A DAY in the LIFE of the DATA CENTRE | GENERATOR TESTING with ASH!

แชร์
ฝัง
  • เผยแพร่เมื่อ 18 พ.ย. 2024

ความคิดเห็น • 462

  • @KizaruB
    @KizaruB 3 ปีที่แล้ว +161

    A video of a data center power failure sent me here

  • @AxelWerner
    @AxelWerner 3 ปีที่แล้ว +52

    The sheer volume and sound is scary enough. But if you also image the amount of energy, enough to vaporize you in a bright flash, is being transferred and switched, its terrifying.

    • @GideonMesser
      @GideonMesser 3 ปีที่แล้ว +9

      It's only a danger if you opened the enclosure door. It's not enough to vaporize you, but it definitely could give you serious third-degree burns. The enclosure is designed to handle the worst-case arc incident.

    • @vinny142
      @vinny142 3 ปีที่แล้ว +2

      He did just say that the generator is "only" 500kw. I think you're thinking of powerstation where they put on protective suits to throw a switch, they handle a bit more power than these single sections of a datacenter do. It's still a scary amount, but peanuts compared to what the big boys do.

  • @hoang-himself
    @hoang-himself 3 ปีที่แล้ว +65

    I see youtube algorithm has chosen this channel

    • @HirekYT
      @HirekYT 3 ปีที่แล้ว

      Yes

    • @cameltoast
      @cameltoast 3 ปีที่แล้ว

      Same here! It's so dumb! I thinks I'm only interested in the last thing I accidentally clicked on and ONLY that, there's people I'm still subscribed to that I've forgotten existed because it's showing me Tiktok and a UPS in a data center failing.

  • @sapincher
    @sapincher 3 ปีที่แล้ว +83

    7:03 "Sorry was that 'yes' or 'not yet'?"
    "Nawts... Yest"
    "OK just gonna do the thing"

    • @Patrick-tf1ri
      @Patrick-tf1ri 3 ปีที่แล้ว

      Lmfao!!!

    • @AbsoluteTVYT
      @AbsoluteTVYT 3 ปีที่แล้ว +8

      He said "Sorry, yes."
      ...in a mildly frustrated tone of voice

  • @tonysneesby6199
    @tonysneesby6199 3 ปีที่แล้ว +18

    It is good to see that some companies do a proper full test of the whole system as i have found that some computer bosses will not allow this full changeover but only to run the generators for a short amount of time that does not do them any good without a load and does not give any indication that the whole system will work as designed when a mains power failure occurs,Foolhardy!

  • @elliotalderson6769
    @elliotalderson6769 3 ปีที่แล้ว +17

    This is a channel I never knew I needed in my life.

  • @Felix-ve9hs
    @Felix-ve9hs 5 ปีที่แล้ว +197

    I am just about to get a small UPS for a FreeNAS Server - Now if feels like a joke 😂

    •  5 ปีที่แล้ว +7

      Get the 1400 not the 700.

    • @Felix-ve9hs
      @Felix-ve9hs 5 ปีที่แล้ว

      @ sorry i don't unterstand

    •  5 ปีที่แล้ว +8

      @@Felix-ve9hs 1400VA

    • @steveurbach3093
      @steveurbach3093 5 ปีที่แล้ว +3

      Don't skimp. Get a bit larger. Did you include everything you need for the stability (monitor, remote modem or KVM)? Does it allow extra batteries for more run timeor do you pick the biggest VA so you are far DOWN on the load vs runtime curve

    •  5 ปีที่แล้ว +3

      Depends on where you are we have a power failure roughly every ten years for fifteen minutes to half an hour. In Thailand it's a few times a day and brown outs at random.

  • @jackprice6599
    @jackprice6599 3 ปีที่แล้ว +9

    Very good that you test the generators under full load, diesel loves to be run hard.

  • @woodstockenvy4666
    @woodstockenvy4666 4 ปีที่แล้ว +6

    Hearing a Gen-Set under load ... the most "Beautiful Sound on the Planet" .. during a prolonged power outage. Cheers ........... thanks for sharing this

    • @haithem_abed
      @haithem_abed 3 ปีที่แล้ว +1

      I love that too ❤️

    • @AureliusR
      @AureliusR 3 ปีที่แล้ว

      Why did you put quotes around Beautiful Sound on the Planet?

  • @kristianojanen425
    @kristianojanen425 5 ปีที่แล้ว +18

    Just found this channel yesterday and it has quickly become one of my favorite channels. Keep up the good work and the videos coming!

