In this video, detailed discussion of #Track Guage Measurement, #Cross Level Measurement, #Superelevation or #Cant Measurement on #Railway track as per #Indian Railways #P.way Manual has been done with its significance, which will be useful for aspirants of UPSC ESE/GATE/PSU's/SSC-JE /State PSC JE/AE exams and #P.way Engineer on Site.
Following content has been discussed in this video:-
#Track Guage Measurement, #Cross Level Measurement, #Superelevation or #Cant Measurement on #Railway track as per #Indian Railways #P.way Manual.
Subscribe my you tube channel for further updates / @yogeshkaushikcivil
Note:-
As per IR P.way Manual,
1. Tolerance in Track Gauge is -3 mm to +5 mm.
E. g . If on a BG track, Guage is 1676 mm then Allowable limit of Gauge is 1673 mm to 1681 mm.
Broad Gauge = 1676 mm
Standard Or Stephenson Gauge = 1435 mm
Meter Gauge = 1000 mm
Narrow Gauge = 762 mm
Light feather Gauge = 610 mm
2. Tolerance in Cross levels is +7 mm to +9 mm.
-ve value is not permitted.
3. Generally Superelevation allowed at curve is 10 mm to 15 mm.
4. Track Gauge & Cross Level shall be measured at every 3 m to 5 m on flat track & at every 10m distance or at every station in case of curved line. But in General Practice, It is measured at every 5-6 Sleepers on flat track.
5. In General, Sleeper Spacing or Sleeper Density is 600 mm to 650 mm. On Level Crossings and Bridge locations, Sleeper spacing is kept to be 550 mm.
6. Cross Level is called as superelevation or cant on curved line.
7. Generally, Track gauge/Cross level/Superelevation/cant measurement shall be started from initial check rail location.
सर आपकी वजह से मेरी बहुत हेल्प हो गई मुझे बस अब यही करना था
Thank you sir isi tarah aur video banaye sir
Thank you sir for great advice.
Keyman , 5G.
Under SSE/PWAY/VNE
Very nice information sir 👍
Great sir
Ultimate 👌🎉
Superalivation main kitne gauge or kitne para hona chaiye or straight line main kitna
If I am not wrong then its a ISGEC project whose client was RVNL and track is present inside the rail coach factory Ganaur,sonipat haryana.......i have made this track formation work from ch-00+00 to ch 2+675.
Yes
Thank you sir 👏👏👏
Cross level maximum kitne Tak chal jayega uske baad packing krwana jruri ho jayega ??? Bataiye please
Thanks sar
Vry nice sir ji
Nice
✌️👍
Permissible limit of XL ????
Iner outer rail kese kahte hai
Cross level +7 mm means ?
Left right rail kese jane
Sir PRC sleeper per standard gauge 1673 mm hai ya 1676 mm
1676
Cross level 7 to 9 mm straight line per permissible hota hai ye kaha likha hai
IR P. way manual
@@YogeshKaushikCivil aisa p.way manual mei kahi nahi likha hai.agar hai tuo edition ,page ,para quote karein.
Check article no. 202 & 404
@@YogeshKaushikCivil
Irpwm 2019 or 2020
@@YogeshKaushikCivil
Para 202 of irpwm 2019 deals with classification of lines and para 404 deals with definitions of terminology of TRANSITIONS,SAFE SPEED andSUPERELEVATION.
None of the two paras deal with cross level on straight line
Ni e
Platform ka hight geuge kese lete h
वैरी यूजफुल वीडियो फॉर ट्रैकमैन
थैंक्स