Dum 3 times by dummber if quantity required is low filling and 2 dumb if required filling is more Ultimately first you need to do embarkment profile clearly
Deep dene se aapka actual level se marked level deep k barabar uper aayega jisse aap sectioning kar k bed ka cutting or filling pata kar sakte hai suppose aap 200 mm ka deep diye hai toh aap k line dori or bed k bich mai 200 mm ka difference aaraha hai toh aap ka bed as per level bana hai agar 200 se jayada ka difference hai toh jitna jyada hai utna filling required hai or jitna Kam rahe ga 200 mm se utna ka cutting required hai...basically subgrade mai 220 ya 230 ka deep lete hai or 200 pe check karte hai cut fill 20. -30 mm extra rakhte hai compaction k liye
iske baad compaction kar k level check karnese bed level mai hai toh thk hai agar down hogaya ho toh aage se 230 ka deep deke banayiye , or ak condition rehta hai ki agar aapko subgrade 10 mm +banana hai toh 230 lekar kaam karye
Sir ji agar kisi ka paas diploma nahi ho aur bo technical ye sara kaam sikh cuka ho aur 2 saal se kisi company ma kaam kar raha ho to use kisi dusri company ma job mil sakti ha
Very meticulously explained. Keep up the good work sir.
Super explaination sir
Very nice video sir.
Badiya pr ek example with given centre aur toe ko bhi btaye
Supub👍👍👍👍 sir
Nyc video brother🤘
Ek 4 lane banane me..kitna Smye lgta h...❤️❤️ Aap bata dijiye
Sir
Khi per filling h khi cutting h
Soil kitni dump kare jo apne proper level per a jaye bed. Level placing karne ke bad
Dum 3 times by dummber if quantity required is low filling and 2 dumb if required filling is more
Ultimately first you need to do embarkment profile clearly
Bhai Jo ae/je ka kaam kya hota h. Ye level sub kuch contractor ka staff karna padega na. Bas Engineer aake check karke jata hi na
Contractor ka engineer ko sab karna par sakta hai agar AAP government engineer ho toh bas check karna hoga
Deep=0.25 ka aur check 0.2 par karenge to jyada plus me aa jayega bed
ha 230 ka deep rakho or 200 pe check karo 20mm compact hoga or 10mm bed plus rahega
Deep kyu dedte he aur line dori se kutting filling kaise cheack karte he😢
Deep dene se aapka actual level se marked level deep k barabar uper aayega jisse aap sectioning kar k bed ka cutting or filling pata kar sakte hai suppose aap 200 mm ka deep diye hai toh aap k line dori or bed k bich mai 200 mm ka difference aaraha hai toh aap ka bed as per level bana hai agar 200 se jayada ka difference hai toh jitna jyada hai utna filling required hai or jitna Kam rahe ga 200 mm se utna ka cutting required hai...basically subgrade mai 220 ya 230 ka deep lete hai or 200 pe check karte hai cut fill 20. -30 mm extra rakhte hai compaction k liye
Sir deep HI ME SE READING MINUS KRNA HOGA na jo reading le eya h wo banda sir????? LEVEL NHI NA SIR ?
Hi - designe level kana hoga jo result aayega us level ko peg pe read kardo level aajayega..
500 mm subgrade hai to kitne layer me dalenge? 2 layer ya 3 layer
max layer thickness 250 ka hota hai toh 2 layer mai v kar sakte hai or 3 mai v
Hi se kitna miens karte hai
in case of subgrade 230mm
Sir 400 pe Laval diya hai kitne pe chek karte hai injiner
Subgrade ka layer hai toh 370-380 pe check karye
Brother offline intranship nahi hai kaa...
Subgrade me 0.22 ya 0.23 ka deep theek rahta
220 ka
or check 200 pe hoga
iske baad compaction kar k level check karnese bed level mai hai toh thk hai agar down hogaya ho toh aage se 230 ka deep deke banayiye , or ak condition rehta hai ki agar aapko subgrade 10 mm +banana hai toh 230 lekar kaam karye
itna zada fill kaha se laaya? Pahar khoda Kya?
Haa
Next video do in English
Sir sir kaha ka project hai
Sir ji agar kisi ka paas diploma nahi ho aur bo technical ye sara kaam sikh cuka ho aur 2 saal se kisi company ma kaam kar raha ho to use kisi dusri company ma job mil sakti ha
Sir ma kudh Kher construction ma kaam kar raha hu 2 saal se isi.company ma.sikha aur ise ma kaam kar raha hu tq for rply sir
@@roadconstructionbypkrajput7060 aapka number kya hai
6396171484
@@sujal7442 6396171484
@@roadconstructionbypkrajput7060 helo Sir
Good job but try using English, thanks
To marking video and BC,WMM.GSC,SUBGAT FULL Fum
Bituminous concrete, wet max macadam , granular sub base , subgrade
Sir calculate karna batana
ky calculation chahiye aapko
HI=RL+BS WHI=HI-0.23 peg marking formula= WHI-design road level
Sir I need a job as a civil engineer
sir, can you please present in English?
sexining nhi sectioning hota h sirji 😂🤣
jee aap sahi ho mai galat hu...
sorry Sir .... i was just kidding... ❤️❤️ ur teaching skills are really awesome...accent doesn't matter in engineering 💞
Bhut hi khrab video
ok