  • @andydelle4509
    @andydelle4509 2 ปีที่แล้ว +9

    Not sure how your large UPS systems work in the UK but here in the USA, UPS systems of this size and class are always online. We call it double conversion where the utility (mains) AC is rectified and float charges the battery bank. The inverter is always feeding the load. As the rectifier and battery are DC, they are simply spliced together. There is no switch involved. The rectified mains DC is normally about 10 volts above the battery string voltage to keep the batteries in charge mode. Of course there is a static and maintenance bypass switch on each UPS but normally the UPS output is never interrupted during a grid failure. Also at this size, we normally run at 480 volts which is a US standard distribution voltage, that is stepped down to 120/208 volts for the loads.

  • @Jonathan_O
    @Jonathan_O 5 ปีที่แล้ว +8

    Nice facility - very clean.

  • @dj_paultuk7052
    @dj_paultuk7052 5 ปีที่แล้ว +6

    Cool to see this being done. I work in a DC as a hall engineer. Changing Server motherboards etc. So i hear the tests happening but we never get to see whats being done.

  • @vcokltfre
    @vcokltfre 5 ปีที่แล้ว +27

    My inner "What if it goes wrong? scenario" and "intermittent beeping noises" nerds are going crazy for this video

    • @alfaheston
      @alfaheston 3 ปีที่แล้ว

      Well you just gotta go to the generator then find out what the alarm about....if you can clear the alarm...then you should start the generator manually...then let the ATS/STS take over when power is Stable from Generator, otherwise you should hustle to fix the cause of alarm....

    • @toranine09
      @toranine09 3 ปีที่แล้ว

      @@alfaheston i think you misunderstand the person’s comment

  • @deanmarsh1452
    @deanmarsh1452 3 ปีที่แล้ว +9

    Great to see this being done properly! Far too many places run the generators unloaded as a test.. :/

    • @sjf4405
      @sjf4405 3 ปีที่แล้ว

      Management is always too scared.

    • @deanmarsh1452
      @deanmarsh1452 3 ปีที่แล้ว +1

      @@sjf4405 always ends up biting you in the ass!

    • @robertlitman2661
      @robertlitman2661 3 ปีที่แล้ว +4

      A loaded test is required to meet NFPA 99 testing requirements. Many newer installations that have an iso-parallel bus will have an on-site load bank so that individual gensets can be tested at full design load, without placing any undue risks on customer equipment. In the example here, one of the parallel generators is turned down in order to increase the load on the remaining units, but doing this presents the risk of running without your engineered redundancy, and still falls short of design loading. The extremely long ATS neutral delay also serves no purpose other than unnecessarily damaging UPS batteries.

    • @biggreenblob
      @biggreenblob 3 ปีที่แล้ว +1

      That's not a test, just exercising the engine. Absolutely foolish not to test under load on a regular basis.

  • @weirdvideochannel3642
    @weirdvideochannel3642 5 ปีที่แล้ว +3

    Please please please please make these more often :D I watched one video and I HAD to watch those others too! I absolutely LOVE these videos! Thanks for the entertaiment!

  • @whitepropertysolutionsltd7351
    @whitepropertysolutionsltd7351 3 ปีที่แล้ว +4

    Just found the channel and love it. What a great idea shows transparency within the industry, I work for NTT Global EMCA at my site with have 40 Gen-set at 1250kw total load. all of our network is via PLC so we can export back to the grid. keep it up guys

    • @hariranormal5584
      @hariranormal5584 3 ปีที่แล้ว

      oh wow you work at NTT, does NTT offer single U colo or so in their locations

  • @UQRXD
    @UQRXD 3 ปีที่แล้ว +4

    The transfer switch we had was a 3 pump up then turn the knob. Them BAM! It made me jump too like you feel the amps. Then the generator diesel pumped out black smoke for a few seconds while picking up the load. Zero automation by the way.

  • @sla5885
    @sla5885 3 ปีที่แล้ว +6

    Nice job, just a quick clarification,why ATS -6 gen takes too long to be up. usually it's less than 12-15 sec. but here it took more than 30 sec .

  • @aperitifs
    @aperitifs ปีที่แล้ว +6

    A friend of 20 years works at Services Australia, Centrelink, Medicare, Many more Data Centre.. he blew my mind when he told me about a Direct Fuel line that runs from a Petrol Service Station close by, Directly to there Generators..... ( He said the system must never go down )

    • @aperitifs
      @aperitifs ปีที่แล้ว +1

      Be interesting to know if it’s unmetered at the servo , direct pipe from main diesel tank , or possibly other fuels ,
      And at the government generator plant room , they have a meter for whatever fuel that is pumped from the service station (the servo might have a auxiliary tank that is rented to the Australian government owned (services Australia )
      That way re filling the emergency fuel tanks can be done at the (BP , or Caltex )
      Better than having a massive fuel tanker enter the complex

    • @b43xoit
      @b43xoit ปีที่แล้ว

      "their", please.

