Design of Substation Gantry foundation | Eurocode | Stage 5 of 7
Design of Substation Gantry foundation | Eurocode | Stage 5 of 7 Explains Design of Bottom Slab as per Eurocode.
Stage 1 of 7 for overview of Gantry foundation calculation as per Eurocode: th-cam.com/video/XRrIqtwWI78/w-d-xo.html
Stage 2 of 7 for foundation and soil parameters, Loads and Load combinations for Gantry foundation calculation as per Eurocode: th-cam.com/video/brEBOnaurD0/w-d-xo.html
Stage 3 of 7 Explains Stability check for foundation as per Eurocode: th-cam.com/video/BO5fhps6d_Y/w-d-xo.html
Stage 4 of 7 Explains Anchor bolt design as per Eurocode: th-cam.com/video/4qfVmk8cK0s/w-d-xo.html
For following related videos
1. Structure Modelling in Robot and STAAD
2. Load calculations as per EN 50341-1
3. Design of Gantry Structure,
Refer videos in Playlist: th-cam.com/play/PLorbvg8Gw7Dg_umdZo-59IG2KpJk6je0n.html&si=wC0-72baY9D5SqIM
Stage 1 of 7 for overview of Gantry foundation calculation as per Eurocode: th-cam.com/video/XRrIqtwWI78/w-d-xo.html
Stage 2 of 7 for foundation and soil parameters, Loads and Load combinations for Gantry foundation calculation as per Eurocode: th-cam.com/video/brEBOnaurD0/w-d-xo.html
Stage 3 of 7 Explains Stability check for foundation as per Eurocode: th-cam.com/video/BO5fhps6d_Y/w-d-xo.html
Stage 4 of 7 Explains Anchor bolt design as per Eurocode: th-cam.com/video/4qfVmk8cK0s/w-d-xo.html
For following related videos
1. Structure Modelling in Robot and STAAD
2. Load calculations as per EN 50341-1
3. Design of Gantry Structure,
Refer videos in Playlist: th-cam.com/play/PLorbvg8Gw7Dg_umdZo-59IG2KpJk6je0n.html&si=wC0-72baY9D5SqIM
มุมมอง: 99
วีดีโอ
Design of Substation Gantry foundation Eurocode Stage 4 of 7
มุมมอง 11921 วันที่ผ่านมา
Design of Substation Gantry foundation | Eurocode | Stage 4 of 7 Explains Anchor bolt design as per Eurocode. Stage 1 of 7 for overview of Gantry foundation calculation as per Eurocode: th-cam.com/video/XRrIqtwWI78/w-d-xo.html Stage 2 of 7 foundation and soil parameters, Loads and Load combinations for Gantry foundation calculation as per Eurocode. th-cam.com/video/brEBOnaurD0/w-d-xo.html Stage...
Design of Substation Gantry foundation | Eurocode | Stage 3 of 7
มุมมอง 157หลายเดือนก่อน
Design of Substation Gantry foundation | Eurocode | Stage 3 of 7 Explains Stability check for foundation as per Eurocode. Stage 1 of 7 for overview of Gantry foundation calculation as per Eurocode: th-cam.com/video/XRrIqtwWI78/w-d-xo.html Stage 2 of 7 foundation and soil parameters, Loads and Load combinations for Gantry foundation calculation as per Eurocode. th-cam.com/video/brEBOnaurD0/w-d-x...
Design of Substation Gantry foundation | Eurocode | Stage 2 of 7
มุมมอง 169หลายเดือนก่อน
Design of Substation Gantry foundation | Eurocode | Stage 2 of 7 Explains foundation and soil parameters, Loads and Load combinations for Gantry foundation calculation as per Eurocode. Stage 1 of 7 for overview of Gantry foundation calculation as per Eurocode: th-cam.com/video/XRrIqtwWI78/w-d-xo.html Stage 3 of 7 Explains Stability check for foundation as per Eurocode: th-cam.com/video/BO5fhps6...
