Ozzie's OPP-300 Padders near Cederville, NV May 2011 - 006
ฝัง
- เผยแพร่เมื่อ 9 มิ.ย. 2011
- Ozzie's Pipeline Padder OPP-300 Padder model with 1.5" screens padding 42" Natural Gas Transmission Pipeline on the Ruby Pipeline Project near Cederville, NV in May 2011.
- ยานยนต์และพาหนะ
Im so scared of the future....there is literally a machine for ever task iminagable...cant imagine 30 years time no humans needed at all
This is old tech
Looks like good dry material. What happens when it gets into some crap? Sucks that the operator has to watch 2 oposite directions at the same time.
The machine is sifting the rock out of the material and then dumping the sifting material on the pipe. The rocks and other debs are dumped out behind the machine. It would not be able to function effectively in wet material because it would clump up and turn to mud.
excuse me please how can I get like this machine
Es lo mejor para cribar yo tuve la fortuna de trabajar con estas máquinas en bonatti
والله العده والمكنات هيا يلي بتشتغل
Cederville ca
J'aimerais bien aussi travailler comme ça,c'est bien intéressant comme même
Thats a fancy dirty classifier
That cab definitely leaves a lot to be desired, lol
ทำอย่างดี
I was the operatoe
No
You’re ozzie’s
กะว่า200ปี
ไม่ช้ำเลย