NYMR Carriage Stable Time Lapse - Yorkshire's Magnificent Journey

แชร์
ฝัง
  • เผยแพร่เมื่อ 27 ธ.ค. 2024

ความคิดเห็น •

  • @Andrewjg_89
    @Andrewjg_89 3 ปีที่แล้ว +13

    I never been on the North Yorkshire Moors Railway. But this looks incredible. Great work👍💚

    • @NYMR
      @NYMR  2 ปีที่แล้ว +1

      Thank you Andrew

  • @andrewmacpherson706
    @andrewmacpherson706 2 ปีที่แล้ว

    I built this, proud as punch, the best job ever

  • @xylicable
    @xylicable 3 ปีที่แล้ว +4

    Wonderful time lapse of the construction. Looks like a great facility for making it easier to look after your wonderful fleet of rolling stock by your brilliant people.

  • @alantoms3263
    @alantoms3263 3 ปีที่แล้ว +12

    Great presentation using time-lapse photography.
    I'm getting old, and whilst I admire the initiative to prepare this, which helps protect the rolling stock, my first reaction was remorse seeing nice 'virgin territory' ripped up and built on.
    It got better as half of it wasn't used and 'became green' again, as the grass grew back - or was planted.
    Nice project and glad its reached completion for 2022.
    Al.

    • @NYMR
      @NYMR  2 ปีที่แล้ว

      Thanks for commenting on the time lapse video. We are glad you enjoyed it. When we planned the scheme, we explored every possible site along the whole 18 miles of railway. We wanted something that was as unobtrusive as possible, was on land that we could acquire (because we have more or less no ‘spare’ land in our ownership) and was operationally in the right place. In the end we found the one available piece of land beside the short length of line at Pickering that is outside the National Park boundary. There simply is no brownfield land beside the railway. We worked closely with the local planning authority to minimise the impact of the building, whilst keeping it as large as possible. It’s not meant to be a lock-up garage, the partially open sides keep the rain off but allow ventilation and all the servicing facilities, pits, power etc are there to help the team do their job. The green area is designed to hold water when the valley floods, eliminating any increased flooding risk in Pickering town.

  • @lawrencelewis2592
    @lawrencelewis2592 2 ปีที่แล้ว

    Great video- Yorkshiremen don't screw around!

  • @gazzab3224
    @gazzab3224 3 ปีที่แล้ว +1

    We are going to Yorkshire for a holiday in May, we hope to visit the NYMR while there, can't wait . Love the video.

  • @mfellphotography2118
    @mfellphotography2118 3 ปีที่แล้ว +10

    Congrats on the build being completed, looks amazing and I can’t wait to be back up there in the new year to see it

  • @mickboakes7023
    @mickboakes7023 3 ปีที่แล้ว +8

    That’s one amazing building. Well done, good luck to you all. Happy New Year, let’s hope it’s going to be. Fingers crossed. Mick.🇬🇧

  • @linesided
    @linesided 3 ปีที่แล้ว +3

    Amazing and congrats on having such deep pockets for this great cause!

  • @Senna-xi1gr
    @Senna-xi1gr 3 ปีที่แล้ว +1

    Fantastic 👍🇬🇧

  • @dan-cg3lh
    @dan-cg3lh 3 ปีที่แล้ว +1

    I was on one of the trains while it was being built

  • @alistairscott137
    @alistairscott137 3 ปีที่แล้ว +1

    Great News , looking good.

  • @HaydnsRailways3205
    @HaydnsRailways3205 3 ปีที่แล้ว +6

    Amazing it's absolutely massive at least all of you carrages wont be stored outside

  • @davidrawles5732
    @davidrawles5732 2 ปีที่แล้ว

    fantastic!!!!

