LRT-1 Trainspotting in Dr. Santos and Ninoy Aquino Stations EARLY ACCESS! / LRT1 Cavite Extension

แชร์
ฝัง
  • เผยแพร่เมื่อ 5 ม.ค. 2025

ความคิดเห็น •

  • @tenny_tenten
    @tenny_tenten หลายเดือนก่อน

    Is it me or the sound/noice interaction of the train and the track are the same as the MRT Line 3, looks like the concrete plinth style track are responsible for that noise, for me atleast

  • @deanalilio3930
    @deanalilio3930 หลายเดือนก่อน +1

    They say na kaya di magawan ng safety barrier ang LRT1 stations e dahil iba-iba yung configuration ng mga pintuan ng mga trains base sa gen. Di natin alam kung alin yung di swak, pero ang magandang gawin nila eventually jan, if magkakaroon ng gen5 and so on na mga tren, e igaya sa configuration ng current latest na gen4. para pag nagphaseout ng gen2 at gen3, yung mga current at future na mga tren e pare pareho na configuration ng mga pinto, so pwede na ngayon gawan ng safety barrier na swak sa lahat ng gen.

    • @JetpackBlackSpeakerman.
      @JetpackBlackSpeakerman. หลายเดือนก่อน

      actually dahil lang po sa pagbukas ng pintuan ng Gen 1 po yan. sa 2G, 3G, at 4g, pumapasok yung pintuan sa loob ng tren, yung Gen 1 naman po, sa labas po.

    • @deanalilio3930
      @deanalilio3930 หลายเดือนก่อน

      @JetpackBlackSpeakerman. di na naman issue ang gen1 kasi matagal nang phaseout. yung LRMC talaga ang nagsabi dati na iba-iba yung configuration. kasi kung gen1 lang ang problem at oantay pantay naman lahat ng bukasan ng mga pintuan e di walang dahilan para di lagyan ng barrier

  • @MohdFarrellAchbiJavaz
    @MohdFarrellAchbiJavaz หลายเดือนก่อน +1

    will it connect to NAIA T1?

  • @louminamilana5272
    @louminamilana5272 หลายเดือนก่อน

    LRTA 14000 CLASS CRRC SIEMENS 5TH GENERATION TRAIN
    Doors: 5
    Articulated Cars: 3 Similar To 1000 Class
    LED Destination Boards: 3
    Air Conditioning Units: 3
    LRV Fleets: 168
    Trainsets: 56
    Traction: IGBT-VVVF (Bombardier MITRAC 1508C)
    Speed: 60Kph
    Bogies: 2
    Jacob Bogies: 2
    Gangways: 2
    Pantograph: 1
    Cars: 3
    Axle: 8
    Seats: 13
    Wheel Chair Sign: 2
    Handrails Doors: 16
    Handrail Ceilings: 18
    Handrail Handles: 108
    Interior Route Maps: 2
    Car Body: Stainless Steel
    Exterior Rectangle Red Lights: 10
    Interior Circle Yellow Lights: 10
    DOTR & LRTA Logos Exteriors: 4
    DOTR & LRTA Logos Front & Rear: 2
    Border Lines Color: Red
    Build At China
    Manufacturer: CRRC Siemens
    Includes: Themed Trains & Adwraps
    Lines Served: LRT 1
    Depot Served: Baclaran Parañaque & Zapote Cavite

  • @emmanueljanquezon962
    @emmanueljanquezon962 หลายเดือนก่อน +2

    Pashout out po been a fan for the past 2 years na po

    • @AngLitratistaNgDaangBakal
      @AngLitratistaNgDaangBakal  หลายเดือนก่อน +1

      Thank you for supporting! @emmanueljanquezon962
      Ingat po sa biyahe! 🎉🚉

  • @Burgercat
    @Burgercat หลายเดือนก่อน +1

    Wondering why the station platforms aren't level with the train floor...

  • @pasaloofficial1923
    @pasaloofficial1923 หลายเดือนก่อน

    how to get there po? commuting from bacoor/las pinas?

  • @montesa35
    @montesa35 หลายเดือนก่อน

    Siguro pati 1st gen pwede na dumaan ng Cavite Extension, wag lang palaging hanggang Baclaran lang pag mangagaling Roosevelt (FPJ). Baka naman haha.

  • @carlolauron1447
    @carlolauron1447 หลายเดือนก่อน +3

    Wla b pasneak peak sa pitx station? 😂 eto yta pinaka ginigate keep ng lrt haha

  • @amandaleannemarinda1711
    @amandaleannemarinda1711 หลายเดือนก่อน

    Madali na yan pag pupunta kaming pitx terminal ni nanay para di na kami hahatid ni papa utoy ng kotse gastos pa sa gasolina.

  • @Uios5
    @Uios5 หลายเดือนก่อน

    Nakakaingit

    • @pinoypooltv
      @pinoypooltv หลายเดือนก่อน

      bakit?

  • @mjuneoginn
    @mjuneoginn หลายเดือนก่อน +1

    Now that the LRMC/LRT-1’s 3rd & 4th GEN Trains are tested and proven to be ready for the CAVITE Extension Line:
    Guess the remainder of LRT Line 1’s 1st & 2nd GEN Trains should follow suit as well- might as well as the DOTR-MRT Line 3’s 1G/CKD-Tatra- Mitsubishi Heavy Industries & the accursed 2G/ DALIAN China Trainsets, for compatibility runs

    • @Burgercat
      @Burgercat หลายเดือนก่อน

      1G and 2G were both tested but 1G is decommissioned already and 2G is only used as a skip train. MRT-3 trains require a signalling system upgrade since it is incompatible with LRT's.

    • @number_1_yowi_hater_lol899
      @number_1_yowi_hater_lol899 หลายเดือนก่อน

      Bukas na po lrt Cavite sabi po ni Marcos Nov 16 2024 open mga 5 am ng umaga

    • @MatthewMilana
      @MatthewMilana หลายเดือนก่อน

      @@number_1_yowi_hater_lol899 LRMC/LRT-1’s 5th GEN Trains (Siemens Bombardier MITRAC)