  • SCADA Systems for Photovoltaic Power Plants
    In this tutorial we will cover the basic understanding of SCADA System and how it is being set up for a Solar (Photovoltaic) Power Plant.
    Thanks for Watching!!!
    Please don’t forget to put your comments and suggestions below
    #SCADASupportPH
    #SCADA_Support_PH
    #SCADA
    #Solar
    #Solar_Energy
    #Systems
    #SCADA_System
    #Photovoltaic
    #PowerPlant
    #PV
    #PV_SYSTEMS
    #Contol_Systems
    #Data
    #Data_Acquisition
    #Engineering
    #Commissioning
    #Renewable_Energy
    #Renewable

ความคิดเห็น • 29

  • @RemjiusMiyaiodongo
    @RemjiusMiyaiodongo ปีที่แล้ว +3

    I like the speed at which you are explaining your videos ..

  • @qingsenmeng8323
    @qingsenmeng8323 3 หลายเดือนก่อน +1

    Nice and thank you for share

    • @SCADASupportPh
      @SCADASupportPh  3 หลายเดือนก่อน +1

      @qinsenmeng8323 thanks! glad you appreciate it!

  • @blue-peridot1087
    @blue-peridot1087 ปีที่แล้ว +3

    Very helpful

  • @lovetacoma8604
    @lovetacoma8604 2 ปีที่แล้ว +1

    thank you.

  • @javadtaghavi
    @javadtaghavi 6 หลายเดือนก่อน

    sehr hilfreich

    • @SCADASupportPh
      @SCADASupportPh  6 หลายเดือนก่อน

      Vielen Dank @javadtaghavi!
      I hope google translate got it right, as I want to say "Thank you very much" :-)

  • @saeedahmed4651
    @saeedahmed4651 ปีที่แล้ว +3

    For a typical 300 MW solar power plant, with substation 33kV/220kV what will be the cost for the scada system including engineering, hardware, commissioning, and software.

    • @SCADASupportPh
      @SCADASupportPh  ปีที่แล้ว +2

      @SaeedAhmed the overall cost of the SCADA system varies due to a lot of factors:
      Engineering and Commissioning - this will be more dependent on your preferred contractor as you'll be paying for Manpower and skillset.
      Hardware - dependent on the type of HW to be used ; types of cables and or connections (fiber, ethernet, wireless etc), Meters, Data Loggers, Virtual Machines, PPC (power plant controllers). the price would also double if you'd consider setting up a redundant network.
      Software - for those passive devices (Smart Meters, RTACs, etc) there is already an OEM software bundled with the hardware. However, for your main SCADA Application, this is separate and will be defined by the number of tags you need. Historization is also a separate package as well as Alarming and /or Events Generation.
      All of the above would also vary depending on your geographical location as some equipment and manpower cost may differ from one another.

    • @saeedahmed4651
      @saeedahmed4651 ปีที่แล้ว

      @@SCADASupportPh thanks dear for your detail response. Just a rough estimation in dollars, how much it will be. Can you please share the price range. Location will be middle East.

  • @saeedahmed4651
    @saeedahmed4651 ปีที่แล้ว +1

    Can you please explain GC.

    • @SCADASupportPh
      @SCADASupportPh  ปีที่แล้ว +1

      @SaeedAhmed SCADA Grid Controller is an absolute requirement for Plants from

    • @saeedahmed4651
      @saeedahmed4651 ปีที่แล้ว +1

      @@SCADASupportPh nice explanation. Is there any documents that you can share gives little bit more insight about Grid controller hardwares, or communication diagram.

    • @SCADASupportPh
      @SCADASupportPh  ปีที่แล้ว

      @@saeedahmed4651 RTACs are the most common, those SEL 3530 & SEL 3530-4(selinc.com/products/3530/) that are in-between the SCADA and the substation relays.
      For large power plants wherein a capacitor bank is required- for the V ratio changes on the high and low side, you should have a load tap changer (LTC). (www.reinhausen.com/productdetail/on-load-tap-changers/tapmotion-ed)
      Transformer monitoring is a must too (smsystems.co.in/qualitrol-SERVERON-TM8-on-line-DGA-monitor.html)
      On the subject of documentation, most of the documents I've used are more proprietary, so I would refer you to online / public documentation for those related hardware, or make sure to have a generalized video presentation.

  • @andreipacala5480
    @andreipacala5480 ปีที่แล้ว +1

    where is placed panel photovoltaic?

    • @SCADASupportPh
      @SCADASupportPh  ปีที่แล้ว

      @andreipacala the PV are mounted in the ARRAY. Further explanation can be found on this separate video: th-cam.com/video/K12l9J3pLIU/w-d-xo.html

  • @lejlamony
    @lejlamony 2 หลายเดือนก่อน +1

    Hi. I need scada for on grid sola plant 155kw where to buy it.

    • @SCADASupportPh
      @SCADASupportPh  2 หลายเดือนก่อน +1

      @lejlamony, thank you for your inquiry. Would you be able to share where the plant would be located? This will give us a good baseline and help scout local suppliers for you to evaluate.

    • @lejlamony
      @lejlamony 2 หลายเดือนก่อน +1

      Hi. Location is in Bosnia. Regards

    • @SCADASupportPh
      @SCADASupportPh  2 หลายเดือนก่อน +1

      @lejlamony since the location is within Southeastern Europe, I would recommend to check out these solutions:
      www.inaccess.com/scada/
      n3uron.com/
      Hope this helps

  • @ALI_KERSHEDA
    @ALI_KERSHEDA ปีที่แล้ว +1

    can i have this pdf

    • @SCADASupportPh
      @SCADASupportPh  ปีที่แล้ว

      Thank you for the inquiry @alikersheda, unfortunately, my backup copies were purged from my hard drive, so this video is the only copy available.

  • @son_zrek
    @son_zrek ปีที่แล้ว +2

    can i have this pdf? pls

    • @SCADASupportPh
      @SCADASupportPh  ปีที่แล้ว

      Thank you for the inquiry @xicor_ly, unfortunately, my backup copies were purged from my hard drive, so this video is the only copy available.

    • @RR42636
      @RR42636 9 หลายเดือนก่อน +1

      sure!