PART 21 I GUEST HOUSE CONSTRUCTION I SECOND FLOOR SLAB POURING

แชร์
ฝัง
  • เผยแพร่เมื่อ 29 ก.ย. 2024
  • #housebuildinginthephilippines #retiredandhappyinphilippines
    #construction #LipaCity #Batangas
    For question message us:
    Facebook: / retiredandhappyinph
    Email: retiredandhappyinphilippines@gmail.com
    Mailing Address:
    P.O. Box 43180
    4217 Lipa City
    Batangas ,Philippines

ความคิดเห็น • 9

  • @builtnotboughtmadeinphilip3955
    @builtnotboughtmadeinphilip3955 ปีที่แล้ว +1

    We love Construction gurls. You need the bosses hat when you narrate the progress.

  • @crhistopherpanit8830
    @crhistopherpanit8830 ปีที่แล้ว

    How many sqm..mam

    • @retiredandhappyinphilippin3329
      @retiredandhappyinphilippin3329  ปีที่แล้ว +1

      128 sqm slab

    • @akrumghafoor7539
      @akrumghafoor7539 ปีที่แล้ว

      @@retiredandhappyinphilippin3329 how many guys and how much a day mine is 80 Sq meter ill b pouring in march wen im back in langkaan and per ur show I changed my mind fromm .5 mm to 1 mm thnk u

  • @NinjaKiller1022
    @NinjaKiller1022 ปีที่แล้ว

    Is this a local builder, or are you building through an architectural firm?

    • @retiredandhappyinphilippin3329
      @retiredandhappyinphilippin3329  ปีที่แล้ว +1

      Local foreman!! if you do contractor they charge a lot more and inflate costs and how much materials that are used!! We do everything so no hidden costs and no surprises at the end of the build!!

    • @NinjaKiller1022
      @NinjaKiller1022 ปีที่แล้ว

      @@retiredandhappyinphilippin3329 ah okay, that’s cool. Is the quality great? Or is it not as good? I’m asking because, I don’t want to build something that’s going to fall apart.

    • @georgepiet496
      @georgepiet496 5 หลายเดือนก่อน

      The metal deck needs to be capped at the ends. The inefficiency is amazing. Aggregate being put into bags. Use a wheelbarrow.

  • @petermcgreevy6386
    @petermcgreevy6386 ปีที่แล้ว

    The new labourer moving the bags........🤣