TUNNEL PROGRESS AT GIGA TEXAS! - Tesla Gigafactory Austin 4K Day 4/11/24 - Tesla Terafactory Texas

แชร์
ฝัง
  • เผยแพร่เมื่อ 10 เม.ย. 2024
  • Please enjoy the video and as always, I appreciate all comments, questions, statements, proclamations and otherwise below!
    If you enjoy this content and want more such as behind the scenes and b-roll, please consider supporting me on Patreon at: / gigafactoryaustindrone...
    Or please consider a one-time contribution via PayPal at: paypal.me/peterdog?locale.x=e... or drop some Bitcoin in my wallet here: 3QR1ApDVv6V1sEvApXnfNu42oKK9vRhBPp
    THANK YOU FOR YOUR SUPPORT!!
    #gigatexas #tesla #cybertruck
    QUAD SQUAD CHANNELS
    Jack - Texas Terafactory (FLIGHTS SUSPENDED)
    For 4K flights over new areas and “first looks”, there’s no better source than:
    / @texasterafactory
    Randy - Terafactory Texas (FLIGHTS SUSPENDED)
    For a unique perspective and consistent updates later in the day that show progress within a single day, your must-view source is:
    / @terafactorytexas
    Joe - Joe Tegtmeyer
    For deep-dives into the mechanics of construction, indications of future plans and overall comprehensive coverage, your go-to source is:
    / @joetegtmeyer
    Jeff (me) - Jeff Roberts
    And for your weekly fix for 4K cinematic fly-overs with occasional “celebrity” appearances, the place to be is:
    / @peterdog15
    Together, we are the “Quad Squad” and there’s no better coverage of Giga Texas anywhere!
    Equipment used:
    iPhone 11 Pro Max
    DJI Mavic Air 2
    DJI Mavic 2 Zoom
    DJI Smart Controller
    DJI Mavic Mini 2
    Autel EVO II 8K (used on this video)
    Blackmagic Pocket Cinema 4K
    Music in this video:
    Artist: Joe Solo
    Song: "Awesome Flow"
    "It is my pleasure and an absolute honor to be "gifted" the access to sit in the front row of the world theater to witness the best performance of human progress yet!" - Jeff Roberts 2020

ความคิดเห็น • 71

  • @barrywinters1142
    @barrywinters1142 25 วันที่ผ่านมา +17

    Thanks Jeff for taking the time to record the progress for us

  • @superfly19751
    @superfly19751 25 วันที่ผ่านมา +10

    This will be an absolute state of the art in no more than 2 years.
    Absolutely amazing!

  • @gottabekidding8626
    @gottabekidding8626 25 วันที่ผ่านมา +20

    Thank you SO MUCH for this "fix"! I was having severe withdrawal symptoms! 😂

    • @peterdog15
      @peterdog15  25 วันที่ผ่านมา +7

      That means a lot! Ty!!

