Porur - Vadapalani | போரூர் - வடபழனி | chennai metro phase 2, corridor 4 work Update
ฝัง
- เผยแพร่เมื่อ 12 ก.ย. 2024
- Chennai Metro Phase 2 Corridor 4 stretch from Porur to Vadapalani on the lighthouse to poonamallee bypass route. Latest Update
In this stretch, a grand double decker bridge is being built with 5 tracks on a single pillar at one place.
#chennaimetro # doubledeckerbridge #vadaplanimetro #porurmetro #cmrl
#metrotrains #poonamallee #lighthouse
தற்பொழுது பட்டாபிராம் இல் ஐடி பார்க் அமைய உள்ளது, விரைவில் கோயம்பேட்டில் இருந்து அண்ணாநகர் மேற்கு, பாடி, அம்பத்தூர், ஆவடி, பட்டாபிராம் வழியாக திருநின்றவூர் வரை மெட்ரோ இரயில் திட்டம் செய்யல்படுதபடும் என்று நினைக்கிறேன்.
Good update congratulations. Pls update Madipakkam to Medavakkam metro & Tambaram railway station upgrade work and Kilambakkam new railway station works. All above works are going full speed.
sure. will do it. Thank you.🙏😃
Super info about cross-over first time hearing this.. need drone videos as well try to give us😊
Sure. i will do it. i need your support for that. 😍Keep watching.Thanks 🙏😃
Very tough tedious construction. May be the entire construction till will be completed by mid of 2027....
Good coverage ❤👍 ! I would like to convey one point. All news channels are saying from alapakkam to alwarthirunagar double decker metro line. But that goes till virugambakkam i mean further beyond alwarthirunagar and goes till inox theatre and finally corridor 5 take a left turn penetrate via virugambakkam kaliamman market road towrds koyamedu and thirumangalam.
Yes. Virugampakkam Market Road is where corridor 4 and corridor 5 meets
What i do not understand is why double decker is needed ... If two seperate tracks are used more area can be covered by metro ...
Same one pillar Bridge and metro ..from MIOT hospital to porur saravana stores ..
yes. but. top level metro train and bottom level for vehicles.
Tq for updated
Thank you.🙏😃
Good work @City breeze,
2 things that runs in my mind,
1, How the 5 track on a single pillar will look like !
2, in the Vadapalani intersection the pillars height is looking small, will the track goes between the road and the old metro line ?
At the top of vadapalani metro. Phase 2 corridor 4 will pass using steel bridge. And goes to Kodambakkam power house.
And double decker pillars are very dense which can handle 4 trains at a time like alandur metro
Correct.👍
I am staying in porur this motro near
Great.😃
Thanks anna ❤️❤️❤️❤️
Thank you. 🙏
👍👍
Thank you.🙏
❣
Thank you.🙏
❤
Thank you. 🙏
How they will cross the pase 2 metro route??😮
Intersting one🎉
Yes. Thank you.🙏
Already using in Bangalore 😂😂
five tracks in one pillar?
NO Bangalore is not Double decker Metro its double decker Flyover and other is metro..This is fulll Metro on two floors.Also metro is going to go inside 12 Storey building and Mylapore will have 100ft deep station which is all first in India...Good Chennai coming back to numero uno in South again slowly aferr 80's