If cost is a consideration, I'd run a mixed system. Dedicated line with a serial going out in both directions from the center. Three sites per branch is manageable, especially when the center site is the feed.
Absolutely! A system with both is an option. Looking back at it now that we know more, our electrician contemplated putting 2 RV sites on the same circuit, but decided against it and instructed us to install two runs of conduit from the DPanel. Now we know what they meant! That would have been a mixed system.
Great video
Great video !! I really liked the animations you added in the video ❤ See you in the next video😊
I appreciate your support! Your feedback means a lot to me. Stay tuned for more!
Everything is looking great Comet Troy. Maybe catch ya next month when we return. 😎
Thank you so much! Looking forward to catching up with you next month!
If cost is a consideration, I'd run a mixed system. Dedicated line with a serial going out in both directions from the center. Three sites per branch is manageable, especially when the center site is the feed.
Absolutely! A system with both is an option. Looking back at it now that we know more, our electrician contemplated putting 2 RV sites on the same circuit, but decided against it and instructed us to install two runs of conduit from the DPanel. Now we know what they meant! That would have been a mixed system.