  • @trainboylouis
    @trainboylouis 2 ปีที่แล้ว

    1:49 TORNADO YAYA must have been at the annual steam gala i went to

  • @TheMrduuk
    @TheMrduuk 3 ปีที่แล้ว +5

    One of the bestbthings to be built on nymr now Gresley can be saved from elements love to support when I can superb railway hope uget thru this virus farce soon

  • @ModelRailwayNews
    @ModelRailwayNews 3 ปีที่แล้ว +5

    Nice time lapse!

    • @NYMR
      @NYMR  3 ปีที่แล้ว

      Thanks!

  • @mt14l
    @mt14l 3 ปีที่แล้ว

    Congrats guys - brilliant stuff

  • @fazermanbill
    @fazermanbill 3 ปีที่แล้ว +1

    Awesome time lapse, Happy New year to you all.

  • @stevenkitching4866
    @stevenkitching4866 3 ปีที่แล้ว +1

    wow, looks excellent. will make the engineers life's easier. Merry Christmas to you all

  • @TABRO284
    @TABRO284 3 ปีที่แล้ว +1

    fantastic

  • @willnewton3051
    @willnewton3051 3 ปีที่แล้ว +5

    Will there be a path to the public can veiw it like at grosmont?

  • @kaiserwilhelmiii50
    @kaiserwilhelmiii50 3 ปีที่แล้ว +6

    Blimey it is massive

    • @Pesmog
      @Pesmog 3 ปีที่แล้ว +3

      Aye, heritage railways in the UK are getting quite good at these big projects.

    • @kaiserwilhelmiii50
      @kaiserwilhelmiii50 3 ปีที่แล้ว +3

      @@Pesmog indeed, the heritage railways have better infrastructure than the proper lines

  • @johnrees
    @johnrees 3 ปีที่แล้ว +1

    Fantastic .... well done all ..... hope to see you all again in 2022 when i`m next up north for me holiday ..... ps make sure you`ve got plenty of those hot sausage rolls in the Grosmont buffet .... Mnmnm

  • @AndreA-ke2id
    @AndreA-ke2id 3 ปีที่แล้ว +2

    I was just wondering why it's not fully enclosed or at least at the sides. Not exactly full protection from the elements ??

    • @NYMR
      @NYMR  2 ปีที่แล้ว +1

      Thanks for commenting on the time lapse video. We are glad you enjoyed it. When we planned the scheme, we explored every possible site along the whole 18 miles of railway. We wanted something that was as unobtrusive as possible, was on land that we could acquire (because we have more or less no ‘spare’ land in our ownership) and was operationally in the right place. In the end we found the one available piece of land beside the short length of line at Pickering that is outside the National Park boundary. There simply is no brownfield land beside the railway. We worked closely with the local planning authority to minimise the impact of the building, whilst keeping it as large as possible. It’s not meant to be a lock-up garage, the partially open sides keep the rain off but allow ventilation and all the servicing facilities, pits, power etc are there to help the team do their job. The green area is designed to hold water when the valley floods, eliminating any increased flooding risk in Pickering town.

  • @chrispollard6568
    @chrispollard6568 3 ปีที่แล้ว +1

    Apparently it rains there!

  • @MrPElms
    @MrPElms 3 ปีที่แล้ว +2

    Why did it have to be a green field site ?

    • @isctony
      @isctony 3 ปีที่แล้ว

      location location location

    • @NYMR
      @NYMR  2 ปีที่แล้ว

      Thanks for commenting on the time lapse video. We are glad you enjoyed it. When we planned the scheme, we explored every possible site along the whole 18 miles of railway. We wanted something that was as unobtrusive as possible, was on land that we could acquire (because we have more or less no ‘spare’ land in our ownership) and was operationally in the right place. In the end we found the one available piece of land beside the short length of line at Pickering that is outside the National Park boundary. There simply is no brownfield land beside the railway. We worked closely with the local planning authority to minimise the impact of the building, whilst keeping it as large as possible. It’s not meant to be a lock-up garage, the partially open sides keep the rain off but allow ventilation and all the servicing facilities, pits, power etc are there to help the team do their job. The green area is designed to hold water when the valley floods, eliminating any increased flooding risk in Pickering town.

