Edge EAS EGT Installation 05 Duramax LLY

แชร์
ฝัง
  • เผยแพร่เมื่อ 27 ส.ค. 2024
  • Some video showing the install of the Edge EAS EGT Pyrometer in the passenger side exhaust manifold of my 2005 Chevrolet Silerado 2500HD with a 6.6L Duramax LLY.
    Basic steps:
    1. Jack the truck
    2. Remove right front tire
    3. Remove fender/wheel well
    4. Identify the flat spot on the manifold
    5. Center punch the manifold
    6. Drill 1/8" hole in manifold, keep drill bit cool (WD-40 works)
    7. Drill 21/64" hole, expanding size of previous hole
    8. Tap threads using 1/8"-27NPT tap
    9. Remove all metal shavings from manifold and around hole using a pencil magnet
    10. Install probe nut
    11. Install probe
    12. Route wire
    13. Route wire through firewall boot
    14. Plug into Edge Evolution CS/CTS unit
    15. Ensure cable is tied up
    16. Pick up/clean tools, throw away trash
    17. Bring engine up to operating temp at idle, check EGT levels.
    Tools: 14mm wrench, drill, 1/8" drill bit, 21/64" drill bit, 1/8"-27NPT tap, pencil magnets, hammer, center punch, flat tip screwdriver, jack, jack stand, lug wrench, scissors.

ความคิดเห็น • 3

  • @RossRinSD
    @RossRinSD 9 ปีที่แล้ว +4

    Thanks, that makes it look easier than I thought it would be. Of course the fun part is worrying about making sure I get all the metal filings out of the manifold.

  • @Destiny-tg8mo
    @Destiny-tg8mo 6 ปีที่แล้ว

    Good video it was unnerving drilling a hole in my Duramaxs manifold .I was debating where to run the egt cable to the Edge CS head I'm going the some route you did .Thanks

  • @tommymadux3646
    @tommymadux3646 3 ปีที่แล้ว

    Don’t run the wire through the door jam and into you door boot like that. It will leak if it gets wet enough. Go through the fire wall correctly. There’s a boot that is easier to run through that’s next to the one you were trying to.