Method Statement For Plumber Work
ฝัง
- เผยแพร่เมื่อ 1 ก.ค. 2024
- METHOD STATEMENT FOR PLUMBING WORKS
CONTENTS
INTRODUCTION
PURPOSE
SCOPE
REFERENCES
DEFINITIONS
ORGANIZATION CHART
DUTIES AND RESPONSIBILITIES
METHOD STATEMENT FOR EQUIPMENT INSTALLATION
METHOD STATEMENT FOR PLUMBING INSTALLATION
METHOD STATEMENT FOR PLUMBING SYSTEM TEST
QUALITY CONTROL
SAFETY PLAN
INTRODUCTION
This method statement details the method of performing the various activities involved in the course of works for field installation works of Plumbing system for Building Package-01 Project. These method statements are applicable only for thePlumbing system Installation of various building in this project.
PURPOSE
This method statement gives guidelines contained herein so as to ensure that the job execution complies with the requirement of the specification and the authorities concerned and serves the intended purpose to satisfactory level.
SCOPE
This method statement covers the nature and type of work forPlumbing works includes the installation of potable water line, drain lines and vents for all rooms including HVAC room, toilets, shower room, etc for all building and frequency at which inspections are to be carried out
Good keep it up
Keep it up ❤
❤❤❤❤