Watch Out For These RED FLAGS In an RFQ | Machine Shop Talk Ep. 75

แชร์
ฝัง
  • เผยแพร่เมื่อ 5 ก.ค. 2024
  • We all as manufacturing business owners are out there hoping to see RFQs - or requests for quotes - cross our desks, but there are a few things that should instantly raise an alarm when you see them.
    Today on MACHINE SHOP TALK, Ian Sandusky from Lakewood Machine is highlighting a thread he found interesting on the Practical Machinist forums that dives into some RFQ red flags that you should be paying attention to.
    When times get tough and things get lean, it can be the first impulse of every machine shop owner or manager to fight for every request for quote that comes along, but this can have some very dire consequences if you aren’t careful!
    Read the forum thread here: www.practicalmachinist.com/fo...
    What are some of YOUR RFQ red flags that sound the alarm bell? Let us know in the comments below!
    Chapters
    0:00 Introduction
    4:34 Overcomplicated drawings
    9:59 Over-toleranced drawings
    15:28 RFQ comes with price expectations
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    Practical Machinist is the largest and most engaged metalworking community across the web. With more than 160,000 registered members and 400,000+ social media followers, Practical Machinist is the easiest way to learn new techniques, get answers quickly, and discuss common challenges with your peers. Visit Practical Machinist today to join the community and start connecting with your peers.
    Become a Practical Machinist member (www.practicalmachinist.com/)
    Like us on Facebook ( / practicalmachinist )
    Follow us on Instagram ( / practicalmachinist )
    Follow us on Twitter ( / prac_machinist )
    Follow us on TikTok ( / practicalmachinist )
    Connect with us on LinkedIn ( / practical-machinist )
    #machining #machineshop #rfq
  • วิทยาศาสตร์และเทคโนโลยี

ความคิดเห็น • 48

  • @sirzambo7217
    @sirzambo7217 ปีที่แล้ว +16

    After this one, the old man asking to fix his lawnmower doesn't look so bad🤣

  • @georgedreisch2662
    @georgedreisch2662 ปีที่แล้ว +11

    Great topic!
    Sounds like drawings in the aviation industry.
    Ever heard the analogy, measure with a micrometer, mark with a crayon, trim with a axe…

    • @iansandusky417
      @iansandusky417 ปีที่แล้ว +3

      Thank you very much sir!

    • @pb68slab18
      @pb68slab18 ปีที่แล้ว +3

      Chop to length, hammer to fit, paint to match! 😆

    • @georgedreisch2662
      @georgedreisch2662 ปีที่แล้ว +2

      @@pb68slab18 version we went on was, measure with a micrometer, mark with a crayon, trim with a axe. Zinc chromate, polymide primer and pro-seal, can hide a multitude of sins…

  • @leebarnhart831
    @leebarnhart831 ปีที่แล้ว +8

    I'm retired now and only take on the "fun" jobs that come around in my home shop. The last place I worked went bankrupt due to over tolerance drawings. Parts that could have been + or - an inch and it wouldn't have mattered were drawn to .0005". What it was, was a bunch of engineers that were unsure of themselves as engineers and just slapped a tighter than needed tolerance on everything. The inspection department was no better and rejected many otherwise perfectly good working parts. If you tried to bring notice to this their reply would be " if you can't build these we'll find someone who can". I and others there were journeyman machinist with years of experience. That's why they folded up. We could make anything they could design and draw and we did so. It was sad and like watching a drowning man going down and not being able to help him. I was within arms reach of retirement anyway so it effected me very little.( more fishing time) Some of the younger guys didn't fair so well and I felt bad for them. I also felt bad for all the vendors that lost money and was left holding an empty bag when the dust settled.

  • @johncichon9499
    @johncichon9499 ปีที่แล้ว +2

    Excellent video! I'm in a similar industry...deep drawing (mostly) die produced metal parts...but we share many concerns. Often the customer might want "a few" parts up front, so we have to include hydroforming or metal spinning along with 5axis laser or some costly fixturing.
    You hit so many critical points and they are so important. 1) material 2) quantity 3) GDT 4) leadtime 5) surface finish 6) coatings and or rust protection 7) packaging 8) asking if there is a future with volumes that reasonably support the business. 9) in process inspection methods. It's great if a mic or caliper work...but often gets more demanding requiring costly relational gaging to pre-coated material 10) issues multiply on outside processing that are out of your control.
    Different businesses but very similar alligators to wrestle. Thank you!

  • @Ddabig40mac
    @Ddabig40mac ปีที่แล้ว +3

    I work for a structural steel fabrication shop and have a perfect example of tolerance stack, but going the other direction. Several years ago we were building for a Seattle area high-rise and our typical (unless noted) tolerance for most features is plus/minus 1/16". So we hold this tolerance per detailed member, and the jobsite starts stacking columns, full contact end to end, and near the top of the building, they measure overall structure height, and it's too tall, by several inches. Cue the fiasco playlist.

