Thank you very much. I have TN C-S system in my building, and a 3-phase lift motor with control panle in the sixth floor is connected properly to the system as you described and there is encased electrode that is conected to the building structure and to foundation sticking out in the elevator room can I used as earthing for further protection and ground the control panle and the elevator motor to it.
To be clear, no voltage is applied by the unit across P1 and P2 as stated at 7:05, these electrodes measure the potential difference in the ground. A voltage is applied across C1 and C2 only.
Excellent explanation mam, easily understandable
Thank you very much. I have TN C-S system in my building, and a 3-phase lift motor with control panle in the sixth floor is connected properly to the system as you described and there is encased electrode that is conected to the building structure and to foundation sticking out in the elevator room can I used as earthing for further protection and ground the control panle and the elevator motor to it.
To be clear, no voltage is applied by the unit across P1 and P2 as stated at 7:05, these electrodes measure the potential difference in the ground. A voltage is applied across C1 and C2 only.
Good One
nice information
nice
Super
Good.
Wow 😲😳😳😳
Wow
You killed the end of the video by adding the ads and cover the screen !
Hindi videos please 🙏🙏🙏
Rod length 2.75. burried length 4.75.????😮😮
But this indian-english akcent is best😅
10 dislikes.