Design of Substation Gantry foundation | Eurocode | Stage 1 of 7
มุมมอง 3142 หลายเดือนก่อน
Design of Substation Gantry foundation | Eurocode | Stage 1 of 7 Provide a overview of Gantry foundation calculation as per Eurocode. Stage 2 of 7 foundation and soil parameters, Loads and Load combinations for Gantry foundation calculation as per Eurocode. th-cam.com/video/brEBOnaurD0/w-d-xo.html Stage 3 of 7 Explains Stability check for foundation as per Eurocode: th-cam.com/video/BO5fhps6d_Y...
Design of Bitumen top road section | IRC 37: 1984
มุมมอง 663 หลายเดือนก่อน
Design of Bitumen top road section | IRC 37: 1984 Explains: Road thick and filling material for traffic loading and CBR % Substation Civil and Structures playlist: th-cam.com/play/PLorbvg8Gw7Dg_umdZo-59IG2KpJk6je0n.html&si=ag70ASzzQmYEireh
TRANSMISSION TOWER FOUNDATION Type 3. Concrete Auger / Caisson - Design procedure
มุมมอง 2333 หลายเดือนก่อน
Explains: Input, Analysis, Design of elements of Concrete Auger and Caisson foundation for Transmission line tower. Other related videos: Foundation Types for Transmission Tower: th-cam.com/video/GR7YN0v-YWQ/w-d-xo.htmlsi=nv8gUPM-D2T9IFv8 TRANSMISSION TOWER FOUNDATION Type 1. Pad & Chimney - Design procedure: th-cam.com/video/5j9WQRWWQAI/w-d-xo.htmlsi=O2DkUryim-tNp9bs TRANSMISSION TOWER FOUNDAT...
TRANSMISSION TOWER FOUNDATION Type 2. Raft foundation - Design procedure
มุมมอง 4474 หลายเดือนก่อน
TRANSMISSION TOWER FOUNDATION Type 2. Raft foundation - Design procedure Explains: Input, Analysis and Design of Elements. Playlist for Transmission tower foundation: th-cam.com/play/PLorbvg8Gw7Di3VT8pTCsBL4WZUsPBvKlG.html&si=eCI8uMZhnsce8Eq6 Playlist for Transmission Tower Structure: th-cam.com/play/PLorbvg8Gw7Dha2n_0RwHEOKrMfjwTrgLi.html&si=tlCh8udGstSoX1RE Playlist for Substation Civil & Str...
Design of Base plate and Anchor bolt | Robot Structural Analysis | Eurocode
มุมมอง 3955 หลายเดือนก่อน
This video is a demo for Design of Base plate and Anchor bolt of a equipment support with Robot Structural Analysis in European standard - Eurocode
Design of Lifting Hook | Robot Structure Analysis | Euro Standard | Part 2 | Connection Design
มุมมอง 836 หลายเดือนก่อน
Explaining how to do bolt capacity in Tension, Shear and Bearing in European Standard with Robot Structural Analysis output. Design of Lifting Hook | Robot Structure Analysis | Euro Standard | Part 1: th-cam.com/video/Vx-qtj-x8Rc/w-d-xo.html Other Videos on Robot Structural Analysis: th-cam.com/play/PLorbvg8Gw7DgOt-N0VCeiT0pVq4bksx1f.html&si=q JeUkXAh7jN5b1
Design of Lifting Hook | Robot Structure Analysis | Euro Standard | Part 1
มุมมอง 1436 หลายเดือนก่อน
Explaining how to do modelling of plates, load application and Analysis of Lifting hook plates in European Standard with Robot Structural Analysis. Other Videos on Robot Structural Analysis: th-cam.com/play/PLorbvg8Gw7DgOt-N0VCeiT0pVq4bksx1f.html&si=q JeUkXAh7jN5b1
Design of transmission line tower foundation Type 1 Pad & chimney BIS PART - 6
มุมมอง 3877 หลายเดือนก่อน
Design of transmission line tower foundation Type 1. Pad & chimney (BIS) PART 6 - Explains: Design of Base slab (One way, Two way shear and Bond stress check). Related Video: | PART - 1 Explains: 1. Tower geometry, 2. Design foundation loads, 3. Soil Parameters, 4. Foundation Geometry & 5. Analysis - Uplift Resistance check: th-cam.com/video/q8kFYPCG8zo/w-d-xo.htmlsi=2Z66T_Y_vQEJV0IT | PART - 2...