  • @ab_railways_original
    @ab_railways_original 3 ปีที่แล้ว +3

    Hello Nymr if you’re are wondering I live at the staition before Pickering not saying that location so people can’t easily track me down but it is me the Staition Master’s son

  • @michaelhibbert4393
    @michaelhibbert4393 3 ปีที่แล้ว

    Wow….fantastic

  • @theempirestrikesback2939
    @theempirestrikesback2939 3 ปีที่แล้ว +1

    Which amount was EU funded?

    • @1chish
      @1chish 3 ปีที่แล้ว +1

      I believe some of it was along with the National Lottery but why do you ask?

    • @theempirestrikesback2939
      @theempirestrikesback2939 3 ปีที่แล้ว +1

      @@1chish The website mentions funding of the European agricultural fund for rural development. I am interested in the height of support that heritage line received from the EU that will in the future be obsolete.

    • @1chish
      @1chish 3 ปีที่แล้ว +4

      @@theempirestrikesback2939 I guessed there was some ulterior reason. But you are wrong. The UK has replaced that EU agricultural funding with its own fund.
      Of course the money the EU 'gave' to the UK was money the UK had paid to the EU in the first place. I was always mystified why some people couldn't understand that simple fact.
      North Yorkshire Moors Railway was awarded £1.9million as part of the Government’s £1.57 billion Culture Recovery Fund to help the organisation survive the financial challenges caused by the Covid-19 crisis.

    • @darren25061965
      @darren25061965 3 ปีที่แล้ว +3

      I believe it was a jar of French branded coffee, surplus to requirements when the EU moved its entire commision from Brussels to Strasbourg for 2 weeks, as it does once every year to appease the French.

    • @theempirestrikesback2939
      @theempirestrikesback2939 3 ปีที่แล้ว +4

      @@darren25061965 Are there a lot of Brexiteers on the NYMR spreading such senseless alternative facts ?

  • @stephensmith799
    @stephensmith799 3 ปีที่แล้ว +3

    Good to see EU benefits made clear👍

  • @raycasey6264
    @raycasey6264 3 ปีที่แล้ว +4

    Made possible with EU funding.

  • @railwaymechanicalengineer4587
    @railwaymechanicalengineer4587 หลายเดือนก่อน

    HORSES FOR COURSES ????
    So in Yorkshire they have horse STABLES for their horse drawn ? carriages !!!!
    I think they mean a "Carriage shed", the traditional railway term for a covered building for carriages !!!

  • @blairoutproject
    @blairoutproject 3 ปีที่แล้ว +1

    yet they can't even keep their small section of the Mill race clear, leaving other properties at the risk of being flooded...

    • @nw5835
      @nw5835 3 ปีที่แล้ว +1

      ....sour grapes.

  • @timwebster8122
    @timwebster8122 3 ปีที่แล้ว +4

    Whilst I'm a supporter of the railway and understand the need for this facility I feel it's such a shame about the location. Pity it couldn't be built somewhere less obtrusive. It has changed the look of this part of the valley for the worse.

    • @jamescollins3647
      @jamescollins3647 3 ปีที่แล้ว +9

      Your house probably makes that part of the country look worse than before it was built.

    • @NYMR
      @NYMR  2 ปีที่แล้ว +2

      Thanks for commenting on the time lapse video. We are glad you enjoyed it. When we planned the scheme, we explored every possible site along the whole 18 miles of railway. We wanted something that was as unobtrusive as possible, was on land that we could acquire (because we have more or less no ‘spare’ land in our ownership) and was operationally in the right place. In the end we found the one available piece of land beside the short length of line at Pickering that is outside the National Park boundary. There simply is no brownfield land beside the railway. We worked closely with the local planning authority to minimise the impact of the building, whilst keeping it as large as possible. It’s not meant to be a lock-up garage, the partially open sides keep the rain off but allow ventilation and all the servicing facilities, pits, power etc are there to help the team do their job. The green area is designed to hold water when the valley floods, eliminating any increased flooding risk in Pickering town.