  • @jonathaningram8157
    @jonathaningram8157 3 ปีที่แล้ว +11

    So, can those guys say they drive a V10 at work?

  • @David-hu1hq
    @David-hu1hq 3 ปีที่แล้ว +28

    Who came from the youtube algorithm?

  • @robk5969
    @robk5969 5 ปีที่แล้ว +6

    i know this may be a bit of a secret topic, but i would love to see a video about some of the security of the DC, both network and physical, monitoring and detection, prevention and response

  • @tontyrutinel7680
    @tontyrutinel7680 2 ปีที่แล้ว +6

    I felt like George Russell was giving me the tour

  • @biggreenblob
    @biggreenblob 3 ปีที่แล้ว +3

    Awwww those are some cute little generators!

  • @garlet69
    @garlet69 3 ปีที่แล้ว +15

    The dude on the radio sounds like a imperial droid

  • @AuthorisingEngineer.online
    @AuthorisingEngineer.online ปีที่แล้ว +2

    Thank you, this is absolutely golden information

  • @ihaveacoolhat1
    @ihaveacoolhat1 2 ปีที่แล้ว +1

    I work in a DC myself as an engineer and it was cool to see the differences and similarities between my site and yours. Wish we had radios though!

  • @thibaultghesquiere
    @thibaultghesquiere 5 ปีที่แล้ว +1

    That's really great to get info straight from datacenter guys like you, keep up the good work !

  • @kampfighterjet8662
    @kampfighterjet8662 5 ปีที่แล้ว +7

    Do you inform you "grid" about that test? I wonder how they compensate the loss of the load in the grid when you're doing the tests. thx

  • @EpicATrain
    @EpicATrain 5 ปีที่แล้ว +26

    I swear I thought I heard him say "not yet" and then you say okay, let's turn the key. lol

    • @WhitfieldProductionsTV
      @WhitfieldProductionsTV 5 ปีที่แล้ว +6

      I swear it was "Not yet" and then he did say okay and turned it lol. I guess if it was "not yet" and he did that, we would of heard some non so nice of oxford english.

    • @Timooooooooooooooo
      @Timooooooooooooooo 5 ปีที่แล้ว +3

      I heard "I don't see any reason not to" instead of "not yet"

    • @mrbburba
      @mrbburba 5 ปีที่แล้ว +1

      @@Timooooooooooooooo in other Words: Whatever happens after you turn the key off. Im not responsible for what happens next :D

  • @nlo114
    @nlo114 5 ปีที่แล้ว +22

    I have recently carried out a series of load-bank tests on mission-critical sets from 40kVA to 2000 kVA. The customer used to run the sets up once a month to make sure they started, but never ran on full load. A lot of them were over-specified, resulting in carbon build-up, sticky valves, clogged silencers etc. My job was to run the sets up to 100% of plate rating for 4 hours, to make sure that they do not fail under operating conditions. After the usual checks and inspection, staged increases of loading, (5 minutes warm-up, 5 minutes 10%, 10 minutes 25%, 10 minutes 50%, then the balance of 4 hours at 100%), were implemented. One set would only run to 80% without overheating, another had a failed turbo-charger bearing, another had a radiator leak that only showed on full load, etc, etc. Once the test is complete, a 10 minute no-load cool-down period is done.
    Once the customer was aware of the issues, and they were dealt with, their decision was to load-bank the sets bi-weekly. (It's a great job for a winter's day; parking 20 feet in front of a 400kW fan-heater certainly keeps the van warm!)

    • @TheManLab7
      @TheManLab7 5 ปีที่แล้ว

      How come you didn't do an overload test like running them at 110%?

    • @Mecrom
      @Mecrom 5 ปีที่แล้ว +2

      @@TheManLab7 I am guessing because overloading is generally not a situation the generator is designed to handle on a bi-weekly schedule and might result in damage more than detect it.

