Cement Grouted Bituminous Macadam (CGBM) for wearing course, Mix design and construction.

แชร์
ฝัง
  • เผยแพร่เมื่อ 20 ม.ค. 2025

ความคิดเห็น • 22

  • @Jyotikumar-o1n
    @Jyotikumar-o1n ปีที่แล้ว

    Sir your all video give me best knowledge to increase my knowledge in highway construction,sir you are best teacher for highway construction.🙏🏼🙏🏼🙏🏼🙏🏼🙏🏼🙏🏼

    • @SatishIITR
      @SatishIITR  ปีที่แล้ว

      So nice of you. Thanks

  • @sasankasekhar9735
    @sasankasekhar9735 ปีที่แล้ว

    Sir...many thanks...to you.. for such types of information sharing...a new technique...

    • @SatishIITR
      @SatishIITR  ปีที่แล้ว

      Thanks and welcome. Forward the link in your groups also for better dissemination.

    • @sasankasekhar9735
      @sasankasekhar9735 ปีที่แล้ว

      @@SatishIITR sure sir...

  • @surendrachoudhary2063
    @surendrachoudhary2063 ปีที่แล้ว

    Sir, Do we have a Rate analysis (RA) for CGBM? I couldn't find it in MoRTH Rate Specifications. Please provide a reference for the same; it will be very helpful.

    • @SatishIITR
      @SatishIITR  ปีที่แล้ว

      No dear, I have no idea of rate analsyis. Someone who is engaged in consturction work may be able to help you.

  • @bindiyapatel2308
    @bindiyapatel2308 ปีที่แล้ว

    sir explain about Taguchi method if Possible

    • @SatishIITR
      @SatishIITR  ปีที่แล้ว

      Ok, will try. Thanks for the suggestion.

  • @ningaipougangmei7582
    @ningaipougangmei7582 หลายเดือนก่อน

    sir, for bituminous mix air voids is 20 to 35 % but what should be the required percentage of dry aggregate air void (without bitumen) .how do we take reference from code since it is not mention in IRC : sp:125-2019.

    • @SatishIITR
      @SatishIITR  หลายเดือนก่อน

      Voids in dry rodded condition is required when you want to have a mix with stone on stone contact like in the case of SMA. In BM the voids are randomly distributed and there is no requirement of checking air voids in aggregates.

  • @vamsikrishna3264
    @vamsikrishna3264 ปีที่แล้ว

    Thank you so much sir. It is very comprehensive.

    • @SatishIITR
      @SatishIITR  ปีที่แล้ว

      Thanks, please circulate the link in your groups also.

  • @ramnivas734
    @ramnivas734 ปีที่แล้ว

    Sir please make videos on Field construction of WBM and GSB

  • @sagarshukla3198
    @sagarshukla3198 ปีที่แล้ว

    Can CGBM a good surface layer for National Highway or Expressways ?? Is there any limitations for using this on high volume roads ?

    • @SatishIITR
      @SatishIITR  ปีที่แล้ว

      CGBM has been primarily used on urban roads. It has not been tried on NH or EWs so far. Its suitability under the heavy traffic of commercial vehicles is doubtful (not studied so far).

    • @sagarshukla3198
      @sagarshukla3198 ปีที่แล้ว

      Thank you sir for reply.

  • @sudheendras7764
    @sudheendras7764 หลายเดือนก่อน

    Sir, Can CGBM be used as Binder Course for Traffic less than 5MSA. In the video, with reference to IRC 125 you make a mention of thickness 30mm for CGBM. In such case, can we use as a replacement to conventional BM layer of 50mm used ? Any inputs about costing from Surat Municipal Corporation where the trails have been done ?

    • @SatishIITR
      @SatishIITR  หลายเดือนก่อน

      CGBM is not for binder course. It is best suited for the surface course layer due to its impervious surface. Cost of laying 30 mm CGM is roughly 40 - 45 percent higher than that of 50 mm BM.

  • @praghavendra5315
    @praghavendra5315 ปีที่แล้ว

    Please make video SMA

    • @SatishIITR
      @SatishIITR  ปีที่แล้ว

      Hey, It is already uloaded long back. Watch it now.