  • @Dsmiffb
    @Dsmiffb ปีที่แล้ว +6

    As a 2 man job shop owner, it seems to me that we are at an all time high of discrepancies between cad models, prints and instructions be it PO’s, verbal instructions, or written instructions. Revs incorrect, correct rev prints not supplied etc. and when you bring up to the customer, it seems like it takes 2-4 days to get a response. You either have to wait for them to reply, move on to another job, or go with your gut instinct on the discrepancy at hand. It seems to me like with the lack of competent workers in any industry, companies are forced to go with less qualified people (engineers in this case) who are making decisions/ tolerances that as you mentioned have no idea what actually matters. Not sure what the answer is. Just frustrating.

    • @KISSMYACE3203
      @KISSMYACE3203 ปีที่แล้ว +2

      Incompetent sums up my coworkers in a nutshell 😅. Not saying I'm better, but the decisions they make on even minute things leave me quizzical.

    • @owievisie
      @owievisie ปีที่แล้ว +2

      Our biggest customer has a brand new team every year and every year we have to teach them how to design for the real world and every time things are going good a lot of people quit or get fired and we start all over again

  • @SR-ml4dn
    @SR-ml4dn ปีที่แล้ว +2

    This is more twenty years back when GE ask us to quote machine parts for them, because they have burnt all machine shops by not paying them due to the postulate, that the part didn't hold the tolerances but GE used strange enough the parts that was produced. At that time GE would rather use 2-3 lawyers than paying the machine shop. Of cause in a good time shops where very reluctant to produce for them again.

  • @syncopating_machinist
    @syncopating_machinist ปีที่แล้ว +1

    I love that the thread OP was not just roasted in the thread but on a youtube video as well. Lol

  • @PeterWMeek
    @PeterWMeek ปีที่แล้ว +3

    Not machining but electronics: I once was approached to make a "neuro-stimulator". This guy thought he would be able to think better if he had low-level current pulses being pushed through his head, and wanted someone to come up with and build an apparatus to do it. My response and recommendation: if the customer wants something for any stated purpose that would be catastrophic if it failed in any way, back off - fast. Don't even give advice.

  • @thomasrandolph7095
    @thomasrandolph7095 ปีที่แล้ว +2

    Another serious red-flag is when they ask for high-volume pricing, but only a small quantity to start, and no ramp-up plan. So, they come to you and say "I'm going to need 10,000 parts in the next quarter...but this quarter I only need 20." If they're not willing to give some assurance, preferably a purchase order with delayed delivery on the other parts, very often they're blowing smoke and don't really have any production ramp-up plans, only wishful thinking. Sure we all love startups, but a lot of time they haven't really REALLY looked carefully at their ability to capture their market and reach their customers. Many many businesses fail by thinking their volume is going to be hyooge, but not having a concrete plan to get there. If the time setting up a volume-production infrastructure on your end is even a tiny fraction over the basic make-it-ship-it costs, you're potentially going to end up eating all that startup costs when they fall flat. So, beware!

    • @iansandusky417
      @iansandusky417 ปีที่แล้ว +2

      This is HUGE and I've seen it more times than I can count, both in my shop and others. When I get RFQ's like this crossing my desk, I'll always break out the pricing to "1st order (20 parts" = $x per part," and then another line for "Subsequent orders" with a minimum order quantity. Usually when they see all the tool-up, fixturing, programming, etc slapped onto that first order, it's a bit of a shock.
      If nothing else, it helps separate the serious potential customers from the tire-kickers and people looking to take advantage!

    • @thomasrandolph7095
      @thomasrandolph7095 ปีที่แล้ว +1

      @@iansandusky417 In the EE world where I mostly live, we call that "NRE"...Non-Recurring Engineering charges. We charge 'em up-front, and with full markup over our costs. If they can't afford to fund the development, then they certainly can't pay for the production!

  • @ostie01
    @ostie01 ปีที่แล้ว +3

    I got rid of a couple of customers that absolutely wanted to quote their drawings in metric where 2 inches features would have been OK, but they were always quoting 50 mm. metric material is very difficult to get here. Every parts that could be standard inch dimensions were quoted in metric like, 12 mm for 1/2 etc. No more problem with them.

  • @pb68slab18
    @pb68slab18 ปีที่แล้ว +1

    We bring in a few mechanical engineering students every semester for work experience. Now I learned mechanical drafting with a drafting table, T-square, Leitz instruments and a PENCIL. The CAD drawings these kids make are almost comical! Dimensions coming from every corner and surface! I learned to dimension from center, or upper right corner, just like you read. Plus ya go from a back stop, back vise jaw, and a stop on the left. Accumulating and/or over-lapping tolerances are usually the by-product.

  • @jestonporter5049
    @jestonporter5049 ปีที่แล้ว +1

    Whoever drew that part can take a hike. That's insane!