    • @kingrpriddick
      @kingrpriddick 5 ปีที่แล้ว +2

      @@TheManLab7 I imagine they were accurately specified and would never run at 110%. The control systems should not be designed to ask for a damaging output from the genset. Another assumption here but in the case of less than N working generators during an outage I would program the control software to keep the generators capped at 100% and use the UPSes to hold up the rest of the loads while a decision is made about which loads to cut or throttle down if it is not automatic. If you need 3 gensets and you only have 2 running it is better to keep your 2 at 100% by cutting loads (assuming you can't hold the excess load until an emergency genset can arrive) than it is to go dark because you broke them trying to keep everything running. If I was running a NOC all my major services/applications would need to be locally throttleable, at least manually.
      Your question isn't silly, I just don't think that's the way NOC administrators and operators think.

    • @CKOD
      @CKOD 5 ปีที่แล้ว +1

      That must have been a nice smokeshow as the exhaust got up to temperature for the first time a in a long while.

  • @darklocksly3615
    @darklocksly3615 5 ปีที่แล้ว +1

    Would like to see a video on the type of, and how you test you're fire suppression system(s).
    Love these video's as they give us more insight on the daily workings in a DC, and see that the people working there enjoy their jobs.

  • @GaryMeolaJr
    @GaryMeolaJr 4 ปีที่แล้ว +1

    Very informative ! Glad I found this channel.

  • @TheMightyKinkle
    @TheMightyKinkle 3 ปีที่แล้ว +15

    3:47 Subtitles say:
    "James you're sleeping"
    "Yes"
    😂😂

    • @Xaiff
      @Xaiff 3 ปีที่แล้ว +3

      QUALITY CONTENT

  • @anarqasimov79
    @anarqasimov79 3 ปีที่แล้ว +1

    Thank you very much for fantastik video👍👍👍Greate job!

  • @RKSNomad
    @RKSNomad 3 ปีที่แล้ว +4

    these sites are amazing. I take care of a couple of unmanned ILA's for a national data line and the system there is entirely automatic, we do a test every 6 months, even though i've requested a minimum 3 months due to the nature of these sites on the network.... BUT its absolutely terrifying hearing the ATS click, especially since mine is a 3 way between mains, all open and gen. the click is powerful enough to shake the hut and you can feel the transfer through the earth.

  • @nashfunk389
    @nashfunk389 3 ปีที่แล้ว +3

    i love how this all comes across as a walk in the park during the test. I've been on site during a power failure waiting for a generator to kick in before the UPS dies and i can tell you its one of the most stressful times in an IT guys life....

  • @itiswhatisis8174
    @itiswhatisis8174 3 ปีที่แล้ว +15

    I feel like slamming a door would give this dude ptsd

    • @jonathaningram8157
      @jonathaningram8157 3 ปีที่แล้ว

      Ikr.

    • @itsourlife
      @itsourlife 3 ปีที่แล้ว

      🤣😂🤣😂 Totally he's too jumpy

    • @billyhorton5779
      @billyhorton5779 2 ปีที่แล้ว

      Needs to clean out his shorts after this video!

  • @a.dudeman7715
    @a.dudeman7715 3 ปีที่แล้ว +6

    I have a question, if you guys are still watching comments.
    Why put the UPS outside of the load for normal operation conditions? What's the benefit of doing so? It almost seems like it'd be much more expensive to do it that way, but I'm sure there's some benefit to it.
    I'm more used to mains/gen > UPS > load (with a automatic switch between the mains and the generators in case of mains failure), since the company I work for uses the UPS not only as a immediate backup but also to clean up the power going into the server racks.

    • @Xorgye
      @Xorgye 3 ปีที่แล้ว +2

      I don't understand you. A UPS is always in the load and always out of the load. The batteries are always outside on the backup line. And depending on the configuration (mostly due to specs like load), the basic components (filters, inverters and static switches) are on the main or on the backup lines.

    • @adpmol
      @adpmol 3 ปีที่แล้ว +1

      I would say efficiency, most server PSU's have capacitors that will keep the server going when switching the relays.
      The correct term is an On-line UPS or Off-Line like shown here.

    • @kruemel534
      @kruemel534 3 ปีที่แล้ว +1

      I'm pretty sure that's what they're doing.

    • @lukejohnson5165
      @lukejohnson5165 3 ปีที่แล้ว

      @@adpmol that an online Riello UPS, the generator supply will be filtered through the UPS as the only way for the load to be diverted from the system would be to place the unit into static or external bypass, in which case the UPS would not support the transfer. He has just simplified the process as when the UPS is online its only function is to clean the sinewaves.

