talk garbage hindi instead.

    • @SR01995
      @SR01995 3 ปีที่แล้ว

      Yeah when they build Building without consulting Civil Engineers/Structural Engineers

    • @earlkennethgeroche8140
      @earlkennethgeroche8140 3 ปีที่แล้ว

      Yes, they may wait for the columns to solidify so that this will produce the extra strength to counter the weight from above

  • @sp-tj9ye
    @sp-tj9ye 2 ปีที่แล้ว +4

    This analysis must be shown in ALL architecture & civil engineering colleges.

  • @carljohnson-111
    @carljohnson-111 3 ปีที่แล้ว +468

    *That's the heaviest Indian accent*

    • @BadBits1
      @BadBits1 3 ปีที่แล้ว +14

      I don't this is an Indian accent. It's somewhere from more Asian countries.

    • @kidiyanagarmagansolanki9531
      @kidiyanagarmagansolanki9531 3 ปีที่แล้ว +2

      Hello

    • @kuenzangjamtsho8636
      @kuenzangjamtsho8636 3 ปีที่แล้ว +4

      Urdu accent

    • @shafiq.peshawar
      @shafiq.peshawar 3 ปีที่แล้ว +7

      Pushtoon Accent

    • @akshayagrawal8436
      @akshayagrawal8436 3 ปีที่แล้ว +20

      When we don't understand the content... And try to judge the accent. Classic 😂😂😂

  • @fadedmusic8713
    @fadedmusic8713 5 ปีที่แล้ว +12

    In construction beam design we take that the percentage of steel should be maximum or more than the minimum percentage of steel ... My question is that what if the minimum percentage of steel is maximum or more than the percentage of seel?
    Also I want to ask that which type of beam is most economical of the given types? Singly Reinforced, Doubly reinforced and T-beams?

    • @conantdog
      @conantdog 5 ปีที่แล้ว +3

      To much weight not enough support 🤪 basic .

    • @sheldoncooper1593
      @sheldoncooper1593 3 ปีที่แล้ว +1

      If min percentage of steel is greater than the calculated percentage of steel than you should use min %Ast as per IS code.
      Singly reinforced is the most economical. Doubly reinforced beams are only used if the SRB design is not satisfactory. And T-beams cannot be compared to SRB or DRB. It’s just a type of beam. It can be designed as SRB or DRB.

    • @babyscute2498
      @babyscute2498 2 ปีที่แล้ว

      Jesus Christ powerful holy Saviour and mighty Bless you kids anen❣️👋One God powerful holy and Saviour in World

  • @jeanguerrier7324
    @jeanguerrier7324 3 ปีที่แล้ว +4

    That was a huge mistake on the part of the builder. The builder should.be held responsible to rebuild the entire house not the owner.

  • @naveediqbal6276
    @naveediqbal6276 ปีที่แล้ว +2

    Middle part of roof has less wooden columns as compare to sides where beams were supported by extra supports. Another factor must be the leaked slurry which weakened the base supports

  • @antipembodohan5321
    @antipembodohan5321 3 ปีที่แล้ว +13

    There are two main factors that caused failure..
    1. Too minimum column number for that wide beam
    2. Too high level (approx 6 m) of the plate that it is undergoing high moment inersia..

  • @GhazaliMath
    @GhazaliMath 2 ปีที่แล้ว +1

    The last point is the best 😂

  • @rainbow602
    @rainbow602 3 ปีที่แล้ว +11

    The student passout in lockdown will be resulting this... 😂😂😅😂

  • @akashsingh3137
    @akashsingh3137 3 ปีที่แล้ว

    1 number bhiau keepitup bro nice one must like

  • @arapdibari7104
    @arapdibari7104 4 ปีที่แล้ว +19

    Buider8 always want to use less materials to double profits at the expense of life,

  • @kamenriz
    @kamenriz 2 ปีที่แล้ว

    Very vgood and scientific in the world

  • @asuwish8300
    @asuwish8300 3 ปีที่แล้ว +25

    The main reason behind this failure is the absence of a civil engineer. Some ppl don't hire any civil engineer they just give contact to the local thekedars who don't know any things about the construction. They hired Mason as a engineer 😄😄😄

    • @irtazadevil14
      @irtazadevil14 3 ปีที่แล้ว +1

      U must b engineer 😂😂😋 and second second bro engineer are thaggi baz but experinced thakidar are better then engineers u know.

  • @Allinone-321
    @Allinone-321 2 ปีที่แล้ว

    I am nothing to do with this video, I am just to listen ur voice......ur voice is so cool and aweet

  • @bigdick4336
    @bigdick4336 3 ปีที่แล้ว +4

    It just a matter of time before these types of engineering is brought into USA.

