HS2, IT'S A COVER UP!

แชร์
ฝัง

ความคิดเห็น • 15

  • @thorley1969
    @thorley1969 7 หลายเดือนก่อน +9

    In a few years time you won't even know that the railway is there. Awesome engineering.

    • @WTFdroning
      @WTFdroning  7 หลายเดือนก่อน +5

      This is why i love Documenting the progress so in ten years time we can see the difference. Nature always finds a way to reclaim and adapt, just take a look at the Great Central Railway that once ran through Woodford Halse, it truly beautiful and a Sanctuary for wildlife.

    • @gorgu08
      @gorgu08 7 หลายเดือนก่อน +6

      Also the reason it is massively over budget and the north of England is missing out, total travesty the over engineering of this section, a plain embankment would have been perfectly fine through this section…it needed stronger project management to say no, all the other railways round here are visible, this one is going to be as well

    • @WTFdroning
      @WTFdroning  7 หลายเดือนก่อน +3

      @@gorgu08 I totally agree with you, this should be a cutting and not some over inflated, so called "Green" tunnel.

    • @davecooper3238
      @davecooper3238 7 หลายเดือนก่อน +1

      @@gorgu08How could an embankment replace a tunnel ?

    • @donaldtriumph1682
      @donaldtriumph1682 6 หลายเดือนก่อน +3

      Local objections and too many Chris packhams in the world to whine about the effect it has on its surroundings. They said something similar about the M25 we would be F.D with out it. Pity they cancelled the northern stretch.

  • @boblovell5789
    @boblovell5789 7 หลายเดือนก่อน +2

    I can understand covering rail tracks to avoid having deep cuttings or where housing development needs to be screened against noise etc. But viewing the drone shots there appears no evidence of either. There has to be a reason!

    • @davecooper3238
      @davecooper3238 6 หลายเดือนก่อน

      Somewhere to plant trees etc without getting leaves on the line. Also provide a green bridge to allow the free movement of wildlife.

  • @oldman1734
    @oldman1734 7 หลายเดือนก่อน +1

    Doesn’t seem to be much happening, considering the size of the project.

    • @EllieMaes-Grandad
      @EllieMaes-Grandad 7 หลายเดือนก่อน

      Still spending billions though . . .

  • @RitaFarrow
    @RitaFarrow 7 หลายเดือนก่อน

    give ,em ,a job a knock there,ll soon cover it all up,would have thought that they would shut the off, the road,and get on doing the next part,seems to a lot of cars in that car pack and not many bears about

    • @davecooper3238
      @davecooper3238 6 หลายเดือนก่อน +1

      I believe it’s a vehicle storage are rather than a carpark.

    • @robbielad
      @robbielad 6 หลายเดือนก่อน +2

      On the Southern side of the site. On the Chipping Warden disused airfield is one of British Car Auctions referb and storage facilities. Along with several other vehicle storage companies, including Lotus and Aston Martin.