Design of transmission line tower foundation Type 1 Pad & chimney BIS PART - 5
มุมมอง 4627 หลายเดือนก่อน
Design of transmission line tower foundation Type 1 Pad & chimney BIS PART - 5
Design of transmission line tower foundation Type 1 Pad & chimney BIS PART - 4
มุมมอง 5818 หลายเดือนก่อน
Design of transmission line tower foundation Type 1 Pad & chimney BIS PART - 4
Design of transmission line tower foundation Type 1 Pad & chimney BIS PART - 3
มุมมอง 5718 หลายเดือนก่อน
Design of transmission line tower foundation Type 1 Pad & chimney BIS PART - 3
Design of transmission line tower foundation Type 1 Pad & chimney BIS PART - 2
มุมมอง 6949 หลายเดือนก่อน
Design of transmission line tower foundation Type 1 Pad & chimney BIS PART - 2
Design of transmission line tower foundation Type 1 Pad & chimney BIS PART - 1
มุมมอง 1.2K9 หลายเดือนก่อน
Design of transmission line tower foundation Type 1 Pad & chimney BIS PART - 1
Design of Equipment Structure using Eurocode | PART 2
มุมมอง 3139 หลายเดือนก่อน
Design of Equipment Structure using Eurocode | PART 2
Design of Equipment Structure using Eurocode | PART 1
มุมมอง 47810 หลายเดือนก่อน
Design of Equipment Structure using Eurocode | PART 1
CONCEPT OF SUBSTATION EQUIPMENT STRUCTURE DESIGN
มุมมอง 50110 หลายเดือนก่อน
CONCEPT OF SUBSTATION EQUIPMENT STRUCTURE DESIGN
DESIGN OF STUB & CLEAT FOR TRANSMISSION TOWER (ASCE)
มุมมอง 1.6K11 หลายเดือนก่อน
DESIGN OF STUB & CLEAT FOR TRANSMISSION TOWER (ASCE)
TRANSMISSION TOWER FOUNDATION | Structure input
มุมมอง 2.6K11 หลายเดือนก่อน
TRANSMISSION TOWER FOUNDATION | Structure input
TRANSMISSION TOWER FOUNDATION Type 1. Pad & Chimney - Design procedure
มุมมอง 7Kปีที่แล้ว
TRANSMISSION TOWER FOUNDATION Type 1. Pad & Chimney - Design procedure
Design of 220kV DC Transmission Tower | Robot Structure Analysis | BIS Standard | STAGE 3 of 3
มุมมอง 391ปีที่แล้ว
Design of 220kV DC Transmission Tower | Robot Structure Analysis | BIS Standard | STAGE 3 of 3
Design of 220kV DC Transmission Tower | Robot Structure Analysis | BIS Standard | STAGE 2 of 3
มุมมอง 548ปีที่แล้ว
Design of 220kV DC Transmission Tower | Robot Structure Analysis | BIS Standard | STAGE 2 of 3
Design of 220kV DC Transmission Tower | Robot Structure Analysis | BIS Standard | STAGE 1 of 3
มุมมอง 538ปีที่แล้ว
Design of 220kV DC Transmission Tower | Robot Structure Analysis | BIS Standard | STAGE 1 of 3
220kV DC Transmission Towers | Structure Loadings | IS 802 | STAGE 7 of 7 - Load trees
มุมมอง 492ปีที่แล้ว
220kV DC Transmission Towers | Structure Loadings | IS 802 | STAGE 7 of 7 - Load trees
220kV DC Transmission Towers | Structure Loadings | IS 802 | STAGE 6 of 7
มุมมอง 449ปีที่แล้ว
220kV DC Transmission Towers | Structure Loadings | IS 802 | STAGE 6 of 7
220kV DC Transmission Towers | Structure Loadings | IS 802 | STAGE 5 of 7 Explains Reliability loads
มุมมอง 335ปีที่แล้ว
220kV DC Transmission Towers | Structure Loadings | IS 802 | STAGE 5 of 7 Explains Reliability loads
Seismic load has not been considered.
