major lift on Goulbourn Street in Sydney
ฝัง
- เผยแพร่เมื่อ 19 ธ.ค. 2024
- We've just completed a major lift on Goulbourn Street in Sydney. Our team set up a massive 400 tonne all-terrain crane with a 43 metre luffing fly to lift packs of roofing sheeting.
This impressive piece of machinery is designed to handle heavy loads with precision and efficiency, ensuring the safe and effective placement of roofing materials for the project. The operation showcases the power and capability of our equipment and the expertise of our crew.
A big shout out to Borger Traffic for their expert management of traffic control during this complex operation. Their meticulous planning and coordination ensured minimal disruption and maximum safety for all.
Stay tuned for more updates and behind-the-scenes action from other projects!
#CraneLife #SydneyConstruction #HeavyLifting #TeamWork #ConstructionLife #EngineeringExcellence