  • @nerosmero1183
    @nerosmero1183 5 ปีที่แล้ว +1

    great work guys!! scaring during CB operation happens to me everytime too :)

  • @satinwhip
    @satinwhip 3 ปีที่แล้ว +16

    Man, that's a lot of power out of that tiny engine. Ours is .9 megawatt and is easily three times that size. It's the one part of my job that I truly loathe - monthly engine runs. It is incredibly foolish to stand in front of those ATS panels when the transfers takes place. I flip the switch and take off. I can get out of the room into a safe spot before the transfer takes place. Hopefully this guy won't end up in some arc flash accident video later on down the road. it scares me just watching him in this video.

    • @Ergzay
      @Ergzay 3 ปีที่แล้ว +9

      Given the lack of high voltage warnings anywhere, I imagine that they're safe from arc flash with the cabinets closed.

    • @kruemel534
      @kruemel534 3 ปีที่แล้ว +4

      A V10 is pretty much never a tiny engine.

  • @JoaoSilva-gs5jb
    @JoaoSilva-gs5jb 5 ปีที่แล้ว +4

    you should've said "bravo Six, going dark" on the radio, the other guy sounded like makarov on the radio. You getting scared gets me all the time 🤣🤣🤣🤣

  • @mitsuda
    @mitsuda 3 ปีที่แล้ว +29

    You can tell this dude is on the verge of a nervous breakdown.

    • @mitsuda
      @mitsuda 3 ปีที่แล้ว +2

      @@TAK-YON_ well, yeah. I mean, game recognizes game

  • @TheFlatronify
    @TheFlatronify 5 ปีที่แล้ว +7

    Interesting video. Thank you!
    What are the green dongles in the background at 12:00+?

    • @randomrick
      @randomrick 5 ปีที่แล้ว

      probably battery packs for their radio devices

  • @databeestje
    @databeestje 3 ปีที่แล้ว +2

    That's a nice PHP weathermapper graph you have there :)

  • @robe6939
    @robe6939 3 ปีที่แล้ว +2

    Great video , very well explained ⚡️

  • @hotrex7779
    @hotrex7779 5 ปีที่แล้ว +3

    Interesting to see this being done this is something I get involved in . Just wondering what if the electronics don’t work are you able to start and sync the generators by hand and switch the system by hand ?

  • @Phantomthecat
    @Phantomthecat 5 ปีที่แล้ว +2

    Good video - I used to do monthly genset testing on several large data centres (From 3 to 12 Meg). Once had the mains actually fail just before I conducted the test - saved me some work. 👍😁. Gensets on the 3MVA setup were V12 50 litre engines, the 12 meg site had 6 x 2MVA - 78 litre, V20’s. 👍

    • @KaesOner
      @KaesOner 3 ปีที่แล้ว +1

      do you want a medal or a cookie?

  • @Kru-works
    @Kru-works หลายเดือนก่อน +1

    great video, why is it taking so long to switch from primary to secondary input?
    does it need to sync frequenzy or something?

  • @mozilla2d
    @mozilla2d 3 ปีที่แล้ว +23

    linus tech tips data centre edition

  • @9thCtrlAltDelete
    @9thCtrlAltDelete 5 ปีที่แล้ว +1

    At my company we use a manual diesel generator which means we have to manually swap all distribution boards one by one to the gen which is fun lol, jealous at how simple and automated a data centre can do it which makes sense when you cant afford any downtime whatsoever

  • @TheHermitHacker
    @TheHermitHacker 5 ปีที่แล้ว

    Great to see this stuff. Thanks for showing us this testing.

  • @tekvax01
    @tekvax01 5 ปีที่แล้ว +3

    Those big ATS auto breakers scare the $#@^& out of me too! every time!!

  • @MatzeMaulwurf
    @MatzeMaulwurf 3 ปีที่แล้ว +9

    Guy on radio: no, yes!
    You should agree on clearly speaking. Look to aviation or military.

    • @Johnyquest1
      @Johnyquest1 2 ปีที่แล้ว

      Definitely heard what you heard -- god forbid the guy meant 'no', what would he have said? "Yes, no?!!?" ... Hopefully, however, the system is robust enough that no true level of 'readiness' is actually necessary, since as we all know, the power companies are more often than not unable to give a warning before the mains power goes out!

  • @MaiTayFoX
    @MaiTayFoX 5 ปีที่แล้ว +2

    Very nice to see this kind of procedure. Just curious what capacity are those UPS ?

    • @kingrpriddick
      @kingrpriddick 5 ปีที่แล้ว

      I was surprised to see the hold up time seem so short, what was that? Maybe 60 seconds to 90%, maybe it was rounding down to 90% so 20 minutes at best?