  • @DessieDoolan
    @DessieDoolan 25 วันที่ผ่านมา +15

    Thanks Jeff
    0:20. Casting, east. Paved ramp to loading docks being demolished.
    0:29. BIW, apron. Bottom right. Cables draped out of the electrical vault up against the wall.
    0:41. BIW, roof. Top centre. Scaffold with a new flue in the middle. Top right. Scaffold and some lengths of flue stacked on the roof.
    0:47. BIW, apron. 6 mobile chiller units, yet to be connected.
    0:56. BIW, apron. Trailer with a red Model Y BIW, and a Cybertruck.
    1:04. Southend, easement. Bottom left. New structure. Speculating this a structure for a bridge crane to unload coils of metal etc.
    Footings/pilecaps already have concrete placed in the forms.
    Column forms/shutters to the left.
    1:12. Southend, inside. Yellow plastic laid. Unexpected. Would be the first time the floor slab has preceded the structure on this project. Piddler sized outbuildings excepted.
    1:29. Southend, inside. Centre passage/tunnel, roof complete.
    Roof. Parapet wall backing panels in place. No doubt a glazed facade is next.
    1:33. Southend, inside. West passage/tunnel. Formwork for the roof and rebar visible.
    1:52. GA, apron. Bottom right. Section of wall cut out for a door opening has been removed since Brad flew over earlier.
    GA, roof. To the right of the crane boom. 2 large rectangular cowls have been installed.
    2:30. Battery, apron. Bottom right. Red pump and a couple of hose/pipe runs in through a pedestrian door. Something being pressurized.
    3:25. Tesla Road, north. Pair of large parallel ductbanks. From nowhere to nowhere much else.
    3:33. BESS. Contractor trailers gone. Only a shipping container and the BESS switchyard PTs replaced back in January.
    3:48. Temporary Switchyard site. New ductbanks as far as the eye can see.
    4:35. Old EOL staging yard. But for the entrance tent, all the other temporary structures have been removed.
    4:52. Parking Garage site. Pair of large stormwater drains presumably heading towards the sedimentation pond outfall channel.
    5:10. East contractors yards. Bottom. Open sided building salvaged from Ye Olde Bagging Plant has some cylindrical items stacked inside.
    5:48. Crash Test Track. Crash wall has been shifted to the left of the cable channel.
    6:16. Cathode, west. Apron. Formed up for a sliver of pavement, or a curb perhaps.
    6:24. Cathode, west. Dismantling the rubbish chute scaffold.
    6:28. Cathode. Tank Farm. New pipework up the top of the 4 stainless steel tanks.
    6:44. Die Shop, south. Ramp paving complete.
    7:33. Northend. Easement. Bottom right. Valve visible on the pipeline.
    9:29. Westside. Tunnel Project. MPV with a load of lining segments going the wrong way.
    10:32. Southend, inside. Building the slab edgeboards/formwork on the yellow plastic.
    11:33. New EOL. Northwest parking. Asphalt paving laid. Massive area, configured differently to the transport yard. I wonder the purpose.
    12:16. Westside. Tunnel Project. Mobile crane. Possibly to lift the first of the additional back-up decks into place. Att. David Salisbury.
    13:18. Southend, inside. Right. Stacks of shuttering for a retaining wall to be built on the strip footing/grade beam.
    13:39. GA roof. 2 scaffolds here.
    13:43. GA/BIW roof. PV array. Electrical control cabinets marked 7 and 8. 3 and 4 at 13:58. 1 and 2 at 14:04.
    14:02. Paint, roof. Roof Pipework Project. Pipes now insulated turn down into Paint.

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 24 วันที่ผ่านมา +2

      10:29 Reconnecting power for the east parking lot Superchargers to the main building.
      3:25 and 3:48 This appears to be a major new electrical project....
      Two new duct-banks with have conduit than the main power duct-banks! They are also running parallel to the existing main power duct-banks. 12 conduits per duct-bank vs 8 conduits per duct-bank in the existing main power duct-banks.
      Speculating that both sets of duct-banks @ 3:25 and 3:48 will be connected together.
      Also speculating that these new duct-banks may enter the building on the northside of casting where they previously placed 2 vaults, but haven used them yet.

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 24 วันที่ผ่านมา +2

      3:25 and 3:48 Continued.... Joe's video 9/11/23 at the 19: 39 timestamp shows the new duct-banks coming out of the mega-vault. They had to temporarily stop because the old substation was in the way.

    • @DessieDoolan
      @DessieDoolan 24 วันที่ผ่านมา

      @@DavidJohnson-tv2nn If you view the site from 3:47 it's difficult to gauge where these ductbanks will run to, or from. The pair closest to Tesla Road on the right needs to cross the existing ductbank to somehow connect to the New Switchyard/Substation at the Mega-Vaults, or anywhere else for that matter.
      Might also need to cross the new ductbanks seen at 3:50, unless the plan is to connect into those.
      Wouldn't like to even speculate where any of these will enter the Main Building. I see elsewhere you mention additional supply for Battery.

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 18 วันที่ผ่านมา

      @@DessieDoolan Sorry Dessie, I just now found your comment while looking for something else. Didn't mean to ignore you.
      3:47 The new duct-banks can cross over/under the existing duct-banks, more likely under. To think they won't link up with the duct-banks coming out of the mega-vault @ 3:49 would be a mistake in my opinion.
      3:50 The likely plan is the duct-banks closest to Tesla road will link up with these.
      The question I have is....
      Will the duct-banks @ 3:50 split at vaults? With branches going under Tesla road to the north side of casting, as well as south under Tesla road, along the eastside of the easement? We definitely need some time to know that.
      "additional supply for battery".....
      I did mention that there two possible reasons for the need for such a huge increase in power to the factory....
      Addition power for the section where they make the 4680 batteries, and....
      The rumored data center.
      In any case, this is all speculation. Time will tell if it is correct.

