Rigid Pavement/ PQC National Highways construction

แชร์
ฝัง
  • เผยแพร่เมื่อ 17 ม.ค. 2025

ความคิดเห็น • 244

  • @geetheshbhat
    @geetheshbhat 4 ปีที่แล้ว +3

    This is amazing. Earlier this was done manually and used to take so many days. But now 500-600m happens in few hours

  • @dharmendramaurya1046
    @dharmendramaurya1046 5 ปีที่แล้ว +12

    Highway engineering ka aisa vidio banaye ki koi fresar candidate ko lage ki mere pass experience h. Sadak ke starting point se last tk. Thanks sir

  • @mukeshbisht7250
    @mukeshbisht7250 6 ปีที่แล้ว +3

    Best video about PQC on youtube...

  • @utuberrs2256
    @utuberrs2256 6 ปีที่แล้ว +22

    Nice video Sir ...plz upload more like Practical videos on Roads ,Rly & Bridges and Building with full Engg. facts

  • @mohammadmubashir9942
    @mohammadmubashir9942 5 ปีที่แล้ว +1

    Very good information to

  • @highwayguidecivilwalk
    @highwayguidecivilwalk 6 ปีที่แล้ว +1

    Apka samkhane ka tarika bahut shaandaar hai very nice

  • @omkarVedpathak.
    @omkarVedpathak. 5 ปีที่แล้ว +7

    Very nice information sir
    But some mistakes correction's is
    Like, dowel bar dia- 32mm n length - 450mm n inserted to width distance is 300mm
    In total 10width of road 34 rod's r inserted
    In this video r not told about groove cutting length n widht
    So, as per center line parallel cutting 3.5m left n right side
    As per center line perpendicular cutting 4.5m total length of raod
    N groove cutting depth is 100mm
    N then immediately sealant r filling's in this cutting.
    N only "3 TAI ROD" r inserted in total 10m width
    GSB(Granular Sub- Base):- 200mm width
    DLC(Dry Lean Concrete) :- 150mm
    PQC(Pavement Quality Concrete) :- 300mm

    • @DEofficial88
      @DEofficial88  5 ปีที่แล้ว

      Dear Omkar..as per design nos and all things may be change ...and sealant and filled immediately...please check once Thanks

    • @EducationWithTechnology
      @EducationWithTechnology 3 ปีที่แล้ว

      ​@@DEofficial88 As Per IRC 015;2011 Table 12 Recommended Dimensions of Dowel Bars for Rigid
      Pavements for an Axle Load of 10.2 T
      Slab thickness,
      Diameter, mm Length, mm Spacing, mm
      200 25 450 300
      250 32 450 300
      300 38 500 300
      350 38 500 300

    • @shivam-786
      @shivam-786 ปีที่แล้ว

      Initial & final cutting in pqc kitna hota h ?

  • @shubhamhandargule9891
    @shubhamhandargule9891 6 ปีที่แล้ว +1

    Nice sir ji bahut acche se bataya hai

  • @ashokduraikkannu1876
    @ashokduraikkannu1876 4 ปีที่แล้ว +1

    Very nice vedio & explanation

  • @seelamsaikrishnavlogs
    @seelamsaikrishnavlogs 6 ปีที่แล้ว +3

    Good information about NH way

  • @arifkripak7741
    @arifkripak7741 6 ปีที่แล้ว +1

    thank u sir...samjane ka tareqa accha ha

  • @RakeshSingh-jg2tm
    @RakeshSingh-jg2tm 6 ปีที่แล้ว +1

    very nice vedio

  • @chiragsabalpara4066
    @chiragsabalpara4066 2 ปีที่แล้ว +1

    Nice video

  • @GURPREETSINGH-um1xp
    @GURPREETSINGH-um1xp 4 ปีที่แล้ว

    Best video for freshers

  • @arunkumar-pz4id
    @arunkumar-pz4id 6 ปีที่แล้ว +1

    Very good description for beginners.

  • @sunnysidhu1680
    @sunnysidhu1680 4 ปีที่แล้ว

    NYC video good

  • @IAMGk0.7
    @IAMGk0.7 ปีที่แล้ว +2

    Wow ❤

  • @mohdtariq87
    @mohdtariq87 2 ปีที่แล้ว

    Very Good

  • @mahajan..5299
    @mahajan..5299 6 ปีที่แล้ว +1

    Good.. video..