    • @fuckheinschitt239
      @fuckheinschitt239 3 ปีที่แล้ว

      I never seen a video construction fail in US.

  • @luisribeiro5639
    @luisribeiro5639 ปีที่แล้ว

    it's strange that in this country you can build such a big building without be obliged to calculate the load and if the ground, the pilars can support it. You make a good job on explaining the rules of buildinf safely. In Africa a building with 21 floors colapse during building and a lot of workers died.

  • @besutaswuro2214
    @besutaswuro2214 4 ปีที่แล้ว +2

    Great one.... Sir...👍👍👍
    Right lesson with right example.
    Looking for more...👍

  • @kurulusosman8727
    @kurulusosman8727 4 ปีที่แล้ว

    Структурные сбои, которые приводят к разрушению конструкций, можно предотвратить, следуя стандартам безопасности и спецификациям, требуемым проектировщиками, строителями и спецификациями. Элементарные нормы безопасности не должны откладываться или забываться, а качество материалов должно быть оптимальным. К счастью, в этом примере не было жертв, о которых можно было бы скорбеть. Объяснения краткие и точные, и это дает нам большое учение в области гражданского строительства. Отличное видео. Спасибо.

  • @RameshKumar-ru8uk
    @RameshKumar-ru8uk 2 ปีที่แล้ว +3

    Good news: not even one was gone in this accident 😂

  • @bemnetsileshi5222
    @bemnetsileshi5222 ปีที่แล้ว

    Great presentation!

  • @markflores6104
    @markflores6104 4 ปีที่แล้ว +11

    This is what you get when you hire an indian engineer.

    • @RajKumar-km2jt
      @RajKumar-km2jt 4 ปีที่แล้ว +1

      Indians have good and clear English communication. The origin of this video seems to be from Pakistan/ Afghanistan.
      Apart from communication, construction process in India is not so horrible. This is the first time I have seen such a video on construction, where Technology & Engineering is applied in the least possible manner. We do not call this a construction. Shame on the builder who has undertaken this task.

    • @rvwins6191
      @rvwins6191 4 ปีที่แล้ว +2

      @@RajKumar-km2jt , that’s why they keep calling me and they wants my credit card number.

    • @ratan1686
      @ratan1686 4 ปีที่แล้ว

      @@rvwins6191 so how does it feel being robbed from? Your ancestors have colonized and plundered so many countries.

    • @letslearntv2692
      @letslearntv2692 4 ปีที่แล้ว

      Mark foles fuck off blddy idiot u don't know the power of Indian engineers. U don't know anything and I think you are mistry

  • @jonathanlina9155
    @jonathanlina9155 4 ปีที่แล้ว +2

    Khamaka Brekker: Number first! 😁

  • @KpxUrz5745
    @KpxUrz5745 3 ปีที่แล้ว +8

    The whole thing is utterly ridiculous. Even any untrained person can see this is a disaster in the making. How is it possible for that many people to be that stupid in one place?

  • @lovepeople3769
    @lovepeople3769 2 ปีที่แล้ว

    good demonstration for Engineering students

  • @vincentjacob5513
    @vincentjacob5513 4 ปีที่แล้ว +5

    Thank you for this analysis.

  • @rizkijagat6011
    @rizkijagat6011 3 ปีที่แล้ว +3

    There's only two concrete columns at front that building, the span was too wide, if they want to build on that long wide span... They need a highly cualification engineer.

  • @openbook5888
    @openbook5888 3 ปีที่แล้ว +2

    The overall conclusion is
    double story suttering without bracing
    small surface area of scaffolding
    inclined scaffolding
    weak ground surface
    reinforcement overlap mistake
    Spacing of column

  • @ksa7010
    @ksa7010 4 ปีที่แล้ว +17

    Oh my God 😧

  • @czr7j9
    @czr7j9 3 ปีที่แล้ว +1

    i like how he says 'not a genius method' and 'no one is gone'

  • @velocitygaming7037
    @velocitygaming7037 4 ปีที่แล้ว +5

    I like whoever is voicing
    "Number First"
    "Number Second"

  • @impossibleisnot2868
    @impossibleisnot2868 2 ปีที่แล้ว

    Sir
    You will make regular this type of video....
    Thanks 🙏🙏🙏🙏

  • @Rolandus42
    @Rolandus42 3 ปีที่แล้ว +10

    I think there should be at least one person in charge who has actually "studied" structural analysis and/or has a very good/professional understanding of scaffolding. However, developing country!

