Uppal Elevated Corridor Latest Status |

แชร์
ฝัง
  • เผยแพร่เมื่อ 18 ต.ค. 2024
  • This video is about upcoming flyover from Uppal to narapapply
    Hey all, Welcome to my channel. Thanks for looking at my videos. If you like my videos please consider subscribing.
    ♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥
    FOLLOW:
    INSTAGRAM: / laxman.pithani
    TWITTER: / laxman_travel
    Thank you for 74700+ subscribers
    ♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥
    Like, share and subscribe:
    / travelwithlaxman
    ♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥
    #Hyderabad
    #Developments

ความคิดเห็น • 139

  • @malyalasaiphaneendra6172
    @malyalasaiphaneendra6172 10 หลายเดือนก่อน +4

    Nen BTech pass ainappudu start aindi ippatiki 3 companies switch aina kani elevated corridor construction matram atle undi.
    Bro Peerzadiguda roads meeda kuda oka video cheyyandi. Chala dharunam ga unnai

  • @Abhi-qt3rh
    @Abhi-qt3rh 11 หลายเดือนก่อน +8

    I become BRS follower after watching your videos. Thanks for the valuable information. Few years ago I have lot of misconception about kcr nd ktr but I am totally wrong.

    • @Nijam_matladu
      @Nijam_matladu 10 หลายเดือนก่อน +1

      Major delay in project is due to relocation of power lines, drainage lines and land acquisition. All the funds were released by central government. Cheap politics resulted in public suffering.

    • @vihaanvv9850
      @vihaanvv9850 10 หลายเดือนก่อน

      Thu mee bathukulu cheda @Nijam_matladu .. "dengalayka langa addam vachindi " annadu nee lantodu. BRS govt. was able to complete many flyovers under SRDP but there were no issues as said "due to relocation of power lines, drainage lines and land acquisition". Telangana people should understand this and vote for BRS.@@Nijam_matladu

  • @satyanarayanas5432
    @satyanarayanas5432 11 หลายเดือนก่อน +21

    in twitter all of us should tag about slow piece of work progress on uppal narapally fly over to Honorable Nitin Gadgari Ji (Roads and Transport Minister) and NHAI and to KTR sir atleast to complete service roads full fledged work . already i did, if possible every one should tag instead of placing comments here as common public as end of the day we are facing problem.

    • @kalyan581
      @kalyan581 11 หลายเดือนก่อน

      i agree it was going very slow in past but now its changed. I see a lot of work happening now at a fast-pace!

  • @pendamsrinivas2784
    @pendamsrinivas2784 11 หลายเดือนก่อน +14

    slowest under construction flyover in world....State govt completed record number of flyovers in the same time

  • @Rass499
    @Rass499 11 หลายเดือนก่อน +6

    Thank you for the update bro! Keep up the good work 👍

  • @venuvedula9590
    @venuvedula9590 11 หลายเดือนก่อน +13

    We might be travelling by bullet trains and flying bikes by the time this flyover is completed. If at all they complete it in another 4 years, this would probably the only fly over with brand new slabs on a ten year old pillars.

  • @gaddesuvarna9271
    @gaddesuvarna9271 11 หลายเดือนก่อน +4

    Bro uppal circle deghara inko flyover on process lo undhi kadha which is going to go from top of skywalk and metro,pls make an update on that and btw love ur videos bro I am interested in this so much❤

    • @dussamanojkumar
      @dussamanojkumar 7 หลายเดือนก่อน

      Adhe ee video bro😅😂😂

    • @gaddesuvarna9271
      @gaddesuvarna9271 7 หลายเดือนก่อน

      @@dussamanojkumar le bro uppal ring road degara ramanthapur nunchi oka flyover vastundhi Dani plan paina video petali..akada metro and skywalk paina nunchi oka flyover kadthunaru

  • @rexoctalish
    @rexoctalish 11 หลายเดือนก่อน +18

    బ్రో మీరు 2నెలల కింద చేసినా, ఇంకో 2 సంవత్సరాల తరువాత చేసినా ఇందులో ఎలాంటి మార్పు ఉండదు. ఎందుకంటే ఇది కేంద్రం చేతిలో ఉంది. ఈ fly over తొందరగా కట్టండి రా అని అడగాలి అన్నా, చెప్పాలి అన్నా, దీని బాస్ ఢిల్లీలో ఉన్నాడు. అక్కడికి వెళ్లి బుచ్ఛం ఎత్తుకోవాలి.