  • @satendrachaudhary88
    @satendrachaudhary88 5 ปีที่แล้ว

    Most important information thanks

  • @syamalraogandreddi8126
    @syamalraogandreddi8126 5 ปีที่แล้ว +3

    Very good information
    And please do a videos on DLC and which type of density test will do on the PQC and total information of the PQC Thank you sir..

  • @nirajgiri6655
    @nirajgiri6655 4 ปีที่แล้ว +1

    Nice video sir

  • @sandesh3293
    @sandesh3293 6 ปีที่แล้ว +1

    ACCHA VIDEO LOVE FROM KARNATAKA

  • @sahilthorat6988
    @sahilthorat6988 3 ปีที่แล้ว

    nice information sir...🙏❤

  • @shubhamyadav017
    @shubhamyadav017 5 ปีที่แล้ว

    Very good information sir please make this type of video in weekly because I am civil engineer but I am not in practical field that's why I want that type of video thank you for making the type of amazing video

  • @Aditya-lp6ef
    @Aditya-lp6ef 6 ปีที่แล้ว

    nice informative video

  • @arvindk451
    @arvindk451 6 ปีที่แล้ว +1

    Very good explanation and detailed video 👍 Keep uploading new videos like this 😁

  • @arunkumarkarn1995
    @arunkumarkarn1995 4 ปีที่แล้ว +1

    Osm videos

  • @MithleshKumar-xg3tx
    @MithleshKumar-xg3tx 4 ปีที่แล้ว

    Nice 👍 sir g 🙏🙏🙏🙏🙏🙏

  • @amarsamad8495
    @amarsamad8495 ปีที่แล้ว +1

    Sir par squire meter me quring compound kitna liter hona chahiye ? Eska bhi bataiyega

  • @rajabhautambe2344
    @rajabhautambe2344 3 ปีที่แล้ว

    Good

  • @abhilashsonawane6035
    @abhilashsonawane6035 6 ปีที่แล้ว +1

    Nice info sir...

  • @shaikmabu9784
    @shaikmabu9784 6 ปีที่แล้ว +1

    Nice video sar want more information

  • @suraj_khurana
    @suraj_khurana 6 ปีที่แล้ว +1

    Very good video! do keep posting !! good explanation too!

  • @abhiprajapati7315
    @abhiprajapati7315 4 ปีที่แล้ว +2

    Please make a video on How to establish a center line of highway ?

  • @user-ds4kd4eh9q
    @user-ds4kd4eh9q 6 ปีที่แล้ว +1

    Sir aapne PQC KA VIDEO BADIYA BANAYA H

  • @highwayguidecivilwalk
    @highwayguidecivilwalk 6 ปีที่แล้ว +2

    Wow awesome very good information sir keep it up you have been super liked by Civil Engg testing walk

    • @SkMohibul-eu8xn
      @SkMohibul-eu8xn 4 ปีที่แล้ว

      Man power ka Liya call ki jiya 9735523229

  • @SunilSingh-gt2vj
    @SunilSingh-gt2vj 6 ปีที่แล้ว

    Nice video sbbir sir

  • @prakashYadav-kr1rq
    @prakashYadav-kr1rq 5 ปีที่แล้ว

    Aise hi video bnao bhaiya

  • @Gopal_VHP_0050
    @Gopal_VHP_0050 5 ปีที่แล้ว

    Tq for making this video

  • @ArunVerma-li8iq
    @ArunVerma-li8iq 6 ปีที่แล้ว

    Wah lajwab

  • @prasadindi7299
    @prasadindi7299 4 ปีที่แล้ว +3

    How camber and super-elevation is maintained while casting?

    • @Ranjanpatra143
      @Ranjanpatra143 4 ปีที่แล้ว

      Sensor laga h na automatically Mantained

  • @amitchatterjee2737
    @amitchatterjee2737 3 ปีที่แล้ว

    Good video.But I want to seeing full PQC complete video

  • @ankitraturi5333
    @ankitraturi5333 3 ปีที่แล้ว

    Is this delhi mumbai expressway?

