Method Statement For Plumber Work

แชร์
ฝัง
  • เผยแพร่เมื่อ 1 ก.ค. 2024
  • METHOD STATEMENT FOR PLUMBING WORKS
    CONTENTS
    INTRODUCTION
    PURPOSE
    SCOPE
    REFERENCES
    DEFINITIONS
    ORGANIZATION CHART
    DUTIES AND RESPONSIBILITIES
    METHOD STATEMENT FOR EQUIPMENT INSTALLATION
    METHOD STATEMENT FOR PLUMBING INSTALLATION
    METHOD STATEMENT FOR PLUMBING SYSTEM TEST
    QUALITY CONTROL
    SAFETY PLAN
    INTRODUCTION
    This method statement details the method of performing the various activities involved in the course of works for field installation works of Plumbing system for Building Package-01 Project. These method statements are applicable only for thePlumbing system Installation of various building in this project.
    PURPOSE
    This method statement gives guidelines contained herein so as to ensure that the job execution complies with the requirement of the specification and the authorities concerned and serves the intended purpose to satisfactory level.
    SCOPE
    This method statement covers the nature and type of work forPlumbing works includes the installation of potable water line, drain lines and vents for all rooms including HVAC room, toilets, shower room, etc for all building and frequency at which inspections are to be carried out

ความคิดเห็น • 3