Lifting over 200,000 tonnes between land and sea
ฝัง
- เผยแพร่เมื่อ 20 ส.ค. 2023
- Mammoet moved 114 offshore wind turbine foundation jackets that were each 95m tall, at Seagreen Offshore Wind Farm in Scotland.
The @TotalEnergies and SSE Renewables project will provide enough energy to power more than 1.6 million homes.
Mammoet's huge PTC210-DS crane halved the amount of time needed to transfer each jacket between land and sea - so the offshore installation vessel was kept busy.
Watch now to find out how we did it!
Read more: mmoet.me/3ICuClX. - วิทยาศาสตร์และเทคโนโลยี
You know how dope it would be if they made a mammoet video game for PC. Like a simulator. I would buy that for sure
Thank you for a longer cut; this feels like a good length to present the project in just the right depth.
Much better than the 1 minute videos.
Good Jobe,,, any time,, MAMMOET,,,
This is just completely mind blowing to see, completely amazing. I LOVE IT.👍👍💪💪
Gone in 15years
Me gustaría ser parte de esta " MEGA COMPAÑIA"👍🇨🇴
Is there a Mammoet ring crane that can lift the same weight range, 1,800 - 2,100 tons, for a hub height point, of 150 - 185 meters, other than 95 - 100 meters as in this case?
👌👌👌😎💪💪💪
Show U S projects that Mammoet are working on now
Hamlet Trương 👷♂Lifting over 200,000 tonnes between land and seai Jacket soaked
Hamlet Trương 👷♂Mammoet's huge PTC210-DS exo crane controlled halved the amount of time needed to transfer each jacket between land and sea - so the offshore installation vessel was kept busy.i Jacket soaked
Sir how much Caren kapesity
5,000t!
Sad that the truly awful "music" suffocates the voice!
1k