What are the Inspection Checklist for Brickwork | Site Supervision Tips! || By Civil Guruji

แชร์
ฝัง
  • เผยแพร่เมื่อ 6 เม.ย. 2021
  • #CivilPracticalSiteTraining #CivilGuruji #CivilEngineersTrainingInstitute
    Link For Checklist of Brickwork :- drive.google.com/file/d/1j6SL...
    Like Share & Subscribe
    Book Your Seat, Limited Seat Left
    Registration Open Call :- 9111001234
    Practical Training Detail:- • Practical Site Trainin...
    Register Now and Pay Later:- www.civilguruji.com/s/store/c...
    Download Details:- tiny.cc/Download-Course
    Branch Address :
    1. DELHI - NCR
    Civil Guruji - 25, gate no. 1,
    behind kailash hospital
    knowledge park -1 Greater noida
    (201308)
    2. BHOPAL
    Civil Guruji :- at Hind convent school
    Naveen Nagar, Bhopal, Madhya
    Pradesh 462010
    3. LUCKNOW
    Civil Guruji :- at Prayag public
    school Sandaulli Umarpur ,Near
    Juggaur railway station road,
    Lucknow 225003
    About This Video
    Er. Mayank Singh is Discussing about Pre & Post Checklist of Brickwork
    Before laying the first layer of bricks clean the entire floor. Stack the bricks properly instead of throwing them on slab. 2) In case of clay bricks, bricks should be soaked in water before start of work . 3) Check the mix proportion of mortar. 3) Lay the first layer of bricks considering the diagonals and dimensions of the room. 4) Check the level and right angles at the corner for the first layer. For external walls, check the plumb from external side of the beam. For internal walls check the plumb from the beam edge depending on which side the wall is flushing the beam. 5) Provide door openings at the first level and window openings at sill level as per working drawings. 6) Check customer changes if any in brickwork. 7) Brickwork should not be done more than 4ft in a day. 8) All the joints should be uniform and not exceeding 10 to 12mm. 9) Over burnt/under burnt clay bricks should not be used. 10) All the vertical and horizontal joints should be properly filled and racked. 11) If readymade door frames are to be fixed along with brickwork, they should be checked for plumb and level and should be properly fixed with holdfasts in concreting . 12) R.C.C bands with nominal steel shall be provided at 5 ft height for 4” brickwork. And also for 6” brickwork if it is exceeding 10ft height. 13) Gap between top layer of brickwork and beam bottom shall be filled with ¾” metal with mortar. 14) The brickwork surface should be cleaned with jute bag at the end of day work. 15) All the layers should be laid in line and plumb. Level of the brickwork should be checked after each 5 to 6 layers and should be adjusted in mortar if required. 16) Curing should be done for 7 to 10 days. 17) Thin mortar should be applied to the column where the brickwork would be touching the column. 18) If adjacent walls are not to be raised simultaneously, then pin bricks should be left every alternate layers as to have bonding/interlocking between the walls. structural system in which the bricks are placed in a systematic manner and the joints are filled by the mortar to form a solid structure is termed as Brick masonry. It is generally used in walls and buildings. These Brick Masonry structures are used as both load bearing and non-load bearing walls.The brick masonry a key component in the construction of Houses, Buildings and compound walls. It is very important to construct Brick Masonry in a quality manner to ensure the loads bearing capacity, durability and stability. The quality of Brick Masonry can be ensured by proper workmanship and good inspection. In order to attain a good workmanship in Brick Masonry, the Site Engineer or Supervisor must observe the following aspects during the construction of Brick Masonry. Soaking of the Bricks Maintain the wet surface area of the brickwork Proper Horizontal first bed course Proper Mortar mix proportions Proper Lap and Vertical Joints Sprit level and Plumb-bob checking’s Raking Joints of the Brick Masonry Curing of the Brick masonrySoaking of the Bricks:Soaking of bricks was a very important activity and contributes to strength of the Brick Masonry. When Bricks are soaked into the clean water, it gets saturated, and the air particles, dust & dirt are removed. When we use these soaked Bricks it will not absorb the water from Mortar and enough strength from Mortar is obtained. Generally, the soaking period of the bricks is 12 hours.However, in modern-day constructions and big building constructions, the soaking huge amount of Bricks was not possible. In this case, water was sprayed over the Bricks and it shall be done for the period of 5 to 8 hours.Moreover, if the brick is neither soaked or water sprayed before placing of the Bricks in Brick Masonry, it leads to absorption of the water from Mortar and the Mortar will not have enough water to complete hydration. This prevents the Mortar to obtain its full strength.
  • วิทยาศาสตร์และเทคโนโลยี

ความคิดเห็น • 38

  • @ParveenKhatak-
    @ParveenKhatak- 7 หลายเดือนก่อน +1

    ❤❤sir ji aapke shamjane ka trika very very nice ❤️❤️🙏🙏 thanks civil guruji 🙏🙏🙏🙏

    • @Civil_Guruji
      @Civil_Guruji  7 หลายเดือนก่อน

      Thank you very much for your Love and Support . I appreciate your expression of support and goodwill. Let us continue to learn and share knowledge together.

