Working on the Cabin: Insulation, Electrical, V-Match: Episode 32
ฝัง
- เผยแพร่เมื่อ 17 ก.ย. 2024
- Episode 32 of the Cabin Build:
Back to working on the cabin, this time alone. Doing several different small projects including some insulating with Rockwool, A Little bit of running wires for electrical, and some V-Matching with 6 inch Tongue and Groove Cedar V-Match.
We get a little bit of bird hunting in too.
SUBSCRIBE HERE: goo.gl/n5Qppq
INSTAGRAM: / joehollandfishing
FACIALBOOK: / joehollandfishing