GROUND SLAB VOLUME AND CONCRETE MIX

แชร์
ฝัง
  • เผยแพร่เมื่อ 28 ธ.ค. 2024

ความคิดเห็น • 46

  • @relardztv605
    @relardztv605 ปีที่แล้ว

    Super amazing talaga Yong mga banat mo sir very impressive thank you for sharing useful video about flooring

  • @hermanopuli318
    @hermanopuli318 ปีที่แล้ว +1

    Nice topic Sir Gab, malaking bagay sa mga nagbabalak magpatayo.

  • @dannybobis8233
    @dannybobis8233 ปีที่แล้ว

    Highly appreciated Engineer…malaking tulong ito…simple at madali unawain

    • @GabsRomano
      @GabsRomano  ปีที่แล้ว

      Salamat po sa patuloy na pag suporta sa channel.

  • @muktaderedlo7415
    @muktaderedlo7415 10 หลายเดือนก่อน

    thanks god bless u

  • @raymondomuk4806
    @raymondomuk4806 2 ปีที่แล้ว

    Very informative sir madami ako natututunan sa turo nyo

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว

      Have a great day

  • @alvinparalejas1936
    @alvinparalejas1936 ปีที่แล้ว

    more video sir god bless

  • @arindar4310
    @arindar4310 ปีที่แล้ว

    boss kung cement at buhangin lng ??

  • @jhondievans26banac56
    @jhondievans26banac56 2 ปีที่แล้ว

    Ok sir god bless you. Thank you may guide na ako. Salamat talaga sir.

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว

      Have a great day

  • @KulotGutado-gh6vh
    @KulotGutado-gh6vh ปีที่แล้ว

    Boss anu po ka mix ng piballs salamat po

  • @carlitocuntapay8405
    @carlitocuntapay8405 ปีที่แล้ว

    Hello sir..ok lang po b na magsecond floor tapos puru 12mm lang ang mga poste?

  • @TheBilanggo
    @TheBilanggo 2 ปีที่แล้ว

    Salamat Sir sa mga share mong idea at kaalaman, marami kami natutunan sa mga content mo, new subscriber from NY…mabuhay ka sir

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว

      Thanks po and have a great day

  • @angiemiranda949
    @angiemiranda949 9 หลายเดือนก่อน

    San mo kinuha yon 9 bags na semento

  • @kimfercarandang8717
    @kimfercarandang8717 ปีที่แล้ว

    Engr. Pwede po kaya yung class B para Tie beam?

  • @francisbahia5003
    @francisbahia5003 ปีที่แล้ว

    Sir pwede po ba mixture sa ground flr ang mixture na 1 cemento, 4 na buhangin 3 graba? Bali mas laman po ang buhangin? Salamat po sa sagot god bless

  • @jesus_saves9583
    @jesus_saves9583 2 ปีที่แล้ว

    Mgndang araw Sir Gabs, nakapabuti nyo at nakakatulong ang mga videos nyo sa mga tao. Kung pwede lang din po sana makahingi ng recommendation nyo sa ggwin nming pundasyon ng bahay, 5x6 lote square type, 3-storey po. Baba ay garahe, Balak namin is drywall lang majority ng division, ano po ba ang recommended ng dami ng poste, ilang bakal at sukat ng bakal ng poste anilyo, sa footing, biga, at mga bakal sa buhos. Di po kasi namin afford kumuha ng engr at architect gawa ng di sasapat ang budget. Sana po matulungan nyo kami Sir Gabs. Salamat po!

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว

      6 column pero mahirap po magbigay ng details kc di na typical ang 3 storey. Need nio na mag pa staad saka possible na hanapan ka rin ng soil boring test

  • @malvindamartian9855
    @malvindamartian9855 2 ปีที่แล้ว

    Good day sir Gabs pwede po ba magpagawa sa inyo, house expansion?

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว

      You can reach me through my FB account, see my channel description po

  • @gdfb3591
    @gdfb3591 2 ปีที่แล้ว

    Engineer, gaano katagal after ng pouring bago apakan at lagyan ng tiles ang ground floor slab?

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว

      7 days nasa 200 psi ung compressice strength

  • @marino9606
    @marino9606 10 หลายเดือนก่อน

    Nice po sir kaso parang niloko na ako ng constructor ko

  • @arielgalon9585
    @arielgalon9585 ปีที่แล้ว

    San po nakuha ung 9 bags na cement? Tapos minultiply sa 8? Saan po nakuha ang 9 bags?