    • @Unknown-si8yx
      @Unknown-si8yx 3 ปีที่แล้ว

      Can't use developing country as an excuse this was carelessness and no respect for a structural engineer. They probably thought they could do the job without one.

    • @kidiyanagarmagansolanki9531
      @kidiyanagarmagansolanki9531 3 ปีที่แล้ว

      Hello

  • @freemindthinkerezrapound5071
    @freemindthinkerezrapound5071 2 ปีที่แล้ว +1

    Unbelievable decking I'm doing shuttering 40years and I can honestly say I never seen worse

  • @megaknight3705
    @megaknight3705 4 ปีที่แล้ว +32

    This happens when you take your degree from online classes..

    • @Sulimankhanacademy
      @Sulimankhanacademy  4 ปีที่แล้ว +2

      Hehehhe

    • @anurag6190
      @anurag6190 4 ปีที่แล้ว +3

      After offline classes I want to join Online classes. Our college had lack of teachers and lack of skilled teachers too as most of them left the college while we were in 3rd Semester because they got job elsewhere.
      After completing diploma I can clearly say I don't have knowledge even 30% of what a local contractor has. So I need online classes to polish my knowledge.
      पैसा बर्बाद *****

    • @ardacsdacs4481
      @ardacsdacs4481 4 ปีที่แล้ว

      It is not the work of an engineer or an architect or even experienced foreman, check the scaffolding installation, formworks and most especially the span between columns and depth of beam. Inexperienced people are just guessing what is the standard. Maybe no plan at all.

    • @manz007
      @manz007 3 ปีที่แล้ว

      @@ardacsdacs4481 There usually is a engineer on site or a contractor who is working for an engineer..... and structural analysis by an engineer should be done before making a building.

    • @manz007
      @manz007 3 ปีที่แล้ว

      @@anurag6190 Brother work with a local contractor 6 months or so like an internship and gain experience....he might not pay you but you will gain more experience that way.

  • @Robikreatif
    @Robikreatif ปีที่แล้ว

    this is why we need to study construction or engineering, we need an understanding of science from basic to advanced, just to determine a calculation, only to count, that's all, because if our calculations miss even a little then the consequences will be dangerous

  • @wibowodotid4076
    @wibowodotid4076 4 ปีที่แล้ว +6

    that engineer has a diploma from a give away

  • @KandalaEntertainment
    @KandalaEntertainment 3 ปีที่แล้ว

    The Miller mixer trally also a reason and heavy weight on the corner,
    first falls on that place .
    Only two pillars, and no connected beems are not there , the contractor done a worrest job means pillars and beems are started at a time.

  • @jessamaedejito7166
    @jessamaedejito7166 3 ปีที่แล้ว +8

    Thanks for this video. This is a great help for my study. Can I ask what project is this and where it is located? I can use this as my reference. Thank you in advance hehe

  • @DS_D.1
    @DS_D.1 3 ปีที่แล้ว

    This video is very useful & experience for engineers before avoid the mistake.

  • @Megazoid-my7cp
    @Megazoid-my7cp 4 ปีที่แล้ว +11

    I think you missed some important major comments. I observed that there were no girders and secondary beams at all in that video.
    No developed lengths bends and hooks were seen.
    If it were, beams must have been poured concrete altogether with slab commiting wrong sequence of work.
    They poured the whole top area in one setting.
    In standard construction chronologically, foundations, columns and floor girders are already in place properly cured prior to preparation of slab works.
    Span of colums and slabs seems it exceeded beyond their maximum distances.
    Not only did they violated building codes, they ignored at least the thumb rule of traditional building construction.

  • @Mj-th7md
    @Mj-th7md 3 ปีที่แล้ว

    At least we know that gravity still works. Thanks for the confirmation.

  • @godsoldier6240
    @godsoldier6240 3 ปีที่แล้ว +9

    If it collapsed during construction imagine after they build the building

  • @jeromeguevarra8914
    @jeromeguevarra8914 3 ปีที่แล้ว

    Additional scaffolding to slab safety first is da best i am a Construction workers in the Philippines i am a pipe welder

  • @Devoneakapimp
    @Devoneakapimp 4 ปีที่แล้ว +3

    It doesn’t take an engineer to realize that the structure dud not have proper support whatsoever.

  • @OOOUZ
    @OOOUZ 2 ปีที่แล้ว +2

    Perrasan?

  • @ramilalinjr.5421
    @ramilalinjr.5421 4 ปีที่แล้ว +6

    The engineer skipped the Moment lecture.