    • @truthspeaksforever
      @truthspeaksforever 11 หลายเดือนก่อน +1

      BRSXk killed this flyover..not working on drianahe and pipelines fir years and years Bose dk😂

    • @snehithreddy13
      @snehithreddy13 11 หลายเดือนก่อน +1

      ​​@@truthspeaksforever nice cover drive...state gov has nothing to do in this flyover

    • @truthspeaksforever
      @truthspeaksforever 11 หลายเดือนก่อน

      @@snehithreddy13 Nice googly...sorry check facts...it's state govt duty to fix underground drianage ..pipelines and other cables. Central govt duty to construct only flyover. Same issue not giving lands fir Nagulapally terminal.. not giving lands for hospitals..list is long

    • @nsreddy0408
      @nsreddy0408 11 หลายเดือนก่อน

      What does underground drainage and electrical lines on the sides have to do with flyover 🙄. They will effect construction of service roads may be but does not bother with flyover construction.

    • @truthspeaksforever
      @truthspeaksforever 11 หลายเดือนก่อน

      @@nsreddy0408 that's not the order of work.

  • @amerkhan253
    @amerkhan253 11 หลายเดือนก่อน +3

    Ghatkesar kondapur railway over bridge gurinchi teeyandi

  • @praveengoud8230
    @praveengoud8230 11 หลายเดือนก่อน +27

    ఇది కూడా రాష్ట్ర ప్రభుత్వం చేతిలో ఉంటే 2 సంవత్సరాల క్రితమే పూర్తి అయ్యేది..... కేంద్ర ప్రభుత్వం ఆధ్వర్యంలో పనులు జరుగుతున్నాయి కాబట్టే ఆలస్యం

    • @Jaihind36
      @Jaihind36 11 หลายเดือนก่อน +1

      Mari MMTS Evaru Late Chesaro?

    • @alwaysonmath5416
      @alwaysonmath5416 11 หลายเดือนก่อน +1

      ​@@Jaihind36metro in hyd is not feasible ani central govt enduku antundi?
      Both the govts have to come together to solve the issues of the state.

    • @kalyan581
      @kalyan581 11 หลายเดือนก่อน +3

      that's not correct---land acquisition happened very slowly and our state government was in-charge of it. Also our contractor declared IP and this was in court and hence took time.

    • @Nijam_matladu
      @Nijam_matladu 10 หลายเดือนก่อน +1

      Major delay in project is due to relocation of power lines, drainage lines and land acquisition. All the funds were released by central government. Cheap politics resulted in public suffering.

    • @vihaanvv9850
      @vihaanvv9850 10 หลายเดือนก่อน

      @@Jaihind36 Thu mee bathukulu cheda

  • @kirruvrr
    @kirruvrr 11 หลายเดือนก่อน +3

    Hello sir, Is it under SRDP or central government?