    • @HenryLoenwind
      @HenryLoenwind 5 ปีที่แล้ว +1

      @@kingrpriddick And I was surprised it's so long. 10-20 times the switch over to the generators is a huge safety margin. But that's probably needed to have enough of a buffer for the 2 hours to get a mobile generator when too many of the fixed ones fail.

  • @toppersailor96
    @toppersailor96 3 ปีที่แล้ว

    Ayyy, Edgar’s Water, the same water dispenser fairy that we have at work!

  • @johnreyn19
    @johnreyn19 3 ปีที่แล้ว +8

    I wouldn't stand in front of those breakers when they close.

    • @bryanjk
      @bryanjk 3 ปีที่แล้ว +4

      someone's going to argue there's very little reason to move but for me I don't wanna be the very unlucky soul to experience the arc flash from one of those 😂

    • @robertlitman2661
      @robertlitman2661 3 ปีที่แล้ว +3

      At least, don't be standing in front while wearing synthetic clothing (unless it's nomex), and look away.

  • @landykid
    @landykid 5 ปีที่แล้ว +3

    at 12:21 why did you guys blur out the stats of the gensets doesn't make much senseI wouldn't think to know what RPM and temperature and frequency is sensitive information

  • @stuff97
    @stuff97 5 ปีที่แล้ว +3

    extremely interesting video guys, keep it up 😉

  • @hansslob6749
    @hansslob6749 3 ปีที่แล้ว +4

    Question: do you contact your power supplier before starting the test? They will see a significant change in their power output the moment you switch off

    • @ShortnStubby
      @ShortnStubby 3 ปีที่แล้ว +9

      No the power company is usually not notified. The load change is not as much as one would think, he is switching one ATS at a time, not dumping the entire building onto the generators simultaneously. I worked in a descent size hospital, we had 3200KW worth of generator power and would switch over the entire building once a month, never called anyone outside the facility to notify of what we were doing.

    • @Darkk6969
      @Darkk6969 3 ปีที่แล้ว +3

      Depending on the size of the power grid. Really large ones won't even notice too much of a power change as it will rebalance automatically.

  • @muthaal2002
    @muthaal2002 5 ปีที่แล้ว +21

    Well in my country we don't need a generator test, as the test runs automatically at least 5 times a day 😂

    • @jamescollins6085
      @jamescollins6085 5 ปีที่แล้ว +2

      Are you saying that you have unreliable power?

    • @muthaal2002
      @muthaal2002 5 ปีที่แล้ว +2

      @@jamescollins6085 sure, in summer and winter we have 50% power time. Else we get 70-80% power time..

    • @angryjoshi165
      @angryjoshi165 5 ปีที่แล้ว

      Lol

    • @RadioChief52
      @RadioChief52 5 ปีที่แล้ว

      You must live in California!

    • @muthaal2002
      @muthaal2002 5 ปีที่แล้ว

      No I live in Baghdad

  • @CrezAU
    @CrezAU 5 ปีที่แล้ว

    Really cool video guys. Thank you!

  • @sjf4405
    @sjf4405 3 ปีที่แล้ว

    This may look simple but testing all these generators, ATSs, UPSs, and alarm setpoints WITH IT LOAD is very ballsy. Well done.

    • @ShortnStubby
      @ShortnStubby 3 ปีที่แล้ว

      you are absolutely right, i've seen an ATS hang up and fail to transfer and shorted out a dc rectifier and exploded the controller and blew the door open. Anyone switching breakers or ATS with load should either be standing outside the arc flash boundary when the actual switch happens or wearing an arc flash suite. There is enough current that when shit goes wrong, it goes wrong big time.

    • @Ergzay
      @Ergzay 3 ปีที่แล้ว +1

      I mean if you're testing it without load, you're not really testing it, so I question the value of the test.

  • @yappymat549
    @yappymat549 4 ปีที่แล้ว

    5:26 yes that contact made sure you knew it was kicking in.

  • @AlexRapada-ft6tm
    @AlexRapada-ft6tm 3 ปีที่แล้ว +4

    i need this for my off grid cabin data server

  • @richmiller9844
    @richmiller9844 5 ปีที่แล้ว +2

    Lookup what arc flash is. You should have protection gear. Good reason it makes you jump.

    • @waltbrown8899
      @waltbrown8899 5 ปีที่แล้ว

      Thank you, Rich...I was wondering why he was so jumpy (Yep, I looked it up)...it's not the noise, it's the danger of arc flash. Protective gear would be a good idea.

  • @djr1003
    @djr1003 3 ปีที่แล้ว +4

    Question. So Power output of your generator does not provide charge/power to UPS & its batteries when it comes online? Meaning it bypasses the UPS System entirely? Thank you!