  • @Engrrahim186
    @Engrrahim186 5 ปีที่แล้ว +2

    Great explanation ❤👈

    • @Sulimankhanacademy
      @Sulimankhanacademy  5 ปีที่แล้ว +1

      thank you so much dear for such a great appreciation ....

    • @Engrrahim186
      @Engrrahim186 5 ปีที่แล้ว

      @@Sulimankhanacademy ❤

  • @johnlevalc6152
    @johnlevalc6152 4 ปีที่แล้ว +15

    THE ENGINEER HERE IS GRADUATED FROM BEERHOUSE UNIVERSITY

  • @blindsspecialist327
    @blindsspecialist327 4 ปีที่แล้ว +1

    Great balls of fire🔥 ... I peel like a pool.... they can build a pool with that newly bent rebar

  • @jimmyuy8353
    @jimmyuy8353 4 ปีที่แล้ว +35

    The engineer buy his diploma from the public market. 😂😂😂

  • @srinivaspingeli4780
    @srinivaspingeli4780 4 ปีที่แล้ว

    Good explan distance etc. Thanks.

  • @tantaryz.m.7403
    @tantaryz.m.7403 3 ปีที่แล้ว +3

    The collapse is certain, I watched the situation more than 30 times, I actually pointed the mistake that led to this huge loss!!
    I worked it out!

    • @Sulimankhanacademy
      @Sulimankhanacademy  3 ปีที่แล้ว +1

      Share what you have pointed out so others can learn from your comment ❤️❤️❤️

  • @ncotxogthaumntawv3814
    @ncotxogthaumntawv3814 ปีที่แล้ว

    Thanks for sharing the analysis

  • @VIRALVIDEOSYTofficial
    @VIRALVIDEOSYTofficial 4 ปีที่แล้ว +8

    hahaha we all know what's the funniest part from this video 😁😅

  • @filipinalifelivinginspain45
    @filipinalifelivinginspain45 4 ปีที่แล้ว

    Sana yung mga workers maayos sila

  • @prashanthynk
    @prashanthynk 4 ปีที่แล้ว +3

    The narrator's English sounds like "OSHO" speaking 😭

    • @Sulimankhanacademy
      @Sulimankhanacademy  4 ปีที่แล้ว

      Who is osho?

    • @djrobwag
      @djrobwag 3 ปีที่แล้ว

      @@Sulimankhanacademy Rajneesh, also known as Acharya Rajneesh, Bhagwan Shri Rajneesh, and later as Osho, was an Indian godman, mystic, and founder of the Rajneesh movement.

  • @omveer8310
    @omveer8310 4 ปีที่แล้ว +1

    Amazing techniques workers

  • @dan2soy191
    @dan2soy191 4 ปีที่แล้ว +12

    It looks so many post has been used 😂

  • @skchandan4484
    @skchandan4484 ปีที่แล้ว

    Thanks for good news 😀 all are live

  • @cactuslovesballoons8581
    @cactuslovesballoons8581 4 ปีที่แล้ว +11

    Now, I've heard of flying buttress, but this...

  • @mizailhossainsaimon1570
    @mizailhossainsaimon1570 3 ปีที่แล้ว +1

    Lockdown..with corona 😅
    Then student auto passed engineer 🤣

  • @therealdonchelios
    @therealdonchelios 4 ปีที่แล้ว +3

    Number second 🤣🤣 I'm always saying that from now.

    • @Sulimankhanacademy
      @Sulimankhanacademy  4 ปีที่แล้ว

      Hehehe. Why? Is that funny?

    • @danstine4440
      @danstine4440 4 ปีที่แล้ว

      Because it’s not number second, it’s number two, number one, not number first, number three not number third, number five, not number fifth.practise that’s all.

    • @Sulimankhanacademy
      @Sulimankhanacademy  4 ปีที่แล้ว +1

      🤣😂 i usually use those

    • @KazKasozi
      @KazKasozi 3 ปีที่แล้ว

      Made me smile ☺

    • @paradoxlab2023
      @paradoxlab2023 3 ปีที่แล้ว

      @@Sulimankhanacademy nothing much of concern as long as we understand what you are trying to tell us.
      Still, there's always a room for improvement. So, do work on your English language a little bit.

  • @mayongyumakhi7466
    @mayongyumakhi7466 2 ปีที่แล้ว

    Ino dimanaa? Ngeriii bangettt. Monga tidak ada korban jiwaa

  • @timavery7984
    @timavery7984 4 ปีที่แล้ว +11

    How about this reason : it’s all a piece of crap.