  • @KenWerkSolar
    @KenWerkSolar 25 วันที่ผ่านมา +11

    The number of tunnel wall segments (sets of 6) laid out on the ground near the tunnel gives an indication of how long this tunnel will be. The rate at which they disappear into the tunnel will show the rate they are tunneling. So far it has been extremely slow. I'm watching for the speed to pick up.

    • @mattsparks5957
      @mattsparks5957 25 วันที่ผ่านมา

      Where will the tunnel end? Inside the new addition?
      How much longer until it brakes ground on the other side?
      Maybe another week, Fiday 19th?
      Its taking FOREVER!!
      Not as long as the front entrance did though, thankfully..

    • @davidsalisbury50
      @davidsalisbury50 25 วันที่ผ่านมา +2

      @@mattsparks5957in a couple of days they will stop to install all the backup decks still on the surface. This will take at least 2 weeks to install/connect/test/commission. Then they can get into full production. Currently they maintain 15-20 sets of segments (6) fully dressed and prepared on the surface. Prep takes a minimum of 24 hours, so they can’t be expecting higher production than 20 rings per day (30m).
      Maybe more after the backup installation.

    • @davidsalisbury50
      @davidsalisbury50 25 วันที่ผ่านมา +2

      Expect completion mid-late May.

  • @inqwit1
    @inqwit1 25 วันที่ผ่านมา +7

    Thank you. It would be nice to see tunnel shells moving in or dirt moving out.

  • @Inert007
    @Inert007 25 วันที่ผ่านมา +14

    Lot's of Cybertrucks!!! I'm loving it!!! Maybe June for me if I'm lucky!!!!!!!

    • @peterdog15
      @peterdog15  25 วันที่ผ่านมา +5

      🤞

  • @memrjohnno
    @memrjohnno 25 วันที่ผ่านมา +6

    New EOL & outbound lot is busier than a Gazan bricklayer and GT is only partially through the ramping up of production.

  • @jeremyhancock9858
    @jeremyhancock9858 25 วันที่ผ่านมา +8

    Looks like getting ready for concrete floor on south side.

    • @DessieDoolan
      @DessieDoolan 25 วันที่ผ่านมา +2

      Quite unexpected. Can't imagine why, unless it has something to do with the tunneling project. First time the floor slabs have been constructed before the steel frame has been erected.

    • @ironicgoose9913
      @ironicgoose9913 25 วันที่ผ่านมา +1

      @@DessieDoolan I also think it is because of tunneling. I think that is the place where boring machine will come out and they're preparing site to disassemble it

    • @DessieDoolan
      @DessieDoolan 24 วันที่ผ่านมา +1

      @@ironicgoose9913 I'm thinking along the lines of we're seeing work that needs to go ahead, after being delayed by the tunnel project.
      Other than the substantial base for a crane, the TBM was assembled on bare earth and gravel. I would guess disassembly would be the same.
      This slab is huge. Might be beefed up enough to support a crane, but I think we are seeing works that otherwise would have happened deep inside a finished building.
      We should know soon enough if the slab extends further south. Joe is flying today (12 April).

  • @davidsalisbury50
    @davidsalisbury50 25 วันที่ผ่านมา +3

    12:26- mobile crane at tunnel portal looks too small to lift the backup decks.
    Maybe there for the prep work (remove conveyor and support) to allow the decks to be installed with a larger crane. Will see next week. Estimate 2 days before they stop for installation.

    • @DessieDoolan
      @DessieDoolan 25 วันที่ผ่านมา +2

      12:26. Thanks David. Couldn't quite gauge the size of the crane.

  • @synftw_
    @synftw_ 25 วันที่ผ่านมา +5

    It's been a long week waiting for updates, then you and Brad both today! Glad to see everything moving in the right direction. The construction east of the expansion is interesting. Bus stop, perhaps? Also, what's the massive amounts of conduit going in near the temp switchyard?

  • @59seank
    @59seank 25 วันที่ผ่านมา +3

    Thanks Jeff!

  • @philipmartin3075
    @philipmartin3075 24 วันที่ผ่านมา +1

    Thank you Jeff!