Seismic impacts are not vulnerable in most Europe 🇪🇺 countries compared to the wind and condutor tensions at minimum temperatures. Also, seismic can be ignored for steel gantry structures due to its ductile properties.
kindly make videos on the design of transformer foundation,GIB Foundation, Gis Building, Switch Gear Building, Capacitor Foundation etc
Thanks for the suggestions. We will do in future.
My request is if changes in design parameters with respect to 2012 revision of EN 50341_1 can be explained too.
Thanks for watching. We are focusing on other different stuffs to cover more comprehensive engineering tasks. Case to case explaining videos are not working good. These videos are only educational purpose. Thanks for understanding.
Really a great work done here. Explained everything clearly and made to understand.
Glad to hear that!
More wisdom, More knowledge and strength to you
Thanks for your wishes 🙏
Another classic delivery. Thank you Sir.
Thanks for watching and for your inspirational wishes.
which checks we will apply the true length factor and the tan theta? or where we will use them?
Yes, these inputs are required to check column/chimney design. Also needed for tower structure development and detailing.
thank you sir for your commitment to sharing knowledge. We appreciate your commitment if its possible please share the spreadsheet/excel sheet. spreadsheet act like a tool for your video, without spreadsheet/tool nothing is possible. please do it and share.
Thanks for watching 🙂. Some Excel spreadsheets are prepared for organisation use. Sharing is restricted. Thanks for understanding.
Hello sir, the link is blocking access.
Hope you got it.
Quite informative!
Thanks for your valuable feedback
well explained sir.. pls provide me excel sheet also
Thanks. Please look look link in description to download excel file from GDrive
Sir please apply loading combination also here and analyse the structure
Thanks for the suggestions. We are working on other topics now. We will do in future. Actual plan is to do these load and further design using American code.
Sir Can we apply loading combination of transmission tower in staad pro software and analyse it ?
Thanks for watching. Yes, you can do appropriate load combinations in STAADPRO for transmission towers.
hello sir ,in gust factor ce , the ht mean from ground level to roof top ht ? or just ground level to last floor level ? 10ft 4 storey plus roof ht 4ft .44ft or just 40ft ?
Thanks for watching. Height to be considered as ground to roof top of the building above ground. 44ft
@@annaiteresaec Thank you for the reply. in etabs ground level means upto plinth level. plinth level ht is not included, is it correct? just 44ft above plinth level.
Thanks again Sir.
Always welcome
Very Nice.
Many many thanks
Hi, can you please share this for study.
Excel sheets are not free sharable due to professional reason.
This is excellent content. Thank you very much
Thanks for watching and for your feedback
Another unparalleled video. Thank you Sir for sharing your knowledge with the world.
Thanks for watching and for your feedback
Hello! Sir i really appreciate your work and how can i get ur exel pls🙏
Thanks for watching. The excel sheet is not shareable as restricted for professional use.
Thank you for the knowledge i've been seeing many videos and this is the by far the best explained video
Glad to see your feedback. It is helpful! Thanks for watching and for your inspirational feedback
That's informative, thanks!
Thanks for watching and for your feedback
This is very good Sir, may I request for access to this spreadsheet as well as ASCE 7, thank you.
Thanks for watching. Yes the same can be available for sharing. Refer to description for gdrive link to download excel.
when was the next video uploaded sir
Thanks for watching and for your interest on this series. Due to some plan change this is getting delayed. We are working... Will be posting the series from June 1st week.
It is very informative videos. I am structural engineer and I have a knowledge of substation. But I am beginner for transmission line. Thanks you very much. One more thing can you share that excel sheet of loading calculation?
Thanks for watching and for your inspirational wishes. Kind info, the Excel sheets are professionally restricted for sharing.
@@annaiteresaec understand sir, thanks for reply. can you make some video on geometry fixing of all type of tower as well as length finalization of conductor holding arms?