  • @aaaa-d1t2s
    @aaaa-d1t2s 2 ปีที่แล้ว +1

    high water cement ratio and leakage of water through shuttering and making the ground damp and as load increase due to concreting the props giving way to settlement of props and leading to failure. also due to large column spacing

  • @shainacostas
    @shainacostas 4 ปีที่แล้ว +5

    Omg keep safe always

  • @godbluffvdgg
    @godbluffvdgg 3 ปีที่แล้ว +2

    Number first! You should have just drawn a big green box around that entire form shoring...:) It's like little kids built it...

  • @louisjan4988
    @louisjan4988 4 ปีที่แล้ว +9

    On ideas use the metal instead of crops wood

    • @TemplarX2
      @TemplarX2 3 ปีที่แล้ว +3

      Exactly. Cheap costs them more. I remember a guy in my home town doing the same thing to cut cost and everyone was telling him not to do that. He did it still and his roof collapsed like this. Well, they told him so.

  • @kukidreamer57
    @kukidreamer57 ปีที่แล้ว +1

    I'm not an architect but I know whoever the Project Manager is Fire him! As for the so called scaffolding, you should have used chopsticks probably stronger. Having a empty space between the roof and dirt doesn't help. You could have rented for storage place. The list goes on. Bravo feel so much safer knowing you guys are on it!

    • @tolykozin
      @tolykozin ปีที่แล้ว

      the people in charge of these projects should be jailed. when you have non qualified engineers managing these projects, this is what happens. Shameful that this happens even today

  • @AsjadSS
    @AsjadSS 2 ปีที่แล้ว +3

    What an amazing accent 🤣

  • @nmew6926
    @nmew6926 2 ปีที่แล้ว

    Indian workmanship

  • @Engrwaleed555
    @Engrwaleed555 5 ปีที่แล้ว +6

    Always consult an engineer before doing any concrete work. Most of the contractors are illiterate, They don't know nothing about engineering.

    • @Sulimankhanacademy
      @Sulimankhanacademy  5 ปีที่แล้ว

      yes dear you are right

    • @MasterCivilEngineering
      @MasterCivilEngineering 4 ปีที่แล้ว

      See here more

    • @pappuray3410
      @pappuray3410 4 ปีที่แล้ว

      Yes, most contractor does not appoint any engineer at construction site, so that events takes place. So it is not an engineer's fault as most of you talking in comment block. Contractor does anything without any technical knowledge. For saving money.

  • @joserojas1532
    @joserojas1532 4 ปีที่แล้ว +2

    That shit was coming down even if everything went ok on the concrete poured,at the moment of removing the logs that shit was going down!

  • @PSYCHIC-bc1of
    @PSYCHIC-bc1of 4 ปีที่แล้ว +8

    Wrong scaffolding support

  • @GBooneoh
    @GBooneoh 3 ปีที่แล้ว +1

    nice analysis. hope to see more of these

  • @arminyaakub8719
    @arminyaakub8719 3 ปีที่แล้ว +8

    മലയാളീസ്

  • @nusantarachannel93
    @nusantarachannel93 2 ปีที่แล้ว

    Arsitek di perlukan jika membangun bangunan yg besar

  • @Goodnight1127-b9r
    @Goodnight1127-b9r 3 ปีที่แล้ว +5

    Νumber First!!!

    • @buskati6542
      @buskati6542 3 ปีที่แล้ว

      🤣i was going to comment that

    • @marinonglubas6103
      @marinonglubas6103 3 ปีที่แล้ว

      Wrong grammar ka agad hahaha

  • @oshawottschamber1937
    @oshawottschamber1937 2 ปีที่แล้ว +1

    Well, there are no columns there in front and whatever column exist, it's not enough. Considering that height, columns is more necessary

  • @francistumwebaze1774
    @francistumwebaze1774 2 ปีที่แล้ว +1

    Another reason for collapse the structure; the engineer might have stolen money for cement and iron bars.

  • @ravinderthota685
    @ravinderthota685 ปีที่แล้ว

    The total failure is shuttering work. Shuttering should be designed take all the superimposed loads as well as the dead load of concrete with factor of safety consideration. Second the beams are not appears abd if the columns are more span the load factors must be considered and the shuttering ptops must be heavier than wooden props and proper bracing with titling moments must be checked. The props must be fitted in solid base so that no proper will move or sag.

  • @FATMINER-lb3ww
    @FATMINER-lb3ww 2 ปีที่แล้ว +1

    prime reason shoring a deck with bamboo