  • @saideepak5017
    @saideepak5017 11 หลายเดือนก่อน +1

    Thanks brother Adagane vedio chesinadhuku

  • @sunriseankuram1362
    @sunriseankuram1362 10 หลายเดือนก่อน

    Now Govt change..will there any future of East Hyderabad & this flyover completion

  • @superjrao7161
    @superjrao7161 11 หลายเดือนก่อน +11

    Gadkari is not giving any priority for Hyderabad

    • @R_Umesh_Chandra
      @R_Umesh_Chandra 11 หลายเดือนก่อน

      If people don't vote for BJP then they won't cooperate with state govt. For fast completion of project let's make Double Engine Sarkaar 😂

    • @Telangana567
      @Telangana567 11 หลายเดือนก่อน +8

      ​@@R_Umesh_Chandrainstead of making double engine lets make bjp without any engine 😂😂. Don't vote in parliament and Assembly elections 😅😅

    • @R_Umesh_Chandra
      @R_Umesh_Chandra 11 หลายเดือนก่อน

      @@Telangana567
      If we don't vote for BJP atleast in parliament elections then Khangress promotes Islam and involves in Scams 😂

  • @shiekkaleem4539
    @shiekkaleem4539 11 หลายเดือนก่อน

    Emaina down ramps unnaya? Like pvnr

  • @swamypullaiah5942
    @swamypullaiah5942 7 หลายเดือนก่อน

    త్వరగా పూర్తి చేయాలి 😊😊

  • @RivanmiddleeastRiv
    @RivanmiddleeastRiv 7 หลายเดือนก่อน +4

    Its delay pure because of Central government fund NHCI. All hyderabadies should should show to BJP in coming elections. I felldown from byke in this roads twice. I understood last TRS government also made delays in doing surveys for construction clearance. So both government responsibility

  • @ఓంనమఃశివాయ
    @ఓంనమఃశివాయ 11 หลายเดือนก่อน +7

    SRDP kaadhu kadhaa andhukenemo late avuthondhi ..eppuudu complete avuthondho emo

    • @gkr1148
      @gkr1148 11 หลายเดือนก่อน +2

      Adi avvadamma

  • @vrj8302
    @vrj8302 8 หลายเดือนก่อน +1

    ఈ flyover వల్ల ఉప్పల్, పిర్జ్యాధిగూడ, బొడుప్పల్ & మెడ్డిపెల్లి వారికి ఏ లాంటి సౌకర్యం లేదు. చివరికి ఉప్పల్ ring road దగ్గరైన entry/exit ఇస్తే chala traffic flyover ను use చేసుకుంటారు

  • @SureshBabu-iu8mm
    @SureshBabu-iu8mm 7 หลายเดือนก่อน +1

    This is world record project in NHAI history, Another 5 years minimum

  • @kishorekuthadi7871
    @kishorekuthadi7871 7 หลายเดือนก่อน

    Uppal metro paina nunchi anta ee Fly over....

  • @joshisampathsharma1653
    @joshisampathsharma1653 11 หลายเดือนก่อน +1

    Tq sir.

  • @bakasurafoods
    @bakasurafoods 11 หลายเดือนก่อน +4

    6 years jaruguthneee undi..

  • @vishnuvardhanreddyp8570
    @vishnuvardhanreddyp8570 11 หลายเดือนก่อน +8

    The service road was totally devastated....NHAI did never understood the difficulty of people and asked the contractor to fix the road ASAP the pillar is completed....many people met with accidents....there were many fights happened on it but never and ever NHAI concerned for people....state government has layed the new service road after many requests.

    • @VALAR_Morgulis.
      @VALAR_Morgulis. 11 หลายเดือนก่อน

      How can you say this is nahi project...

    • @Nijam_matladu
      @Nijam_matladu 10 หลายเดือนก่อน

      Major delay in project is due to relocation of power lines, drainage lines and land acquisition. All the funds were released by central government. Cheap politics resulted in public suffering. New road works funds were released by central government additionally and on special request of Ex MLA

  • @vrj8302
    @vrj8302 8 หลายเดือนก่อน

    I don't think this elevated flyover starts from Golnaka to the power grid (Narapally). No exit and no entry at Uppal area

  • @technicalmirza566
    @technicalmirza566 11 หลายเดือนก่อน +1

    👍👍👍👍👍👍👍

  • @RV-pi1zi
    @RV-pi1zi 11 หลายเดือนก่อน +3

    Enka yenni years pattudhi bro... Already start chesi 8 years indhi😂😂😂😂... E Central govt. Koncham kuda siggu ledha bro. 🤗

  • @terranowa2080
    @terranowa2080 11 หลายเดือนก่อน +2

    This will be completed in year 2100

  • @Nijam_matladu
    @Nijam_matladu 11 หลายเดือนก่อน +4

    The reason for delay of this flyover is due to relocation issue of electricity poles and drainage lines by Telangana state government. Because of cheap politics public are suffering.

