OMG!! mate i have to say i do enjoy watching some work you do, however this project has you looking really bad these are the steps front wall plate needed a 2nd plate with packers to create the minimum 6 degrees for the panels to sit on front to back, then a barge board on each side the front is a monopitch flashing and the rear should have a drip edge thats under the roof panel never use foam under the panels to give sight all you do is make them all uneven and the room will become damp 100% guarantee water or the roof will become loose
OMG!! mate i have to say i do enjoy watching some work you do, however this project has you looking really bad these are the steps front wall plate needed a 2nd plate with packers to create the minimum 6 degrees for the panels to sit on front to back, then a barge board on each side the front is a monopitch flashing and the rear should have a drip edge thats under the roof panel never use foam under the panels to give sight all you do is make them all uneven and the room will become damp 100% guarantee water or the roof will become loose
Cheers m8 appreciate ur feed back
Walls are plated back and front
Roof is tied into wall plates
Straps over wall plate to tie them down
Roof tied into wall plates with 160 mil screws
Barge boards front and sides
Overhang by 25 mil for drip edges
When I set wall plates on
I layer levelled and made sure they was perfect
this mess onthe outside...glad you didnt fell of these steps ...
Lol since then I've fallen over several times
Gonna clean up and finish of the patio... Will be done soon