Borger Cranes
Borger Cranes
  • 22
  • 48 993
major lift on Goulbourn Street in Sydney
We've just completed a major lift on Goulbourn Street in Sydney. Our team set up a massive 400 tonne all-terrain crane with a 43 metre luffing fly to lift packs of roofing sheeting.
This impressive piece of machinery is designed to handle heavy loads with precision and efficiency, ensuring the safe and effective placement of roofing materials for the project. The operation showcases the power and capability of our equipment and the expertise of our crew.
A big shout out to Borger Traffic for their expert management of traffic control during this complex operation. Their meticulous planning and coordination ensured minimal disruption and maximum safety for all.
Stay tuned for more updates and behind-the-scenes action from other projects!
#CraneLife #SydneyConstruction #HeavyLifting #TeamWork #ConstructionLife #EngineeringExcellence
มุมมอง: 28

วีดีโอ

Mastering Heavy Lifts with Skill and Control
มุมมอง 3912 ชั่วโมงที่ผ่านมา
Moving loads that can weigh several tons is no easy task. Crane operators must demonstrate exceptional coordination, skill, and millimeter precision. They expertly control the swing and ensure the perfect trajectory of each load, all within a constrained environment that makes the task even more challenging. #CraneOperators #HeavyLifting #Skills #Precision #Coordination #ChallengingWork #Constr...
Borger Cranes Delivers for Cheltenham’s Croquet Club
มุมมอง 2119 ชั่วโมงที่ผ่านมา
At Borger Cranes, there are no big or small projects. Everyone sees the project as unique. Our driving force is customer satisfaction above everything else. When this small sporting club contacted us to relocate a small building 22 metres from its site in Cheltenham, the whole Borger chain of action was activated. For the community, this was a considerable investment, so we took things very ser...
Setting up its LG1750 to lift a 40-tonne overpass
มุมมอง 263วันที่ผ่านมา
Borger Cranes has used its LG1750 to lift a 40-tonne overpass into position for Queensland's Cross River Rail project at the request of ADCO Constructions the main contractor for Pimpama Station. To complete the lifts, Borger Cranes configured its machine in SL22 with a 56m main boom and 220 tonne counterweight to lift the 38m long overpass. To configure the LG1750, Borger used a 150 tonne Grov...
A height of 129.7m at Coopers Gap Wind Farm
มุมมอง 6314 วันที่ผ่านมา
Wind energy continues to grow in Australia, and now produces 13.4% of total energy generation, according to a report by the Clean Energy Council. This is an important market for Borger Cranes, which is continually investing accordingly, as seen here at the Coopers Gap wind farm in Queensland, where its LTM750T all-terrain was deployed to its full potential, with Superlift, fly jib, and its tele...
We've made Chambers Flat Road, Qld
มุมมอง 7714 วันที่ผ่านมา
SEE Group entrusted Borger Cranes with a massive project: covering a 52 metre long bridge 13 metres above ground level over Norris Creek on Chambers Flat Road, Queensland. We used our LTM 1500-8.1 to lift 90 girders, each weighing almost 26 tonnes. The job was completed in three days thanks to our team: Adam, Stephen, Josh, Steve and Lewis 💪 And according to the provisional timetable, the bridg...
LG1750 - Borger Cranes
มุมมอง 58221 วันที่ผ่านมา
Considerable investment has gone into this Liebherr lattice boom mobile crane, with Borger Cranes now having TWO in its fleet, seamlessly integrating the boom system of the LR 1750 with an eight-axle chassis. This integration provides the flexibility of a crawler crane with the speed and manoeuvrability of an all-terrain mobile crane. The LG1750 is ideal for wind farm construction and large inf...
Borger Cranes - Liebherr LG1750
มุมมอง 11Kปีที่แล้ว
Borger Cranes - Liebherr LG1750
Borger Cranes - Tandem Cranes in Action
มุมมอง 9173 ปีที่แล้ว
Borger Cranes - Tandem Cranes in Action
Lisarow Bridge Build - Borger Cranes
มุมมอง 1.4K3 ปีที่แล้ว
Borger Cranes, Lisarow Bridge Building
Borger Cranes at Sydney Opera House
มุมมอง 3324 ปีที่แล้ว
Borger Cranes at Sydney Opera House
Rooty Hill Railway Station Upgrade
มุมมอง 1.9K5 ปีที่แล้ว
Rooty Hill Railway Station Upgrade
Nepean Hospital Car Park Link Bridge
มุมมอง 1.1K5 ปีที่แล้ว
Nepean Hospital Car Park Link Bridge
Lawrence Bridge Removal Sportsmans Creek
มุมมอง 9715 ปีที่แล้ว
Lawrence Bridge Removal Sportsmans Creek
Seaforth Cresent Crane
มุมมอง 5466 ปีที่แล้ว
Seaforth Cresent Crane
Borgers Harbord Diggers
มุมมอง 1.2K6 ปีที่แล้ว
Borgers Harbord Diggers
Borger Cranes 2018
มุมมอง 8K6 ปีที่แล้ว
Borger Cranes 2018
Aberdeen Bridge Demolition Short V1 0
มุมมอง 6K9 ปีที่แล้ว
Aberdeen Bridge Demolition Short V1 0
Phoenix Street Overpass
มุมมอง 78310 ปีที่แล้ว
Phoenix Street Overpass
Duffs Bridge 10min Shutdown
มุมมอง 12K10 ปีที่แล้ว
Duffs Bridge 10min Shutdown
Auburn Bridge Girder
มุมมอง 60510 ปีที่แล้ว
Auburn Bridge Girder

ความคิดเห็น

  • @TheHungrySlug
    @TheHungrySlug ปีที่แล้ว

    Fun Fact: The Upper Hunter Shire council still use a few of the old concrete road deck pieces to cove a small flood way near the Scone council depot. Pretty cool to see that this was filmed. I watched a fair bit of this in person.

  • @gangstagranpa4855
    @gangstagranpa4855 2 ปีที่แล้ว

    There was this 400 ton borger crane I saw today and the wheels were taller than me

  • @ashok_meena015
    @ashok_meena015 2 ปีที่แล้ว

    Wow technology

  • @psalm18-2
    @psalm18-2 5 ปีที่แล้ว

    Amazing