DMC pile foundation //complete process Explained in Field//Direct mud circulation process
ฝัง
- เผยแพร่เมื่อ 21 ส.ค. 2024
- DMC Piling is the most used method for pile foundation in many civil structures.
Few main types of equipment required for this DMC Piling Process are:-
Winch machine,
Tripod stand,
Terme Pipe
Drill Pipe,
Bentonite, etc.
As the Mud mixed with bentonite clay circulates through the Pile bore, it is called as Direct Mud Circulation Method.
DMC pile foundation //complete process Explained in Field//Direct mud circulation complete process from pile boring to concrete pouring shown here.
For more details Visit
civilfacts.in/...
Watch till the end to know more about DMC piling.
The most important part is concreting process which is shown in the end.
As the main strength of piling is due to concreting, the concrete pouring process in the pile foundation should be done properly.
Contact Civil Facts for any query.
❤
nice video, also mention the helical reinforcement binding details
SURE , I'll share the video soon.
safety is of utmost importance in dmc piling......
please tell the workers to wear helmets as working under the tripod is very dangerous.
I myself have witnessed the tripods to collapse. So it is always advisable to wear helmet and other necessary PPEs.
Your suggestion is highly appreciated sir,
We will surely follow your instructions and use safety Personal protection equipments in working areas.
@@CivilFacts 🙏🙏🙏🙏
Pile kajer khobor nai
Nice
Wow nana
Pile kajer khobor nai
Bobal sir...
th-cam.com/video/JfEuXW97miY/w-d-xo.html
In this video (Construction cost of building) the construction cost required to complete a building construction has been described. All the cost has been considered as per the present market rate in 2021. Area considered for construction cost calculation is 1000 sqft. The construction cost includes material cost , labour cost & etc. During calculation of construction cost of building all aspects has been taken in to consideration.
Dada valo a6o pile kajer khobor nai