    • @vihaanvv9850
      @vihaanvv9850 10 หลายเดือนก่อน

      Thu mee bathukulu cheda @Nijam_matladu .. "dengalayka langa addam vachindi " annadu nee lantodu. BRS govt. was able to complete many flyovers under SRDP but there were no issues as said "due to relocation of power lines, drainage lines and land acquisition". Telangana people should understand this and vote for BRS.

  • @dear858
    @dear858 11 หลายเดือนก่อน

    What is the name of that lake

  • @rakeshk7914
    @rakeshk7914 11 หลายเดือนก่อน +7

    Enka 5 years iena complete cheyaru

    • @Kamesh-j8f
      @Kamesh-j8f 11 หลายเดือนก่อน

      Why

    • @rexoctalish
      @rexoctalish 11 หลายเดือนก่อน

      ​@@Kamesh-j8f దానికి పైసలు రావడానికి దాని బాస్ ఢిల్లీలో ఉన్నాడు.
      ఢిల్లీకి వెళ్లి అక్కడ బుచ్చం ఎతుకోవలి

    • @HarishKumar-fz3yh
      @HarishKumar-fz3yh 11 หลายเดือนก่อน +1

      Funds ivaru central government

  • @satyanarayanas5432
    @satyanarayanas5432 11 หลายเดือนก่อน +3

    unfortunately common people are suffering, both state and central govt are playing with this project. state govt should take legal action on contractor..

    • @snehithreddy13
      @snehithreddy13 11 หลายเดือนก่อน +2

      When its funded by union govt....what state govt can do ? Its just lack of funds flow.

    • @satyanarayanas5432
      @satyanarayanas5432 11 หลายเดือนก่อน

      all other works by union govt in telangana going fast expect this project. bownpally to medchal with in 6 months most of the work completed by central govt. even state govt should take action on contractor and NHAI. end of the day facing problem yu and me only, not politicians@@snehithreddy13

  • @amkengr
    @amkengr 11 หลายเดือนก่อน +2

    It will be completed before General elections 2024, Kishan reddy geluvale kadha.. work resumed now with new contractor

    • @nsreddy0408
      @nsreddy0408 11 หลายเดือนก่อน +2

      Adantha mana dreams lo brother. Worst BJP leaders asalu. Oka 2 flyover regular ga follow up chesi complete cheyinchaleka potunnaru. Malli votes adgutharu. This single flyover is the proof that BJP candidates from Uppal and Amberpet constituencies will never win this year. I hope they lose MP also. Useless people. As a daily rider I know the pain while travelling from this stretch.

  • @prakat1082
    @prakat1082 11 หลายเดือนก่อน

    దయచేసి ఆ ఉప్పల్ లోని చెరువులోని గుర్రపు డెక్క త్వరగా తొలగించాలి.

  • @balakrishna-xk7mz
    @balakrishna-xk7mz 11 หลายเดือนก่อน +1

    Good coverage

  • @vishnureddy4015
    @vishnureddy4015 11 หลายเดือนก่อน +3

    10 years aindhi

  • @rapellisaivardhan8598
    @rapellisaivardhan8598 11 หลายเดือนก่อน +1

    Brother image towers video update kavale

  • @sridharchennu9460
    @sridharchennu9460 11 หลายเดือนก่อน

    project execute cheyalsina gayatri infra bankruptcy aipoindi .....verevallaki project assign chesa annaru kani vaalu kuda project start cheyatledu enduku ?

