Design of transmission line tower foundation Type 1 Pad & chimney BIS PART - 2

แชร์
ฝัง
  • เผยแพร่เมื่อ 15 ต.ค. 2024
  • Design of transmission line tower foundation Type 1 Pad & chimney BIS PART - 2 - Explains Bearing pressure check of foundation.
    Reference videos:
    PART - 1 Explains: 1. Tower geometry, 2. Design foundation loads, 3. Soil Parameters, 4. Foundation Geometry & 5. Analysis - Uplift Resistance check: • Design of transmission...
    | DESIGN OF STUB & CLEAT FOR TRANSMISSION TOWER (ASCE): • DESIGN OF STUB & CLEAT...
    Related video:
    | Foundation for Transmission towers: • Foundation for Transmi...
    | Transmission tower structure philosophies, Modelling, Load calculation and Design: • Transmission line towers
    | Load calculations (Wind and Seismic): • Load Calculations
    | Substation Civil and Structures: • Substation Civil and S...

ความคิดเห็น • 4

  • @bobrobert8684
    @bobrobert8684 11 หลายเดือนก่อน +1

    You have done it again. Excellent presentation. Thank you very much Sir

    • @annaiteresaec
      @annaiteresaec  11 หลายเดือนก่อน

      You are most welcome. Thanks again for watching videos.

  • @thorvuthy7085
    @thorvuthy7085 11 หลายเดือนก่อน +1

    thanks sir I hope that you will update part 3 soon

    • @annaiteresaec
      @annaiteresaec  11 หลายเดือนก่อน

      Thank you for watching. Yes uploaded. th-cam.com/video/jQUDp00790M/w-d-xo.htmlsi=0zJH8f457HsJGxxm