Solitude Moonbeam Express
ฝัง
- เผยแพร่เมื่อ 10 ก.พ. 2025
- Moonbeam was built in 2008 by Doppelmayr CTEC replacing a fixed-grip quad of the same manufacturer that lasted only a few years from 2005-2008, then moved to indirectly replace Powderhorn in a new alignment as Powderhorn II. That quad replaced a thiokol triple chair respectively. Moonbeam serves mainly beginner and intermediate terrain as well as the Roundhouse restaurant. This lift is relatively short for a D-CTEC lift but appropriate for its purpose. It is gonna last a very long time I know it.
Capacity: 2,200 per hour
Ride Time: 3.5 minutes
Vertical Rise: 649 ft
Length: 2,868 ft
Towers: 11
Carriers: 64
Design Speed: 1,000 fpm
Speed day of recording: 800 fpm
Filmed December 21st, 2024