@Michael Nagorski excellent work guys. I am installing a tilting winch mast that is made from 60x60x5mm box section steel. i have a ground sleevw piece of box that it slides into measuring 70x70x5mm. the main part with winch is around 5 FT off the ground and will be holding two 20FT aluminium scaffold poles with adsb / ais equipment. i have dug a hole 2 and 1/2ft x 2 and 1/2fT x 3ft deep, should i use rebar for the ground sleeve and should i go deeper? i really need some advice
@Michael Nagorski excellent work guys.
I am installing a tilting winch mast that is made from 60x60x5mm box section steel. i have a ground sleevw piece of box that it slides into measuring 70x70x5mm.
the main part with winch is around 5 FT off the ground and will be holding two 20FT aluminium scaffold poles with adsb / ais equipment.
i have dug a hole 2 and 1/2ft x 2 and 1/2fT x 3ft deep, should i use rebar for the ground sleeve and should i go deeper?
i really need some advice