  • @mangeshsathe3174
    @mangeshsathe3174 5 ปีที่แล้ว

    Best video

  • @varundevsingh5700
    @varundevsingh5700 6 ปีที่แล้ว +1

    Beautiful

  • @amitshukla3463
    @amitshukla3463 5 ปีที่แล้ว

    Thanks brother

  • @santubanerjee1457
    @santubanerjee1457 3 ปีที่แล้ว +1

    Pqc Kaya RCC hota hai or pcc hota hai????

  • @amazongadgets8677
    @amazongadgets8677 ปีที่แล้ว +1

    very good explanation. but sir, where are the tie bars, how they are inserted by the machine. like dowel bars

  • @dhriteebaroowa2683
    @dhriteebaroowa2683 5 ปีที่แล้ว +2

    what is the difference between fixed form paver and slip form paver ?

  • @anupbhau91
    @anupbhau91 6 ปีที่แล้ว +2

    Nice

  • @aspirantcivilengineers
    @aspirantcivilengineers 4 ปีที่แล้ว

    Nice Explain 👌
    #AspirantCivilEngineers

  • @user-ds4kd4eh9q
    @user-ds4kd4eh9q 6 ปีที่แล้ว +4

    Name of curing compound and it's composition used in PQC curing

  • @vishmaypatel9978
    @vishmaypatel9978 6 ปีที่แล้ว

    expansion joint ke liye groove cut or filling nahi kiya kya ????

  • @RaviKumar-jz8vf
    @RaviKumar-jz8vf 4 ปีที่แล้ว +2

    Pl making RE blocks (small blocks)video with specifications

  • @Laxminarayancosmetics.kuchaman
    @Laxminarayancosmetics.kuchaman 5 ปีที่แล้ว

    v good

  • @maheshverma752
    @maheshverma752 6 ปีที่แล้ว

    Thank s

  • @Sonu.8800yadav
    @Sonu.8800yadav 4 ปีที่แล้ว +1

    Sir millinge machine ke bare me बताओ

  • @ram.hongunti
    @ram.hongunti 6 ปีที่แล้ว

    This construction is in Yadgir rayachur road i think.

  • @DineshKumar-ue3zj
    @DineshKumar-ue3zj 3 ปีที่แล้ว

    Sir pqc machine par kitne lavar lagti hai

  • @ravikushwah9388
    @ravikushwah9388 4 ปีที่แล้ว

    Kiya PQC ke upar se second layear kr sakte hai

  • @MrNalin1234
    @MrNalin1234 4 ปีที่แล้ว +2

    Why Slump was brought by Highwaya....it was supposed to be brought by concrete mixer from Batch mix plant

  • @Psaheb202
    @Psaheb202 4 ปีที่แล้ว

    Bhai subgrade main rad soil hain ?
    CBR Kitna aaya red soil ka ? As per IRC & MORTH ?

  • @user-ds4kd4eh9q
    @user-ds4kd4eh9q 6 ปีที่แล้ว +3

    How to decide how many dowel bar and tie bar is required in PQC LAYING ?

    • @shubhamashtekar7263
      @shubhamashtekar7263 4 ปีที่แล้ว +1

      Dowel bars are provided depending upon their spacing provision (eg. at 300mm c/c spacing)hence- (pavement width divided by spacing) plus 1= no. Of dowel bars

  • @sahiltiwari2104
    @sahiltiwari2104 3 ปีที่แล้ว

    Sir John Aurangabad ka hai kya???

  • @user-ds4kd4eh9q
    @user-ds4kd4eh9q 6 ปีที่แล้ว +3

    What is difference between PQC CURING COMPOUNDS AND curing compound used in kerb making

    • @DEofficial88
      @DEofficial88  6 ปีที่แล้ว

      Types of Concrete Curing Compounds Synthetic resin compound Acrylic compound Wax compound Chlorinated rubber compound Synthetic Resin Concrete Curing Compound

  • @BhupinderSingh-ik1qi
    @BhupinderSingh-ik1qi 3 ปีที่แล้ว +1

    Curing kitna days tak karne hote hai ?

  • @tauseefrazakhan8762
    @tauseefrazakhan8762 4 ปีที่แล้ว

    Pannel cutting kese kiya jata hai aur kitne step me kiya jata hai

  • @ravinayak881
    @ravinayak881 6 ปีที่แล้ว +4

    Sir pls explain.... how many different types of layer of which thickness provided in road construction...?