    • @jamescollins3647
      @jamescollins3647 2 ปีที่แล้ว +1

      @@NYMR You did a very good job, well done.

    • @paulcaswell2813
      @paulcaswell2813 ปีที่แล้ว +1

      I couldn't believe that the NYM, part of the 'heritage' business as much as the National Trust, was allowed to rip up virgin land. What on earth happened to building regulations???

  • @steffenrosmus9177
    @steffenrosmus9177 3 ปีที่แล้ว +6

    Proudly financed by the EU (45%). And now happy Brexit.

    • @BenDover-ln6ns
      @BenDover-ln6ns 3 ปีที่แล้ว +2

      We voted to leave. Get over it.

    • @xylicable
      @xylicable 3 ปีที่แล้ว +2

      @@BenDover-ln6ns Which doesn't look like was a good idea...

    • @BenDover-ln6ns
      @BenDover-ln6ns 3 ปีที่แล้ว +2

      @@xylicable democracy

    • @xylicable
      @xylicable 3 ปีที่แล้ว +1

      @@BenDover-ln6ns Democracy: doesn’t make it a good idea? Democracy: manipulated by well moneyed people who perpetuated lies to get a decision to suit their own interests? Democracy: you are allowed to change your mind based on new information?

    • @peterbrownless
      @peterbrownless 3 ปีที่แล้ว +1

      ...as Britain was a net giver to the EU this was effectively part financed by the British people, not the undemocratic dictators in Brussels.

  • @jammiedodger7040
    @jammiedodger7040 3 ปีที่แล้ว +2

    They should not modify coaches if they need a disabled coach use a new coach

    • @xylicable
      @xylicable 3 ปีที่แล้ว +3

      Have you considered how modifications to non unique vehicles can improve the patron experience to enjoy a day out at the railway? As in the rest of life, one has to sometime compromise. Mods have to be considered very carefully in the context of the overall objective: preserving and operating heritage railway for members of the public to enjoy. Your approach would not only discriminate, be detrimental to a wide group of people but is plain daft. Would you also apply this logic to not fitting toilet retention tanks?

    • @jammiedodger7040
      @jammiedodger7040 3 ปีที่แล้ว +1

      @@xylicable The coaches should be kept in the original state the same as how they were built and just build new replica coaches

    • @MajesticTrains
      @MajesticTrains 3 ปีที่แล้ว +4

      There's hundreds of MK1s left knocking around, really doesn't matter if a few are converted for wheelchair access. Better for everyone to experience it in my opinion.

    • @xylicable
      @xylicable 3 ปีที่แล้ว +3

      @@jammiedodger7040 Restoring old vehicles to as built condition - what does this mean? In practice rolling stock went through modification throughout its operating life. Examples: pictures/ads in carriages, change of livery, replacement seat moquette, lights, carpet, handles, wheelsets, suspension components, bogies etc.
      They were adapted to do their job as their job changed throughout their lives and in preservation some lost features are restored, some are not and new ones added. Even vehicles in the NRM are not going to be exactly as they were built. Specialist restorations probably closest (Stately trains, LNER Beaver Tail) but these are for special and probably unique examples and more likely restored to a configuration supported by available evidence and materials to do so.
      Aside from the falsity of getting to as built condition, one has to weigh up the practicalities of such “purity” - the cost and effort of doing the restoration to that level vs. The benefits to the vehicle’s continued life and usefulness on an operating railway? Doing so for something really special - LNER Beaver Tail -> YES! But does it really matter that a MK1 is not absolutely as it was in 1951 in Derby? Does it destroy the illusion that is preservation? No. And for your particular gripe not having improvements for disability access is discriminatory and unhelpful to passengers/staff/the railway.
      Building new carriages - well if railways could afford it, maybe they would (Ffestiniog Welsh Highland), I’m sure Bombardier/CAF/Alstom would love it!