Why concrete cube test is carried out? | How to Decide Number of Concrete Cubes to be Tested.
CALL NOW :- 9111001234
Must Watch This Video :- • मैं सिविल इंजीनियरिंग ...
Corporate Training Course:- www.civilguruj....
GURUJI Ka खजाना :- www.civilguruj....
Android App:- play.google.co....
About This Video
In This Video Er. Sudeep Kumar Agrawal, Explaining about Why concrete cube test is carried out? | How to Decide Number of Concrete Cubes to be Tested.
Cube Test of Concrete is one of the most important tests done on concrete. It is also known as a test to determine the Compressive Strength of Concrete. This single test is enough to do a quality check on the type of concreting that is being done at site.
The factors that determine the Compressive Strength of Concrete are Water Cement ratio, Cement Strength, Quality of concrete material and the quality control that is being done during production of concrete.
Steps Involved in Cube Test
The steps involved in conducting the cube test for concrete are -
Cube Test of Concrete is one of the most important tests done on concrete. It is also known as a test to determine the Compressive Strength of Concrete. This single test is enough to do a quality check on the type of concreting that is being done at site.
The factors that determine the Compressive Strength of Concrete are Water Cement ratio, Cement Strength, Quality of concrete material and the quality control that is being done during production of concrete.
The steps involved in conducting the cube test for concrete are -
A cube of 15cmx15 cmx15cm is cast in a cubical mould with aggregate. It is made compact and densely filled so as to avoid any voids.
After 24 hours these cubes are removed from the mould and cured under water. The edges must be smooth before they are inserted in water for curing.
These cube samples are tested after 7 days of curing or after 28 days of curing.
Compression testing machines test the samples by gradually applying load till the specimen fails. At the failing point the compressive strength of Concrete is determined.
Why we use cube,cube Test,cube test,Civil Guruji,CivilGuruji,Civil guru,Why concrete cube test is carried out,How to Decide Number of Concrete Cubes to be Tested,Cube Test procedure,Concrete Cube Testing,number of samples#29,concrete cube samples taken at site,frequency of cube samples taken at site#,number of concrete samples takesn as per is 456 : 2000,Cube test formula#1,Concrete cube test formula,Cube test calculations#1,Compressive test of concrete cube
Why we use cube,cube Test,cube test,Civil Guruji,CivilGuruji,Civil guru,Why concrete cube test is carried out,How to Decide Number of Concrete Cubes to be Tested,Cube Test procedure,Concrete Cube Testing,number of samples#29,concrete cube samples taken at site,frequency of cube samples taken at site#,number of concrete samples takesn as per is 456 : 2000,Cube test formula#1,Concrete cube test formula,Cube test calculations#1,Compressive test of concrete cube
Why we use cube,cube Test,cube test,Civil Guruji,CivilGuruji,Civil guru,Why concrete cube test is carried out,How to Decide Number of Concrete Cubes to be Tested,Cube Test procedure,Concrete Cube Testing,number of samples#29,concrete cube samples taken at site,frequency of cube samples taken at site#,number of concrete samples takesn as per is 456 : 2000,Cube test formula#1,Concrete cube test formula,Cube test calculations#1,Compressive test of concrete cube
Why we use cube,cube Test,cube test,Civil Guruji,CivilGuruji,Civil guru,Why concrete cube test is carried out,How to Decide Number of Concrete Cubes to be Tested,Cube Test procedure,Concrete Cube Testing,number of samples#29,concrete cube samples taken at site,frequency of cube samples taken at site#,number of concrete samples takesn as per is 456 : 2000,Cube test formula#1,Concrete cube test formula,Cube test calculations#1,Compressive test of concrete cube
Why we use cube,cube Test,cube test,Civil Guruji,CivilGuruji,Civil guru,Why concrete cube test is carried out,How to Decide Number of Concrete Cubes to be Tested,Cube Test procedure,Concrete Cube Testing,number of samples#29,concrete cube samples taken at site,frequency of cube samples taken at site#,number of concrete samples takesn as per is 456 : 2000,Cube test formula#1,Concrete cube test formula,Cube test calculations#1,Compressive test of concrete cube
Why we use cube,cube Test,cube test,Civil Guruji,CivilGuruji,Civil guru,Why concrete cube test is carried out,How to Decide Number of Concrete Cubes to be Tested,Cube Test procedure,Concrete Cube Testing,number of samples#29,concrete cube samples taken at site,frequency of cube samples taken at site#,number of concrete samples takesn as per is 456 : 2000,Cube test formula#1,Concrete cube test formula,Cube test calculations#1,Compressive test of concrete cube
Hattsoff sir...super explanation
206=50+50+50+50+6
=4+1+1+1+1=8 number of samples
Thanks , much appreciated feedback.