    • @deanmarsh1452
      @deanmarsh1452 3 ปีที่แล้ว

      You'd think that would be hitting the UPS. You'd want that between the hardware and generator.. Unless there are other UPS's downstream.

    • @djr1003
      @djr1003 3 ปีที่แล้ว +1

      @@deanmarsh1452 Having done an IPVT of our system. The generator does supply power to the UPS. The UPS momebtsrioy goes on bttery as the ATS does its job. The UPS doesnt care where the power comes from (mains or generator) it cleans the energy through double conversion anyways.

  • @Razorlight0
    @Razorlight0 5 ปีที่แล้ว

    Love your videos guys. Keep up the good work!

  • @hugop973
    @hugop973 4 ปีที่แล้ว +1

    Hi, can you show a video of the power distribution, Switchgear, UPS, PDU and connection to the racks.

  • @SquareMilesfromCA
    @SquareMilesfromCA 3 ปีที่แล้ว +3

    Dang old switchover scares

  • @zeebeezoey
    @zeebeezoey 5 ปีที่แล้ว +2

    If the gennys don't get the signal to start, how long do you have on the UPS to get them started manually? Also, It would be great to see a split-screen version of this, watching the generators start up in real time with the ATS switching over

    • @MarioGaricTravel
      @MarioGaricTravel 5 ปีที่แล้ว

      Don't know if this will help, but generally, you'd be expecting at least 15 minutes of autonomy time although I reckon that these folks have at 20+ minutes.

    • @Newspaperman57
      @Newspaperman57 5 ปีที่แล้ว

      In a datacenter like that i would expect that they can run the complete 2 hours until a new generator gets there, on batteries. A datacenter cannot afford any downtime and batteries are cheap compared to the cost if they run out of power. A single rack loosing power for less than a second might take over 20 minutes to restart and booting up completely, which means thousands of people not being able to work, and that's just one rack, and assuming everything boots up normally

    • @kingrpriddick
      @kingrpriddick 5 ปีที่แล้ว +1

      @@MarioGaricTravel Based on the video, it looked like 10-20 minutes from extrapolating off the time the UPS was waiting for the genset to engage and the 10% drop in battery SOC displayed.

    • @kingrpriddick
      @kingrpriddick 5 ปีที่แล้ว +1

      @@Newspaperman57 Definitely not that long under the load we saw.

  • @grimjow_za
    @grimjow_za 4 ปีที่แล้ว

    Regarding the implemetantations of the generators, was there a handover, regarding what procedures to follow when it comes to testing, periodic checks, and switching over from the mains to the generators?

  • @tommywoldt9099
    @tommywoldt9099 3 ปีที่แล้ว +12

    I would really love to see Markiplier playing a horror game based in a datacenter with all the spooky beeps and bangs and having to get power back on while preventing your data form being erased by a murderous byteghost

    • @jayzo
      @jayzo 3 ปีที่แล้ว

      or IGP, who'd scream at every single bang

  •  5 ปีที่แล้ว +5

    12:38 what are the three green beans?

  • @alexcampion8529
    @alexcampion8529 3 ปีที่แล้ว +2

    I remember one time I was working in some 33kV circuit breakers in a switchroom (dead testing) and we agreed with the guy testing them that he would shout switching as a warning but he just mumbled it quietly and hit the button anyway. Loud enough and strong enough to shake the CB and and the room. We exchanged words as you can imagine. Anyway this just reminded me of it.

  • @andyclark1426
    @andyclark1426 2 ปีที่แล้ว +2

    The longest wait of your life when doing mains fail, 30 seconds waiting for generator contactor /ACB to close, a million possibilities go through your mind 😂😂

  • @D.Hozzie
    @D.Hozzie 3 ปีที่แล้ว +2

    Nice job. The zoo I work at as an electrician needs to take a hard look at the disrespect shown to our gensets.

    • @izalman
      @izalman 2 ปีที่แล้ว +1

      I can count on the fingers of 1 hand the number of standby sets I've seen installed in various locations shown ANY respect.

  • @hotfuzz1913
    @hotfuzz1913 3 ปีที่แล้ว +1

    Nice setup guys

  • @bernsteiner88
    @bernsteiner88 5 ปีที่แล้ว +5

    @ 5:27...get used to it man...LOL!!!

  • @SALCEDOML
    @SALCEDOML 9 หลายเดือนก่อน +2

    Just a question: Why you choose to run the gen-set for 4 hours?
    Is related to your particular SLA or is based on some norm or recomendation ?
    Thanks..

