Solitude Moonbeam Express

แชร์
ฝัง
  • เผยแพร่เมื่อ 10 ก.พ. 2025
  • Moonbeam was built in 2008 by Doppelmayr CTEC replacing a fixed-grip quad of the same manufacturer that lasted only a few years from 2005-2008, then moved to indirectly replace Powderhorn in a new alignment as Powderhorn II. That quad replaced a thiokol triple chair respectively. Moonbeam serves mainly beginner and intermediate terrain as well as the Roundhouse restaurant. This lift is relatively short for a D-CTEC lift but appropriate for its purpose. It is gonna last a very long time I know it.
    Capacity: 2,200 per hour
    Ride Time: 3.5 minutes
    Vertical Rise: 649 ft
    Length: 2,868 ft
    Towers: 11
    Carriers: 64
    Design Speed: 1,000 fpm
    Speed day of recording: 800 fpm
    Filmed December 21st, 2024

ความคิดเห็น •