Vestas TowerCrane3.wmv

แชร์
ฝัง

ความคิดเห็น • 39

  • @bradleyhuffstetler4794
    @bradleyhuffstetler4794 5 ปีที่แล้ว +3

    I'd imagine that first piece is not too easy to maneuver out of that side panel!

  • @charlieabbot3649
    @charlieabbot3649 4 ปีที่แล้ว

    It's about time somebody thought of that!

  • @alexandruionita5260
    @alexandruionita5260 7 ปีที่แล้ว +1

    Famous V90 3 mw gearboxes. Imagine the costs if they came up with such things

  • @worrat24
    @worrat24 9 ปีที่แล้ว +3

    That's great!!

  • @annttoha
    @annttoha 3 ปีที่แล้ว

    Есть какие-то характеристики этого крана ?

  • @adrianayuso3151
    @adrianayuso3151 ปีที่แล้ว

    Tubiña🔋🔋

  • @Pat21617
    @Pat21617 8 ปีที่แล้ว +3

    What is the capacity of the crane? Those components can't be anything but heavy

    • @marcusnilsson2463
      @marcusnilsson2463 4 ปีที่แล้ว +1

      The gearbox (at least in a Vestas V136) weighs in at 30 metric tonnes. The crane that is already in the nacelle can lift 3 metric tonnes...
      So I am guessing this crane can lift at least 30...

  • @Ilya-baratov563
    @Ilya-baratov563 4 ปีที่แล้ว

    жаль что я в живую не увижу такие технологий

  • @YARCHLRL
    @YARCHLRL 7 ปีที่แล้ว +2

    side load off axis weight would worry me.

  • @BiermeierSchlingensiepenGbR
    @BiermeierSchlingensiepenGbR 8 ปีที่แล้ว +1

    Interesting!

  • @adiade6598
    @adiade6598 4 ปีที่แล้ว

    Excellent

  • @felipepena6891
    @felipepena6891 9 ปีที่แล้ว +3

    HI, you know the VT number? This can be interesting for latam

    • @flemminghojer6834
      @flemminghojer6834 5 ปีที่แล้ว

      i deliever V47 up to V90 world wide - in project from 50 - 300 unit WTG contact me hojer21@gmail.com

  • @coulombicdistortion1814
    @coulombicdistortion1814 5 ปีที่แล้ว +1

    Quite clever.

  • @tmtan1303
    @tmtan1303 3 ปีที่แล้ว

    Cool!

    • @andreiivan2366
      @andreiivan2366 ปีที่แล้ว

      can you send me the video link the one which the original user made of this animation

  • @rotterdamfeyenoord6970
    @rotterdamfeyenoord6970 7 ปีที่แล้ว +1

    Wow

  • @user-bc6cs7xe9q
    @user-bc6cs7xe9q 2 ปีที่แล้ว

    Hello. Can I get the address of a company that specializes in this kind of clean energy.. Thanks

  • @sinenoyoutube
    @sinenoyoutube 4 ปีที่แล้ว

    TEMOS VAGAS

  • @jeroenlubberts8635
    @jeroenlubberts8635 5 ปีที่แล้ว

    cool a vestas windturbine

  • @anilbharti8145
    @anilbharti8145 2 ปีที่แล้ว

    Operations and maintenance infrastructure to get

  • @BB_55
    @BB_55 7 ปีที่แล้ว +1

    I waaant one!!

  • @souravmondal8159
    @souravmondal8159 3 ปีที่แล้ว

    I am working services...

  • @philliplopez8745
    @philliplopez8745 7 ปีที่แล้ว

    why don't they put the heavy shit at the bottom and use a gear box and drive shaft send power down tower

    • @barthsimpson3
      @barthsimpson3 7 ปีที่แล้ว

      Because sending the power down a 100 meter tower is not just expensive, it is also not economic.

    • @philliplopez8745
      @philliplopez8745 7 ปีที่แล้ว

      I don't believe that a modern 90 degree gear box and a drive shafts with a few carrier bearings would consume that much energy if you placed generator in vertical plane at base of tower.

    • @barthsimpson3
      @barthsimpson3 7 ปีที่แล้ว +1

      Every gearing has a efficiency, the more you use the worse it gets in total. There is still the cost factor. It would be very expensive a complicated to build. It is way easier to put everything on top. You need the crane anyway for mounting the blades.

    • @marcusnilsson2463
      @marcusnilsson2463 4 ปีที่แล้ว

      @@philliplopez8745 considering how much the towers move, having an actual drive shaft through the whole tower sounds like a really bad idea. Some Siemens towers (and I am sure other models as well) have a single gear and have the transformers in the bottom....

    • @Niels_f2704
      @Niels_f2704 2 ปีที่แล้ว

      This is why direct drive turbine exist. They don't need a gearbox anymore since it's a high maintenance part.

  • @whendeathdeclareswar7458
    @whendeathdeclareswar7458 4 ปีที่แล้ว

    Over engineering. A simple crane in the windmill itself would do the trick. Send up a teem of men and it will be done in no time.

    • @marcusnilsson2463
      @marcusnilsson2463 4 ปีที่แล้ว

      There already is a crane in at least some of Vestas towers. But considering the gear box weighs in at 30 metric tons and the built in crane (and structure of the nacelle) only lifts 3 metric tons....

    • @whendeathdeclareswar7458
      @whendeathdeclareswar7458 4 ปีที่แล้ว

      Marcus Nilsson build a temporary crane inside the windmill housing and a series of rollers.
      Have the housing built and lifted with a small 5 ton winch to pull up the temporary crane in pieces that will lift the gearbox and generator lower the temp crane for space and roll parts into place. Sounds much easier but an idea.

    • @marcusnilsson2463
      @marcusnilsson2463 4 ปีที่แล้ว

      @@whendeathdeclareswar7458 Not enough room inside, at least not in Sweden, with the elevators and such... I Know the US do not have elevators so might be a bit more space in them =)

  • @hansdonnerborg7153
    @hansdonnerborg7153 3 ปีที่แล้ว

    wind turbines should be taken out of the world.
    so that nature can regain its normal windflow.
    the storms we now are facing is a result of these wind turbine parks.
    regards Radioamateur SM7H

    • @svendhjhus4629
      @svendhjhus4629 2 ปีที่แล้ว

      Easy on the smoking brother !