Thanks for understanding. Yes, already we are having on video explaining that: th-cam.com/play/PLorbvg8Gw7Dha2n_0RwHEOKrMfjwTrgLi.html&si=dfPiEnPmYUtnn5M_
@@annaiteresaec There is displacement of cable due to wind across the cable. due to this we need earthing distance between tower legs and cable. based on arm length will be finalized. that I am try to say.
Excellent informative video.learnt a lot.kindly provide me access of excel
Thanks for watching and for your feedback. Access provided.
Hello, many thanks for your insight. Would like to discuss the potential coorperation opportunities, can you please share your contact?
Tower transmission company
Thanks for watching
Sir can u please share the excel sheet with me thanks
Thanks for watching. This Excel documents is not shareable as per professional restrictions.
I need ppt of same
Thanks for watching. Ppt documents are not shareable as per restrictions.
Sir, Kindly share Eurocode load combination(explained above) pdf document, which really helpful for me..
Please find here and download from G drive: drive.google.com/file/d/1xK4Fvb-usf6WolhQb8aZlKv_Kf5LMbgv/view?usp=sharing
You don't disappoint. Another great tutorial.Thank you Sir.
Thanks for watching and for your inspirational wishes
Thanks Sir..
Thanks for watching
Civil work ka estimation kese kre please guide me
Don't know what you mean. Which language is this?
Thanks for the effort and time. Could you please share the Excel sheet & UBC 1997 code?
Yes sure. Please check to the description to find link to download Excel from Gdrive.
Hi. Good explanation and I most love your picture. I am from mother Teresas country Albania
Thanks for watching and valuable wishes for Home country of blessed Anjezë. Happy to get wishes from Albania.
Well explained. Thanks for the video and excel sheet.
Thanks for watching and for your wishes
Would you sell this Stub spreadsheet? Your spreadsheet is super interesting and I would like to acquire it if possible, as I am terrible at programming in excel.
Thanks for watching and your feedback. Yes we do sell excel calculation. Can you please send your request to this mail Id: annaiteresaec@gmail.com. We want to know your mail id for further communication.
thank you for your kindness ,the god will bless you dear
Thank you too
Sir.. Kindly help me regarding foundation of transmission line upto 765 kv transmission line
Please let me know what help you need. Send the details to mail id: annaiteresaec@gmail.com
can I have the excel file for this? thank you!
Yes sure. You can click Gdrive link in description for access to download excel.
thanks for your dedication and hard work.
Thanks to you for your valuable feedback.
You are simply a blessing to those of us who design transmission line towers. Thank you 🙏.
You are very welcome.
hi sir, i am quite fresh in designing structural.. currently, im required to design foundation (using micropile) of transmission tower (lattice). i am only designing the reinforcement details & sizing of the pilecap and stump. currently, i have information of soil parameters (from borelog). i am wondering what are the loadings/information that I am supposed to request from the tower supplier. I requested the shear force and moment in Long/Trans direction + the Vertical Load, will these be sufficient for my foundation design? are information regarding cleat/stub necessary?
Hi Benjamin, thanks for watching. Additional to the foundation loads you need to ask for tower geometry. Please refer our video 📹 for more explanation: th-cam.com/video/aajc_aOgey4/w-d-xo.htmlsi=J2e9SNufcxmCf1TV
Very Nice can you share your number sir.
Thanks a lot, good man
You're welcome!. Thanks for watching 👀 🙂
Sheet not open
Hi just given access. Can you please try now.
please provide access to download
Please do download request by clicking gdrice link in description
Nicely explained thank you Sir, kindly make video on wind load on open structure with piping and equipment's accordingly Eurocode. it will be very helpful if you accepted my request.
Thanks for watching and for your suggestion. For equipment support for Substation projects you can refer th-cam.com/video/0PuEjCbB6LU/w-d-xo.htmlsi=uOn9gfiWv6Y4uVIp. For wind simulation examples with Robot Structural Analysis software: th-cam.com/video/-lJI35BE9Sc/w-d-xo.htmlsi=Cll9ISiYLairM1EK. Will do more in future.
What is BT 1 type column
Thanks for watching. This type may be based on foundation layout marking. May be this foundation is for Transfer Bus structure. Not sure.