  • @josepecanocano1587
    @josepecanocano1587 24 วันที่ผ่านมา +1

    Thanks you Jeff, video fantastic, from Malaga Spain

  • @PuppiesPuppies
    @PuppiesPuppies 23 วันที่ผ่านมา

    The extended shot at the end before the roof flyover really shows how busy the whole area is. Thousands of people moving around, construction, cranes, so much stuff happening there. Great shot Jeff!

  • @nanaimoshoerepair
    @nanaimoshoerepair 17 วันที่ผ่านมา +1

    Hey Jeff. Thanks for all the work to bring us these videos, I don't mean to complain at all, but I do miss the Bonus time feature. That has brought a smile to my face for years now. "Bonus time. YEEEAAAh" ( fireworks). Would you consider bringing it back once in a while? Just saying, and again, thank you.

  • @MrFoxRobert
    @MrFoxRobert 25 วันที่ผ่านมา +1

    Thank you!

  • @memrjohnno
    @memrjohnno 25 วันที่ผ่านมา +3

    Cool. Cheers.

  • @TeslaElonSpaceXFan
    @TeslaElonSpaceXFan 25 วันที่ผ่านมา +2

    😍

  • @richard_zanormous3648
    @richard_zanormous3648 24 วันที่ผ่านมา +2

    I’m down 40% on this stock

  • @andreandre1051
    @andreandre1051 24 วันที่ผ่านมา +1

    Merci👍👍👍

  • @jamesg2382
    @jamesg2382 25 วันที่ผ่านมา

    Thanks for the video. I wish it were possible to slip more frames into the pan shots to make them less stuttery. Perhaps it’s just my feed. Much appreciated as usual.

  • @loucatozzi7656
    @loucatozzi7656 25 วันที่ผ่านมา +4

    Is it just me or are they producing FAR more CT's than MY's lately?

    • @peterdog15
      @peterdog15  25 วันที่ผ่านมา +2

      Seems like that but no.

  • @nathanprice4568
    @nathanprice4568 25 วันที่ผ่านมา +3

    400 CTs

  • @sagecoach
    @sagecoach 25 วันที่ผ่านมา +1

    Looks like the tunnel will emerge inside the new addition building. I wonder what the heavy foundations in the addition have to do with the tunnel nearby?

  • @Cacowninja
    @Cacowninja 18 วันที่ผ่านมา

    When will the whole property be finished?

  • @DrTofutybeast
    @DrTofutybeast 25 วันที่ผ่านมา +3

    Thank 🐦 you.
    Could you slow down your camera sweep like you did in the past.
    It was very meditative.

  • @doubledranch871
    @doubledranch871 24 วันที่ผ่านมา +1

    No captions for the hearing impaired!

    • @DessieDoolan
      @DessieDoolan 24 วันที่ผ่านมา

      There's no commentary to caption.

    • @doubledranch871
      @doubledranch871 23 วันที่ผ่านมา

      @@DessieDoolan Thank you. No need for me to run the video.
      That's a shame....

    • @DessieDoolan
      @DessieDoolan 23 วันที่ผ่านมา

      @@doubledranch871 Joe Tegtmeyer does the commentary. His videos have captions.

  • @davidsalisbury50
    @davidsalisbury50 25 วันที่ผ่านมา +2

    10:30 looks like a waterproof membrane being laid along the tunnel alignment. No idea why that is.

    • @DessieDoolan
      @DessieDoolan 25 วันที่ผ่านมา +2

      10:30. Would be in the column bay next south to the tunnel alignment. It's unique. Always put the steelwork up first elsewhere on the site.
      I guess there's a chance it's temporary, but that wouldn't explain the plastic.

    • @tunnellingsalisbury7605
      @tunnellingsalisbury7605 24 วันที่ผ่านมา

      @@DessieDoolan It may be that this slab is being designed more robustly as it will be adjacent to where the tunnel will surface. Potential for movement/heave/grout leak may cause them to waterproof it and have it act as a single continuous slab.

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 24 วันที่ผ่านมา

      10:30 Waterproof membrane....
      Indicates the slab will be permanent. Which seems to be evidence against the tunnel extending that far. Placing a crane on the new slab and lifting the TBM would probably crack the slab, unless it was really thick and heavily reinforced. If the tunnel doesn't come up at an angle, that is, an elevator is used to lower vehicles to the tunnel entrance....
      An excavation next to the slab and temporary retaining wall would be required. An elevator would waste the least amount of floor space in the factory.