  • @wenzv9470
    @wenzv9470 2 ปีที่แล้ว

    boss, ilang bags of Sand ang 4 cu m. at bags of gravel ang 8 cu.m?

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว

      sand 149, gravel 298

  • @justinjaval8829
    @justinjaval8829 2 ปีที่แล้ว

    Gudpm! Sir mag inquire po sana kung ano ang best n gawin s flooring ng aming bahay. Tambakan or gamitan ng plywood/steeldeck. Ang bahay po kc nmin eh elevated ng mga 1meter s ground at wooden floor po kmi ngyn. Malimit po kming mag p repair and kalimitan may anay. Ano po ang best gawin. Ung maayos n abot kaya. Slamt po at sna matulungan.

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว

      Pinakamura na ang floor system na ang floor joist ay steel na light gages materials, please wait for my upload soon sa floor joists na c-purlins

  • @medjalyn3293
    @medjalyn3293 2 ปีที่แล้ว

    Sir itanong ko lang po kong ok po bang gamitin ang mix gravel sa pang slab? Para sana nd na po bibili ng buhangin at G1 na graba..

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว

      G1 para sa concrete na nsa soil like footing and ground slab

  • @deltv7387
    @deltv7387 2 ปีที่แล้ว

    Ask ko lang po sir.. normal lang po ba yumyanig ung slab kapag tumtakbo mga bata... isang drtso po kc ung kusina ko hnggng salas may haba po sya na 11.5 at may lapad na 4.3 ang biga nya po ay isa lang sa gitna..
    Ung helera nmn po ng mga kwrto ok nmn po.. hnd ramdm ung pagyanig kapg nagllro mga bata

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว

      Malapad po ang area, may instances na nagbavibrate talaga, usually pag nag topping at tiles na narereduce ung vibration.

  • @jaimeabas4033
    @jaimeabas4033 2 ปีที่แล้ว

    Good day Sir ask kolang po kong ilan magamit or distansya ng (poste to poste) bali 5 stall sukat 16m x 6m kaya po ba ng corner to corner lang postehan i mean is every stall is 3x5m wala napong second floor pero buhos lang salamat

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว +1

      Ok po pwede, see my other uploads

    • @jaimeabas4033
      @jaimeabas4033 2 ปีที่แล้ว

      @@GabsRomano thank you sir

    • @jaimeabas4033
      @jaimeabas4033 2 ปีที่แล้ว

      @@GabsRomano one more thing sir anong size ng bakal kaya ba ng 12 or 16 sa poste? thanks

  • @wenzv9470
    @wenzv9470 2 ปีที่แล้ว

    boss, in ur computations for Class A 1:2:4: @ 8 cu.m Volume; cement = 72 bags; kung per bag natin ang sand =72 x 2 = 144 bags & gravel 72 x 4 = 288 bags.. paano naging 149 sand at 298 gravel?

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว

      Ung inquiry po nio 4 and 8 cu m kaya ginamit q conversation factor is rounded off ng metric system na based on density of cement.

  • @MobileLegends-vu7hc
    @MobileLegends-vu7hc 2 ปีที่แล้ว

    Sir bat yung iba pag sinabing 1:2:3 mix isang bag ng cement... 2 bags ng sand.. 3 bags ng gravel? Same ba yun quantity ng total estimate ng materials pag kinonvert mo sa cubic meter?

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว

      Pag maghahalo ka na kailangan parepareho panukat tulad ng isang sako , tas ung cubic meter may table of concrete proportion un na makikita mo multiplying factor para sa volume.

  • @leoniladadoy4159
    @leoniladadoy4159 2 ปีที่แล้ว

    Hi po...askko lng po kng mgkano magastos ko sa extension for 7x4m bale may proposal po for 2nd floor
    Wait ko po reply nyo salamat po😊

    • @GabsRomano
      @GabsRomano  2 ปีที่แล้ว

      You can check my FB account at my channel description

  • @reynaldoneo523
    @reynaldoneo523 2 ปีที่แล้ว

    sir tanong q lng anong size ng bakal gagamitin sa floor slab area 60 sqm.