  • @superjrao7161
    @superjrao7161 11 หลายเดือนก่อน +1

    I think this is under central government

  • @Aarthikesh
    @Aarthikesh 11 หลายเดือนก่อน +99

    State government has completed 34 projects under SRDP but central government could not finish even one.. This is the efficiency of BJP government...

    • @mahireddy9890
      @mahireddy9890 11 หลายเดือนก่อน +4

      Devanahalli Hoskote Completed.Devanahalli Doddballapur complete by this dec

    • @rexoctalish
      @rexoctalish 11 หลายเดือนก่อน +11

      ​@@mahireddy9890 బ్రో ఆ వీడియోలు మేము కూడా చూశాము. అక్కడక్కడ ఫినిష్ అయిన వీడియోలు చూపించి మొత్తం పని అయిపొయింది అంటే ఎట్లా? మరియు, అతను తెలంగాణ గురించి మాట్లాడితే ఎక్కడో కర్ణాటక లో బీజేపీ కట్టిన సగం సగం పనుల గురించీ చెప్తావు ఎంటి?

    • @mahireddy9890
      @mahireddy9890 11 หลายเดือนก่อน +3

      @@rexoctalish brs ippudu జాతీయ పార్టీ కదా

    • @R_Umesh_Chandra
      @R_Umesh_Chandra 11 หลายเดือนก่อน +3

      Arey BRS banisa majority of projects are undertaking by GoI.

    • @shivasai3643
      @shivasai3643 11 หลายเดือนก่อน +15

      @@R_Umesh_Chandra are bjp banisa, first national project, state projects difference telusko

  • @NagaSanthosh
    @NagaSanthosh 11 หลายเดือนก่อน +2

    From 5yrs no major progress😂, credits to BJP

    • @VALAR_Morgulis.
      @VALAR_Morgulis. 11 หลายเดือนก่อน

      😂😂 foolish people
      Completed projects are by state govt and pending projects are central...
      As soon as this complete again it will be state 😂😂 brainwashed idiotes

  • @truthspeaksforever
    @truthspeaksforever 11 หลายเดือนก่อน +1

    BRS govt killing uppal..taking years to complete land acquisition..building drianage and pipelines..thu!!!!

  • @R_Umesh_Chandra
    @R_Umesh_Chandra 11 หลายเดือนก่อน

    If TG people don't vote for BJP, the BJP at center won't cooperate with respect to projects undertaken by state. So for speedy completion of projects lets make the so called Double Engine Sarkaar 😂

    • @snehithreddy13
      @snehithreddy13 11 หลายเดือนก่อน +3

      They can jst handover the project to state and accept their failure....it can be finished by state govt

    • @R_Umesh_Chandra
      @R_Umesh_Chandra 11 หลายเดือนก่อน

      @@snehithreddy13
      Don't do joke. Do you know how many projects BJP undertaken in and around Delhi. Don't become a slave of KaChaRa.

    • @nsreddy0408
      @nsreddy0408 11 หลายเดือนก่อน +2

      Ikkada chesi chupinchandi ante Delhi gurinchi cheptharu. Have some shame think about your own state brother. They shouldve transferred the funds to state government and accept their inefficiency.

    • @venkatsusheelg9658
      @venkatsusheelg9658 11 หลายเดือนก่อน +1

      Are you blackmailing Telangana People?

    • @R_Umesh_Chandra
      @R_Umesh_Chandra 11 หลายเดือนก่อน

      @@venkatsusheelg9658
      I'm not doing anything to TG people and asking to give power to such party which is at center for speedy development of state. BJP govt will better than present highly corrupt BRS govt

  • @ranadheerreddy2996
    @ranadheerreddy2996 10 หลายเดือนก่อน

    Inka eppudu avtundira nayana ee flyover work. Orey BJP na batta ga twaraga complete cheyra

  • @raghureddy3237
    @raghureddy3237 11 หลายเดือนก่อน +10

    paniki maalina BJP