    • @DessieDoolan
      @DessieDoolan 24 วันที่ผ่านมา +1

      @@tunnellingsalisbury7605 Quite a different arrangement to the assembly site then.
      I'm thinking this is works delayed by the tunnel project that has got to the point that it must now proceed, tunnel or no tunnel. As you say, slab beefed up to handle the emerging TBM and crane to remove it.
      They seem to have prepared the next row south also.

    • @DessieDoolan
      @DessieDoolan 24 วันที่ผ่านมา +1

      @@DavidJohnson-tv2nn 10:30. Tunnel alignment is in the next column bay north.

  • @TheBensonBadBoy
    @TheBensonBadBoy 25 วันที่ผ่านมา +2

    so does anyone have an estimate on how many cybertrucks are produced a day?

    • @georgedoolittle7574
      @georgedoolittle7574 25 วันที่ผ่านมา

      Well North of 100 would appear. Should be an interesting Q1 management report coming up absolutely and probably most important ever for Tesla given how truly massive this Enterprise has now become. Long $hmc Honda Motor Corporation strong buy.

  • @rRobertSmith
    @rRobertSmith 25 วันที่ผ่านมา +3

    Elon put up some solar powered shade in the various parking lots, the 110 degree F Texas sun
    is unbearable and is cooking your workers (and guests) cars!

    • @Mattanimus
      @Mattanimus 25 วันที่ผ่านมา +2

      The new parking structure has shade for almost all of the levels.

    • @dewiz9596
      @dewiz9596 25 วันที่ผ่านมา +2

      A/C is standard equipment on cars these days

  • @CrustyAbsconder
    @CrustyAbsconder 25 วันที่ผ่านมา +1

    This Tunnel will likely extend to the Planet Moon and cause Venus to leave the Solar System

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 24 วันที่ผ่านมา

      If it would cause Musk to leave the solar system I would be happy😊

  • @DavidJohnson-tv2nn
    @DavidJohnson-tv2nn 24 วันที่ผ่านมา +1

    Thanks Jeff for catching a new project that everyone else missed!
    Major new electrical project.....
    Tesla road, north:
    @ 3:25 (Bottom left) Two new duct-banks with more conduit than the main power duct-banks! They are also running parallel to the existing main power duct-banks. 12 conduits per duct-bank vs 8 conduits per duct-bank in the existing main power duct-banks.
    South of Tesla Enclosure/Mega-vault:
    @ 3:49 (Bottom) Previously constructed duct-banks coming out of the mega-vault are being extended south toward Tesla road. There is a lot of conduit!
    Speculating that both sets of duct-banks will be connected together.
    Also speculating that these new duct-banks may enter the building on the northside of casting where they previously placed 2 vaults.
    River road:
    @ 5:01 (Left) Ongoing progress on the River road extension.
    Megapacks:
    @ 7:48 Caution tape once again, closing off the northwest corner of the yard. More specifically, the transformer in that corner.
    Tunnel alignment:
    @ 10:25 Can't read them, but there two signs along the tunnel alignment on the eastside of the freeway.

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 24 วันที่ผ่านมา

      See Joe's video 9/11/23 at the 19: 39 timestamp to see where the new duct-banks connect to the mega-vault.

  • @texmexbbq7085
    @texmexbbq7085 24 วันที่ผ่านมา +1

    No significant boring progress... the Boring Co workers are just moving around acting like they're doing meaningful work.

  • @simonbrown4142
    @simonbrown4142 25 วันที่ผ่านมา +1

    No commentary?

    • @DessieDoolan
      @DessieDoolan 25 วันที่ผ่านมา +3

      That would be Joe Tegtmeyer. Video due tomorrow.

  • @michaeljohnson1805
    @michaeljohnson1805 25 วันที่ผ่านมา

    Maybe they need the slab to remove the boring machine

  • @georgelewis8831
    @georgelewis8831 20 วันที่ผ่านมา

    I don’t get it… no voiceover is boring. Even some text would be appreciated.

  • @cesarvalerio4292
    @cesarvalerio4292 3 วันที่ผ่านมา

    Elon is going to be the next Titanic, his ev cars sucks