    • @omkarVedpathak.
      @omkarVedpathak. 5 ปีที่แล้ว +2

      Only four layer's...
      Subgrade :- as per design (filling or cutting)
      GSB(Granular Sub- Base):- 200mm width
      DLC(Dry Lean Concrete) :- 150mm
      PQC(Pavement Quality Concrete) :- 300mm

    • @venkatasrikanth245
      @venkatasrikanth245 5 ปีที่แล้ว

      @@omkarVedpathak. dlc- base layer
      pqc- surface layer
      where is binding layer?

  • @aadilnabiwani2878
    @aadilnabiwani2878 4 ปีที่แล้ว

    Yeh kis jagah pay Road hai

  • @ashutoshrajput895
    @ashutoshrajput895 6 ปีที่แล้ว +1

    Sir calculation batao maan liye lab mae hamara omc 12.40 hai or mdd 1.826 hai or hame site par 100 mtr. length hai or width 25 mtr. Hai tho hamara site par kitna water lage gaa OGL kae bed par.....plz...ogl ki bed ka jankari de ....

    • @Afunfact
      @Afunfact 4 ปีที่แล้ว +2

      1.826 g/cc* 1000= 1826 kg/cm3
      100*25*.15= 375 m3
      1826*375= 684750 kg
      684750*12.4%= 84909 kg
      1 tanker = 12000 kg
      5 % moisture generally borrow area Ki soil me Present rhta h than 12.4-5 = 7.4 % moisture
      Ans is 4 tanker
      Ye badal skta h depend krta h soil me phle se moisture Kitna present h

    • @ashutoshrajput895
      @ashutoshrajput895 4 ปีที่แล้ว +1

      @@Afunfact thank u for reply mae

  • @jaydeeppatel8448
    @jaydeeppatel8448 3 ปีที่แล้ว +1

    Sir 1 km RIGID PAVEMENT bnane k liye kitna cost lagta hai including all layer

  • @kasamkasam549
    @kasamkasam549 3 ปีที่แล้ว +1

    Kon si company ka hi

  • @anikettewary6160
    @anikettewary6160 4 ปีที่แล้ว

    Dowell bar 32mm ka hota hai na bhai

  • @toppotv567
    @toppotv567 2 ปีที่แล้ว

    कौन सा ग्रैड यूज़ कर रहे हैं

  • @vikasdubey2023
    @vikasdubey2023 3 ปีที่แล้ว

    Is it possible that direct final layer of concrete on subgrade

  • @trthemaverick981
    @trthemaverick981 2 ปีที่แล้ว

    Where are the expansion joints sir?

  • @alokhighwayengineering6497
    @alokhighwayengineering6497 6 ปีที่แล้ว +1

    Bhai time mention kiya kro aap ki kab initial cutting krna hai aur kitne der bad final.....cutting ki depth kitni hogi....kitane distance pr hoti h.....dlc ke kitne din bad pqc krna hai.....choti choti bato ko please explain jarur kiya kro

    • @NaveenSharma-fn8pb
      @NaveenSharma-fn8pb 5 ปีที่แล้ว +1

      Alok Singh 7 days bad PQc
      4 hrs bad cutting 30 temp per
      4.5 MTR joint cutting

    • @Afunfact
      @Afunfact 4 ปีที่แล้ว

      After 3 days bhi kr skte h Pqc but after u get 7.5 mpa strength in 3 day's

  • @naveenmishra23
    @naveenmishra23 4 ปีที่แล้ว

    Pqc road me pqc ke thickness se 1/3 bhag cutting kiya jata h or celaynt filling hota hain

  • @biswajitbrahma1395
    @biswajitbrahma1395 4 ปีที่แล้ว

    TCM Opretar sansh melega kiah me TCM Opretar hu

  • @dindayalchouhan9861
    @dindayalchouhan9861 6 ปีที่แล้ว +1

    Sir. Painnel concreting road ke baare me sikhna hai, please give video

  • @EducationWithTechnology
    @EducationWithTechnology 3 ปีที่แล้ว +1

    As Per IRC 015;2011 Table 12 Recommended Dimensions of Dowel Bars for Rigid
    Pavements for an Axle Load of 10.2 T
    Slab thickness,
    Diameter, mm Length, mm Spacing, mm
    200 25 450 300
    250 32 450 300
    300 38 500 300
    350 38 500 300

  • @ranjansharma2754
    @ranjansharma2754 6 ปีที่แล้ว

    Marvellous video sir
    Sir ye kon si company ka work h or kahan kaam ho rha h

  • @RanjanDas-uf2dd
    @RanjanDas-uf2dd 4 ปีที่แล้ว

    Es road kaha par

  • @subratasinhamahapatra4325
    @subratasinhamahapatra4325 5 ปีที่แล้ว

    Learn more from this video.