  • @souviksarkar3045
    @souviksarkar3045 ปีที่แล้ว

    Very Informative

  • @MANTRASBHAKTISAGAR
    @MANTRASBHAKTISAGAR 2 ปีที่แล้ว +1

    vey useful sir👍

  • @hikikomorihachiman7491
    @hikikomorihachiman7491 ปีที่แล้ว

    Sir, is there a necessity to check the horizontal level of each layers of the brick with dori or spirit level?
    My Mistiri was making some of the layers 5 to 10 degree from horizontal base and I couldn’t give him the reason not to do it except it being non-aesthetic which could easily be covered up by plaster.

  • @asadmomin6178
    @asadmomin6178 2 ปีที่แล้ว

    Thanks

  • @shubhamtalekar2461
    @shubhamtalekar2461 3 ปีที่แล้ว +1

    Sir karanataka me ek branch open kijiye 🙏bhut aachha he cvil guruji👍

  • @rajatatulkar6046
    @rajatatulkar6046 3 ปีที่แล้ว

    Ty sir

  • @knowledge4671
    @knowledge4671 ปีที่แล้ว

    Civil Guru Ji deserves an oscar Award for saying 10 mm thickness of joint.

  • @hikikomorihachiman7491
    @hikikomorihachiman7491 ปีที่แล้ว

    Why do we wet the bricks 1 hour before laying ?
    What’s the point of raking and point?
    Any tips of 2 wall thickness brick?
    What should be the result for the last test where you inserted the nail in the joints? How to check that?

  • @dharmenderd3160
    @dharmenderd3160 3 ปีที่แล้ว

    Hyderabad also need

  • @tantechy4167
    @tantechy4167 3 ปีที่แล้ว

    Come in kolkata

  • @er_anil_jalwanshi_0005
    @er_anil_jalwanshi_0005 ปีที่แล้ว

    👍

  • @aakashprajapati3484
    @aakashprajapati3484 3 ปีที่แล้ว

    Ahmedabad me branch open kijiye, kafi student hai..

  • @multiworks5185
    @multiworks5185 2 ปีที่แล้ว

    sir jaise 1.2 m ht tak wall ki casting kr diya uske baad se hi curing krna start kr dena hai ya for example ek room mein ek side ka brickwork complete hone k baad se curing krna hai???????

  • @muralidurgaprasad6784
    @muralidurgaprasad6784 ปีที่แล้ว

    Good explanation

  • @abhishekchoudhari7383
    @abhishekchoudhari7383 3 ปีที่แล้ว +2

    Kheela thokne ke baad agar proper strength nahi mili toh kya karna hai ... Aur kheela thokake kaise pata chalta Kitna strength hai ... ?

    • @shyam_biswal
      @shyam_biswal ปีที่แล้ว

      Jaise thokne dikha raha hai, waise hi thokna hai

  • @omi5437
    @omi5437 14 วันที่ผ่านมา

    Bhai etna pasina aaraha hai to coat kyu pahne ho 😂

  • @faisalqureshi9287
    @faisalqureshi9287 2 ปีที่แล้ว

    ⭐⭐⭐⭐⭐

  • @lavishnegi2982
    @lavishnegi2982 3 ปีที่แล้ว

    sir imli ke paani se kya hota h

  • @pateldivyangkumar2109
    @pateldivyangkumar2109 3 ปีที่แล้ว

    Sir check list ka pdf send kijiye

    • @abhisekmedya4502
      @abhisekmedya4502 3 ปีที่แล้ว

      No vai free may nahin

    • @Civil_Guruji
      @Civil_Guruji  3 ปีที่แล้ว +1

      Please check the description , for downloading checklist pdf

  • @CivilEngineerSourabhGupta
    @CivilEngineerSourabhGupta 3 ปีที่แล้ว

    10 mm, 10 mm

  • @mohammaduvaish1261
    @mohammaduvaish1261 3 ปีที่แล้ว

    Coping not hoping.

  • @mukkusahu8079
    @mukkusahu8079 2 ปีที่แล้ว

    Bhai kam hila karo

    • @moizudaipurwala563
      @moizudaipurwala563 ปีที่แล้ว

      Han yrr inko aage peeche hote hue muje video aage aage krna pada

  • @CivilEngineerSourabhGupta
    @CivilEngineerSourabhGupta 3 ปีที่แล้ว

    Why are you shouting sir

  • @zzuhhenzzuhhen7357
    @zzuhhenzzuhhen7357 ปีที่แล้ว

    Are bhai pehle hilna band Karo saala concentration nahi ho pa Raha hai 😅

  • @merajalam5923
    @merajalam5923 ปีที่แล้ว

    Bakwaas video