Hi Sathiya, here are the answers to quiz questions: 1. What is MRP group? • Used to group material from MRP point of view, can be used to run MRP based on this. Usually this is numeric value. 2. ABC group has to be manually updated. • This is also one type of classification of component based on significance of material - this can be manually or done through transaction. 3. While selecting MRP type reorder planning like VB and V1 which field Is mandatory? • Reorder point is required if MRP selected is VB or V1. 4. Planning time fence? • This is a range used to restrict procurement proposal through MRP. 5. Role of MRP controller? • Team/person responsible of overall activity of production. 6. Parameter maintained in lot size data section. • Safety stock, max-min lot size, scrap% etc. 7. Assembly scrap %? • Additional % maintained to match required qty if component keeps on failing due to machine or operator or quality issues. ‘ 8. Purpose of rounding value? • Used to round off to next value, mostly in proportion of 5,10,100 - as many vendors will have issue with suppling odd numbers of components.
7. What you answered is a component scrap. The assembly scrap is the head product %. For example, we plan to produce 100 numbers, but there will be 1 number for the destruction test, then we should put 1% assembly scrap so the system will plan for 101 materials to get the actual output of 100.
Hi Sathiya, here are the answers to quiz questions:
1. What is MRP group?
• Used to group material from MRP point of view, can be used to run MRP based on this. Usually this is numeric value.
2. ABC group has to be manually updated.
• This is also one type of classification of component based on significance of material - this can be manually or done through transaction.
3. While selecting MRP type reorder planning like VB and V1 which field Is mandatory?
• Reorder point is required if MRP selected is VB or V1.
4. Planning time fence?
• This is a range used to restrict procurement proposal through MRP.
5. Role of MRP controller?
• Team/person responsible of overall activity of production.
6. Parameter maintained in lot size data section.
• Safety stock, max-min lot size, scrap% etc.
7. Assembly scrap %?
• Additional % maintained to match required qty if component keeps on failing due to machine or operator or quality issues. ‘
8. Purpose of rounding value?
• Used to round off to next value, mostly in proportion of 5,10,100 - as many vendors will have issue with suppling odd numbers of components.