The rope between the two dozers is good for pulling 140,000 lbs, the shorter rope between the 9370 amd the first dozer is good for 200,000 lbs. the cable under the quad is a standard steel braided cable, not sure on specs but its the same cable the put on all the quads use for scraping.
That's some big tile. What tow ropes do you have in front of the cable? What size cable? Thanks for sharing the video.
The rope between the two dozers is good for pulling 140,000 lbs, the shorter rope between the 9370 amd the first dozer is good for 200,000 lbs. the cable under the quad is a standard steel braided cable, not sure on specs but its the same cable the put on all the quads use for scraping.
Thanks. I'm still throwing 3/8 chains under our Steiger, haven't broken them yet...