  • @diptimech4300
    @diptimech4300 6 ปีที่แล้ว +1

    Taksering machine concrete laying kitna time k bat use karte he..

    • @rbsinghjantil4876
      @rbsinghjantil4876 6 ปีที่แล้ว

      After 10 mint you can start

    • @bmn2n
      @bmn2n 6 ปีที่แล้ว

      Ye to concrete ke set hone ke time pr depend hoto hai agr slamp Jada hoga to jada time rukana pdta hai

  • @rajendrakumarkushwahakushw2199
    @rajendrakumarkushwahakushw2199 6 ปีที่แล้ว +1

    Very good video sir kis said ka hai

  • @er.abhijitsingh5272
    @er.abhijitsingh5272 5 ปีที่แล้ว

    thanks for information I too have videoas

  • @sandipdas5443
    @sandipdas5443 6 ปีที่แล้ว +1

    It's our rkjl project.katni section PQC paver

  • @rohitpawar2167
    @rohitpawar2167 6 ปีที่แล้ว +1

    I want to know ki jb hm PQC dal rahe hai to dry hone par hair crack q aa rahe hi plz suggest

    • @surajsaxena1028
      @surajsaxena1028 6 ปีที่แล้ว

      Sir mai up se hu aur civil trade se tree year polytechnic kiya hua hu mujhe construction ka kam sikhna h plz meri help kijiye mera number h 7054529270

    • @omkarVedpathak.
      @omkarVedpathak. 5 ปีที่แล้ว

      Omkarvedpathak018@gmail.com
      Send ur resume on this e-mail..
      Apko all jankari mil jayegi aur job bhi

    • @vipinsaini7492
      @vipinsaini7492 4 ปีที่แล้ว

      Sar aap met sey trai bhi krey ho .

    • @vipinsaini7492
      @vipinsaini7492 4 ปีที่แล้ว

      Hello sir 9760172882 met samprk k liye call kro sir..

    • @vipinsaini7492
      @vipinsaini7492 4 ปีที่แล้ว

      Plant kha par h ye sir..

  • @sharmaeducationcentre6819
    @sharmaeducationcentre6819 4 ปีที่แล้ว

    Curing kyo kya.jata hai.

  • @pradeepkumar-cr8ph
    @pradeepkumar-cr8ph 6 ปีที่แล้ว +1

    sir uske bad asphalt laid kiya jayega

  • @hemrajdas4761
    @hemrajdas4761 6 ปีที่แล้ว +2

    Ji Ha Bhai p. Q. C. Contraction line par cutting करता हूं कि pqc ग्रुप कटिंग

  • @aniketdeshpande1277
    @aniketdeshpande1277 6 ปีที่แล้ว

    Why dowel bar is covered in plastic in half part and half is open?

    • @mohitvijay6110
      @mohitvijay6110 6 ปีที่แล้ว

      For expansion and contraction.

    • @Afunfact
      @Afunfact 4 ปีที่แล้ว

      Jis direction me trafic flow hota h uska Ek side loose chodte h taki dono panels K bich me adjustment Ho ske during vehicle movement

  • @OmprakashYadav-gz7nj
    @OmprakashYadav-gz7nj 5 ปีที่แล้ว

    Kitna miter me kitna mal lagers kase nikale

  • @MayankKumar-es1ii
    @MayankKumar-es1ii 5 ปีที่แล้ว

    Good information sir but fresher ke liye koi job hi nhi dene ke liye taiyar h to students kya kre koi upay h

  • @amarsamad8495
    @amarsamad8495 ปีที่แล้ว +1

    Pqc slump at site 25 to 45

  • @surajsondhiya7165
    @surajsondhiya7165 5 ปีที่แล้ว

    Hello sir kon shi company se ho

  • @engineersadda7486
    @engineersadda7486 5 ปีที่แล้ว

    Ye kaun Si company hai Jo road ka kam kar Rahi hai

  • @shivamdave684
    @shivamdave684 5 ปีที่แล้ว

    Konsa Highway