Perfect Answer 👏
206 m³ = 50+50+50+50+6
Sample = 4+1+1+1+1
= 8 no.of sample
Perfect Answer 👏
Very nice sir n thank you so much
Thanks for your Feedback 🙂
It is done to find numberical value of the strength of the concert...so that we determine whether it is good or not
Sir you are awesome👌
Thank you so much 😀
206=50+50+50+50+6
4+1+1+1+1 =8 No. of samples
👌 perfect
8 No. Of Sample 206m3 Concrete
nice
Thanks
Excellent explanation
Good explanation Sir
For 206 M3 = 8 Nos of samples cube
Correct Answer 👏
260 ke liye 8 sample use hoga sir...
8 cube sample
Which cement is best for structure in South India
Sir 1 video weigh batcher machine p banaye k kaise use krte hai kaise measure kr k aggregate and crush sand dalte hai machine me concreting kr n k liye column and slab purpose k liye
Will take in accounts for further video.
1sample as how many cube taken at site?
Sir daily concrete work ho raha hai to ye daily concrete consumption ho uske hisab se sample lena hai na?
24cubes cast karna hoga sir
Sample -202=8cube
Good
8 set
Sr cube k test to bad m hota h magar concrete K placing to pahle ho jata h agar cube k result sahi nhi aya to jo pahle concreting hoa h ose kya krenge please tell me
Then you will go for NDT's .
Super
8 sample
8 meter cube
Pvc cube mould vs cast iron cube mould which give more strength & How please reply sir
Sir For M10 grade of lean concrete can we have to test compressive strength of concrete reply please immediately
206 cum = 50+50+50+50+6
Sample = 4+1+1+1+1 = 8 no. of samples
Correct Answer 👏
No. Sample =8
Correct Answer👏
heat of foundation kiya hai batayenge plz
👍👏👏
Thanks
Jab ham 28 days k lye test kre phir ketne din tk pani mi rkna chaye
Sir I think we have take 9 cube sample.
8 no.
Correct Answer. 👏
My concrete quantity is 26cum..how many cubes should i cast for 7 and 28 days.?
Frequency of cube ke liye konsa is code use hota hai
Why the concrete cubes are made up cast iron material.
Ek sample mai 3 set hota hai?.....
8 no. Of samples required.
206cum 8 sample
Raipur me cube farma kha mil jaega bhaiaa ji
Sir humko totally basic knowledge chaiye wo video kaha milega sir
Hello Dablu Kumar
Please watch this video 👇
th-cam.com/video/8ovI4oXSwAE/w-d-xo.html
Hope this video will help you.
Sir ji 206m3 me 8sample
Sir kya main Bangladesh se civilguruji access kar sajta hoon..
Ya admission le sakta hoon
Yes you can .
Call on 9111001234 for more information.
Sr bjri ka size kase chak krte ha
Sir 8 sample will be used
206 mcub =50+50+50+50+6=17
It is wrong , Watch the video again and try to solve it again
@@Civil_Guruji ok sir
1 mcube ya concrete ya area
Corporate training ka keya download option nehi ayga??
206 -cub ke liye 8 cub test honge
1 sample = 3 cubes @ 7,14,28 days of curring
1 sample me 6 cubes hoga n 1*6=6
Sir ji ak cube kitne kg hoti hai
204 ke liye 8 sample use hote gai
8 th semple
4+1+1+1+1=8
8 hoga sir
Sir. 0-5,6-15,16-30, Kya h samjh me nahi Aya mujhe
17 sample
It is wrong , Watch the video again and try to solve it again
8 sample sir
12
Watch the video again , special last part.
4+1+1
आपकी कोई बुक बाजार में मिलती है क्या
invented of water kiya hai
8 sample buse honge
8 numbers
For 206cubic meter concrete=50+50+50+50+1+1 i.e.4+4+4+4+1+1=18samples
206 = 4+1+1+1+1
Mai 1 lab tekne sen hu
8nos
Correct Answer.👏
Nahi samjh me aaya hai sir
Which part you are not able to.
Try to solve the problems .
Nahi samjha aaya
samajh me nahi aaya .... aadha mu me hi kha ja rhe hai ap ..
8 sample
8
8 sample
8 sample
7 sample
8 sample
Correct Answer👏
8
8
8
8
8
Correct 👏 Answer
8
Correct answer 👏
8
8 cubes hoga