ขนาดวิดีโอ: 1280 X 720853 X 480640 X 360
แสดงแผงควบคุมโปรแกรมเล่น
เล่นอัตโนมัติ
เล่นใหม่
I just did an install, and I wish I came across your video first because it shows a great amount of insight to an installation. The one thing I did was move the inline fuse for the power supply to the screen, back near the black box for easy access.
easy access is key!!
Great Video! Definitely need this as I’m installing my live scope this weekend
Sweet!
Great work!
Thanks!
Awesome vid 👍🏻😎
Thanks 👍 I’m not the best at instructional but I tried 🤣
Do you not mount the transducer that came with the 126sv? Or is that the transducer that was mounted to bottom of trolling motor.
Hey just a pointer mount the black box the other way so water can’t get in through the connectors
Correct! A lot of the installs after this… I started to mount them that way! Thanks!
Do you have any links for the fuse block and cut off switch and wire?
Fuse block: a.co/d/fHsQKfpCut off switch: a.co/d/9JLxtDrWire: a.co/d/cb92oA8
I just did an install, and I wish I came across your video first because it shows a great amount of insight to an installation. The one thing I did was move the inline fuse for the power supply to the screen, back near the black box for easy access.
easy access is key!!
Great Video! Definitely need this as I’m installing my live scope this weekend
Sweet!
Great work!
Thanks!
Awesome vid 👍🏻😎
Thanks 👍 I’m not the best at instructional but I tried 🤣
Do you not mount the transducer that came with the 126sv? Or is that the transducer that was mounted to bottom of trolling motor.
Hey just a pointer mount the black box the other way so water can’t get in through the connectors
Correct! A lot of the installs after this… I started to mount them that way! Thanks!
Do you have any links for the fuse block and cut off switch and wire?
Fuse block: a.co/d/fHsQKfp
Cut off switch: a.co/d/9JLxtDr
Wire: a.co/d/cb92oA8