VFD I/O CONFIGURATION DETAILS | DI, DO, AI, AO CONFIGURATION | HOW TO CHECK POWER | CONTROL WIRING

แชร์
ฝัง
  • เผยแพร่เมื่อ 7 ม.ค. 2025

ความคิดเห็น • 13

  • @maniraj4595
    @maniraj4595 3 ปีที่แล้ว +1

    Vera level anna

  • @tamilselvan8784
    @tamilselvan8784 3 ปีที่แล้ว

    Super bro well

  • @vickytwentythree
    @vickytwentythree 3 ปีที่แล้ว

    Sir need Alternator protection please??

  • @vickytwentythree
    @vickytwentythree 3 ปีที่แล้ว

    U working in powerplant??

  • @farukpatel3049
    @farukpatel3049 2 ปีที่แล้ว

    explanation good but im from gujrat so launguge not undastand

  • @prakashksp2918
    @prakashksp2918 3 ปีที่แล้ว

    Transformer oil name:
    Naphatnenic based oil flash point high or low?
    Paraffinic based oil flash point high or low?

  • @prakashksp2918
    @prakashksp2918 3 ปีที่แล้ว

    Intha profile kku match job unga company la vacancy irukka please help me sir
    Diploma in Electrical and Electronics Engineer(DEEE) Electrical "C" License Competency Certificate,TNLB With six Year experience I have Been Working in the Utility Maintenance of substation & Operation maintenance at Lucas tvs under Voltech engineering
    My roles and responsibilities are
    33kv/11kv(5800kva).and 11kv/433v (1000kva) transformer Operation and Maintenance.
    * 380v/11kv(1250kva) 1.2Mwp Solar step up transformer Operation and
    Maintenance
    * 33kv sf6s,11kv vcb,415vAcb&ocb switchgears Operation and Maintenance
    * Operation and Maintenance of 1000 KVA Captacitive Diesel Generator sets
    * 1000kw Inverter operation and maintenance
    * 5800kva Demand control, Day ? to - day Electrical Breakdown attend and
    Preventive Maintenance
    * Installation of 11KV / 433 Volts, 1000 KVA, Transformers in LTVS, Padi.
    * Installation and commissioning of Lighting system in shop floor & Peripherals and
    utility equipments like Compressor, Pumps and Cooling towers.
    * winding test and continuity testing
    * Monitoring electrical parameter of the solar plant
    * Pump and Blower maintenance.
    * Earth bit maintenance and checking earth pit resistance value
    * Energy saving activities implementation saved 1500Kwh Energy per day.
    * All types of relay testing like Voltage Relay, Current Relay, Earth Relay

  • @prakashksp2918
    @prakashksp2918 3 ปีที่แล้ว

    Dear sir:
    1.under voltage realy (uv)
    Uv voltage value-Voltage%-tripping milli second
    2.over voltage realy (ov)
    Uv voltage value-Voltage%-tripping milli second
    3.over current realy (oc)
    Oc current value-current%-tripping milli second
    1.IDMT realy ( inverse definite minimum time)
    Oc current value-current%-tripping milli second
    2. Instantaneous realy
    Oc current value-current%-tripping milli second
    3. definite Time realy
    Oc current value-current%-tripping milli second
    4.Earth fault realy ( E/F)
    Fault current value-current%-tripping milli second
    1.Ref realy ( Restricted earth fault)
    Fault current value-current%-tripping milli second
    2.Sef realy ( sensitive earth fault)
    Fault current value-current%-tripping milli second
    5. Differential realy
    Different current value-current%-tripping milli second
    6.buchholz realy (Buc)
    Minimum pressure valve alarm- Maximum
    pressure valve trip
    7.pressor realise value (Prv)
    Minimum pressure valve alarm- Maximum
    pressure valve trip
    8.Winding temperature (Wti?
    Minimum temp alarm- maximum temp trip
    9.oil temperature (Oti)
    Minimum temp alarm- maximum temp trip
    10. Magnetic oil Gage (Mog)

    • @electricnmore3398
      @electricnmore3398  3 ปีที่แล้ว

      1) 1.under voltage realy (uv)
      Uv voltage value-Voltage%-tripping milli second
      0.9 times, 1 to 3 sec
      2.over voltage realy (ov)
      OV voltage value-Voltage%-tripping milli second
      1.1times, 1to2sec
      3.over current realy (oc)
      Oc current value-current%-tripping milli second
      1.IDMT realy ( inverse definite minimum time)
      Oc current value-current%-tripping milli second
      1.1times, 150msec
      2. Instantaneous realy
      Oc current value-current%-tripping milli second
      1.5 to 3 times, 100mSec
      3. definite Time realy
      Oc current value-current%-tripping milli second
      1.5 times, 200mSec
      4.Earth fault realy ( E/F)
      Fault current value-current%-tripping milli second
      1.Ref realy ( Restricted earth fault)
      Fault current value-current%-tripping milli second
      0.1times, 50 to 100mSec
      2.Sef realy ( sensitive earth fault)
      Fault current value-current%-tripping milli second
      0.1 to 0.15times, 50 to 100 mSec
      5. Differential realy
      Different current value-current%-tripping milli second
      0.05times, 50mSec
      6.buchholz realy (Buc)
      Minimum pressure valve alarm- Maximum
      pressure valve trip
      see my video for transformer protection
      7.pressor realise value (Prv)
      Minimum pressure valve alarm- Maximum
      pressure valve trip
      see my video for transformer protection
      8.Winding temperature (Wti?
      Minimum temp alarm- maximum temp trip
      80 alarm, 95 trip
      9.oil temperature (Oti)
      Minimum temp alarm- maximum temp trip
      90 alarm, 110 trip
      10. Magnetic oil Gage (Mog)
      mog for only alram circuit
      this all are approximate value defend up on the application may be changed