    • @kylelee639
      @kylelee639 8 หลายเดือนก่อน +3

      The tier of the data center. It’s mandatory by the tier you’re set at.

    • @SALCEDOML
      @SALCEDOML 8 หลายเดือนก่อน

      @@kylelee639 Thanks

  • @b43xoit
    @b43xoit ปีที่แล้ว +2

    It looks like each UPS has a fume hood. I guess that is for hydrogen from lead-acid batteries if they are being charged too fast for whatever reason.

  • @tomallen6073
    @tomallen6073 3 ปีที่แล้ว +17

    All fun and games until you have a massive arc fault and all that shit blows into pieces, but you already know that. Have a nice day.

    • @GideonMesser
      @GideonMesser 3 ปีที่แล้ว +6

      Those enclosures are rated to contain the energy of the biggest arc flash that the power supply could possibly cause, so the worst case would be maybe some hearing damage from the noise. Fun fact: part of the reason the breakers make a loud bang is because there is, momentarily, an arc when the contacts are opened. The bang is also partially due to the switch being shoved into a special cubby to cut off the arc. On even larger switches like at power stations, there are special gas jets that literally blow away the plasma that makes up the electrical arc.

    • @tomallen6073
      @tomallen6073 3 ปีที่แล้ว

      @@GideonMesser As long as it’s rated it must be perfectly safe in all respects. Indulge me in how you make such calculations with those numbers of variables. Obviously there are a lot of failures in design proven by the number of videos on TH-cam. If it all perfectly safe then there would be no TH-cam video except for one based on human error.

  • @bobo-wf1jv
    @bobo-wf1jv 4 ปีที่แล้ว

    Thanks for sharing this .. Cheers

  • @vasiovasio
    @vasiovasio 4 ปีที่แล้ว

    Great Insight Video!

  • @AuthorisingEngineer.online
    @AuthorisingEngineer.online ปีที่แล้ว

    Love it! why do you need this for such a long time?

  • @garyangel18
    @garyangel18 4 ปีที่แล้ว +1

    I like your DCIM tool

  • @mahmoudabozied2069
    @mahmoudabozied2069 4 ปีที่แล้ว

    2:00 i think it run at night by itself and return back to not get cought, smart energy working.

  • @garyangel18
    @garyangel18 4 ปีที่แล้ว +4

    I hate that clunking noise, it makes me jump like hell when i do it

  • @ToddKonicek
    @ToddKonicek 5 ปีที่แล้ว

    How many gensets do you have?? I saw 3 of course, but do I understand you have 3 more??
    I have run outdoor concerts on 10 Mw but this is very nice indeed, ty for the info

  • @dloui5214
    @dloui5214 ปีที่แล้ว +1

    everytime when the transfers switch went bang , his balls were jolting !
    but that would indicate everything were going as expected .

  • @Nitrxgen
    @Nitrxgen 5 ปีที่แล้ว

    love those castell locks

  • @divlles
    @divlles 5 ปีที่แล้ว

    Over by the ups was the vent on top for battry off gass or for heat offput

  • @Pl4sm0
    @Pl4sm0 5 ปีที่แล้ว

    Great video guys !!!
    I'm very interested what DCIM you using, thanks in advance :)

  • @dansclassics
    @dansclassics 4 ปีที่แล้ว

    Good video; you think it’s loud when it works properly; I was doing a test one time and a a switch jammed; so loud, and you could feel the thud; I jumped off the ground; I had to abort the test that time.

  • @Damicske
    @Damicske 5 ปีที่แล้ว

    Pff small gensets and breakers, on my previous work they have breakers of 3kV/150A on the small blowers they make a BANG if they switch. The gen sets are automated synced with the grid, 1 genset is 3kV/2000A. This is nice to :)

  • @joseluisflores8921
    @joseluisflores8921 5 ปีที่แล้ว

    Gracias por el video ¡¡ saludos desde Bolivia

  • @GHOSTMEDIA007
    @GHOSTMEDIA007 5 ปีที่แล้ว

    Thanks very instructive videos

  • @denocidesan1
    @denocidesan1 5 ปีที่แล้ว

    I like your videos, I am just wondering if 10v1600 series is enough to get the energy for the hole data center. They have only 700kva and for example 20v4000 series has 4000kva output. Maybe it makes sense to replace all small once to 2 bigger once :)

  • @roseironworks1393
    @roseironworks1393 5 ปีที่แล้ว +2

    Pushing the E stop on a Genset equipped with a deep sea panel is not an acceptable way of isolating an engine from starting. You should be turning off the battery isolator !