  • @bobjimenez4464
    @bobjimenez4464 ปีที่แล้ว +3

    It's acceptable to define tolerances inside the model file with the blueprint only defining specs and process requirements. The print might have a few views of the part with some reference dimensions....Be very careful dealing with those.
    Another type of print might only contain Basic Dimensions for all features with the Datum Structure defined in a b/p note. The note will probably also contain the tolerance for all features.
    An example of tolerance : [ profile .001 (S) A-B-C ] ..... this sure makes the engineer's job easy but kills the shop that wins the bid. Always be aware of updates to geometric dimensioning and tolerance requirements. Also be certain that you completely understand the outdated GDT requirements for those old prints.

  • @Whitehorze
    @Whitehorze ปีที่แล้ว +3

    The company where I work we machine alot of plastic. We got a part that could literally have been made with + - .01 tolerance and it wouldn't have affected fit or function. Instead we got .0005 over the entire contour. AND 100% CMM sorting - For a screw driver handle.

    • @iansandusky417
      @iansandusky417 ปีที่แล้ว

      Sheeeesh, yeah that's a spot-on example!

  • @peterjensen6233
    @peterjensen6233 ปีที่แล้ว +3

    Good information, is that a new broom?

    • @iansandusky417
      @iansandusky417 ปีที่แล้ว +1

      Good eye, it sure is! Big spenders here today!

  • @alexg7146
    @alexg7146 7 หลายเดือนก่อน

    Not really involved in the quotation process but I do hear my boss complain sometimes that some people are asking for the cost to be lower than what the cost of the materials would be.

  • @Squintz45
    @Squintz45 ปีที่แล้ว +4

    This guy is building a time machine... on a budget

    • @iansandusky417
      @iansandusky417 ปีที่แล้ว +2

      gotta harvest that thelemic energy bro

  • @ExMachinaEngineering
    @ExMachinaEngineering ปีที่แล้ว +1

    Good overview.

    • @iansandusky417
      @iansandusky417 ปีที่แล้ว

      Thank you very much for checking it out!

  • @BrilliantDesignOnline
    @BrilliantDesignOnline ปีที่แล้ว +1

    Good chat.

    • @iansandusky417
      @iansandusky417 ปีที่แล้ว +2

      Thank you very much for checking it out!

  • @suhailghori2573
    @suhailghori2573 ปีที่แล้ว +1

    Well explained it could be even better with an example

    • @iansandusky417
      @iansandusky417 ปีที่แล้ว +1

      Thank you sir! There’s a good example on the thread linked in the description if you’re interested!

  • @TrPrecisionMachining
    @TrPrecisionMachining ปีที่แล้ว +1

    hello from spain...good video

  • @helmsplitter0233
    @helmsplitter0233 ปีที่แล้ว +1

    that print is sooooo cursed

  • @hadenmills2222
    @hadenmills2222 ปีที่แล้ว +1

    I've seen customers give me +-.0000 or +0-.0001 before. I just grind it as close as I can lol

    • @iansandusky417
      @iansandusky417 ปีที่แล้ว +1

      Gotta love that - I always wonder how they're going to measure it when they receive it!

  • @aronnootebos805
    @aronnootebos805 ปีที่แล้ว +2

    This is a great video, but the music is terrible. I think most of us have the attention span to get through this without the help of music.

  • @quetshupfa
    @quetshupfa ปีที่แล้ว +2

    I would add URGENCY, customers think they throw money and the monkey dance that aint happening....and Missing Info, there are a lot of custumers who conceal information from the manufacturer.

  • @hughmcallister2574
    @hughmcallister2574 ปีที่แล้ว +1

    I just got a drawing that was made in 1950, that actually called out a hole position with +/- .0000
    WTH!

    • @iansandusky417
      @iansandusky417 ปีที่แล้ว +2

      "Hey, just whip that out in that ol' Bridgeport over there. It's just a block with a couple of holes, what do you mean it's going to cost $1000 and you can't do it while I wait?"

    • @AlitaGunm99
      @AlitaGunm99 ปีที่แล้ว +1

      Bonus tolerance from GD&T?

  • @PrevostNewbie
    @PrevostNewbie ปีที่แล้ว +1

    Looking at a drawing for the first time to quote, there is no way the Estimator can have an opinion on what needs to be critical and what does not need to be critical from the design intent. I think what would be a better topic for discussion would be examples of how Engineers might format drawings that help make the design intent clear from the machinist point of view so when the part is finished it meets the Engineers expectations.

  • @timstevens3361
    @timstevens3361 13 วันที่ผ่านมา

    IF it dont make sense,
    my #1 answer is,
    it was drawn by a woman,
    my #2 answer would be
    a new engineer.

  • @davegriffith6786
    @davegriffith6786 ปีที่แล้ว

    Talk to much, get to the point.