Our Square D™ Load Centers install up to 37% faster

แชร์
ฝัง
  • เผยแพร่เมื่อ 9 พ.ค. 2018
  • When you use Square D™ QO™ and Homeline™ Load Centers with Qwik-Grip™ and Dual Function Plug-on Neutral Circuit Breakers, you’ll complete installations up to 37% faster. But don’t just take our word for it. We’ve got the numbers to prove it.
    Take a load off and clock out sooner with Square D Load Centers. Now that’s Simply Smarter. See more at www.schneider-electric.us/Simp...
  • วิทยาศาสตร์และเทคโนโลยี

ความคิดเห็น • 21

  • @IIIBETEPIII
    @IIIBETEPIII 2 ปีที่แล้ว

    Looks nice, but what if i decided to cancel some cable, or upgrade some? i should remove 50 cables to find the correct one?

  • @MiguelSilva-ts2ns
    @MiguelSilva-ts2ns 3 ปีที่แล้ว

    What belts does he have?

  • @brotheradam
    @brotheradam 3 ปีที่แล้ว +1

    you need a supplier in Jamaica for your gear. Want Homeline but local breakers are all GE style from the looks of things or a new Mexican Company

  • @helmanfrow
    @helmanfrow 2 ปีที่แล้ว +1

    2:48 Hired; Hired; Hired; Fired; Fired.

  • @--JohnDoe
    @--JohnDoe 4 ปีที่แล้ว +1

    Very nice

  • @samsquires2877
    @samsquires2877 5 ปีที่แล้ว +5

    You guys make a great product so much better then eaton garbage.

    • @rfbalagam7950
      @rfbalagam7950 4 ปีที่แล้ว

      I know right

    • @rfbalagam7950
      @rfbalagam7950 4 ปีที่แล้ว

      Btw i collect two sqaure D i collect 200 amp and 100 amp

    • @electricalron
      @electricalron 4 ปีที่แล้ว

      *than

  • @user-yu4vq2cc1l
    @user-yu4vq2cc1l 6 ปีที่แล้ว

    Странно что не один кабель не промаркерован.

  • @heroknaderi
    @heroknaderi 3 ปีที่แล้ว +1

    Very convenient

  • @electricalron
    @electricalron ปีที่แล้ว

    Notice how they don't show the panel covers being installed? Want to know why? Because the screw alignment holes don't line up with the panel cover holes. EVER!!!!

    • @Californians_go_home
      @Californians_go_home 7 หลายเดือนก่อน

      lol. I watched your video. I’m trying to decide on a load center brand. I’m leaning towards Siemens over Homeline. I’m pretty sure QO panels are not necessary for my application. Always appreciate opinions. Love your videos.

  • @ceetwarrior
    @ceetwarrior 6 ปีที่แล้ว +5

    14 year electrician here. Used this quick grip for the first time today. WHAT A PIECE OF SHIT DESIGN! Slipped off while pressing the wires into the quick grip and stabbed both of my thumbs and was bleeding all over. These tabs do not seem sharp but I can tell you they are. I hope to never use this POS design again! Ill continue to use my RC50/75's, thank you.

    • @michealmclean7877
      @michealmclean7877 3 ปีที่แล้ว

      You sound like a guy who will pick up a mouse trap to smell the cheese.

    • @ceetwarrior
      @ceetwarrior 3 ปีที่แล้ว

      @@michealmclean7877 yummm the smell of trolls

    • @machone1757
      @machone1757 2 ปีที่แล้ว

      AMEN Brother, The Cable Clamps are Terrible the Plug on Neutral saves the time

  • @davefinlay1725
    @davefinlay1725 4 ปีที่แล้ว +1

    code does not allow branch circuits to enter the main breaker compartment