Railroad Diamond Replacement Timelapse, Houston TX

แชร์
ฝัง
  • เผยแพร่เมื่อ 23 พ.ย. 2024

ความคิดเห็น • 66

  • @thirdgengta
    @thirdgengta 28 วันที่ผ่านมา +28

    Excellent! I was hoping y'all would make a time-lapse version of this. Watched it as it happened, but the time-lapse version is much neater to watch.

  • @citled
    @citled 11 วันที่ผ่านมา

    I love seeing these videos put out to the public. It shows them that railways are not all about the trains. It shows the heavy duty work required to keep trains running from A to B. Having worked on many a job like this, I wish it was as quick as the time lapse shows. This also only shows the ground work on site, not all the planning , timing, resources, manpower, coordination required in doing such a job. The best part of these jobs, after completing and signing back into use, is watching the first train go over it. Excellent well organised job.

  • @ejandersen2878
    @ejandersen2878 4 วันที่ผ่านมา

    Great time lapse, thoroughly enjoyed it. Thanks.

  • @HyenaEmpyema
    @HyenaEmpyema 28 วันที่ผ่านมา +15

    they're replacing the ballast (rock) below it because it actually "wears out" from all the trains smashing it down. incredible. the precision and efficiency of this crew is what makes this video worth watching.

    • @citled
      @citled 11 วันที่ผ่านมา +1

      Takes decades for railroad ballast to wear out, which is why granite is used because of it durability under load and in all weather condition. They generally replace ballast because the formation of it has become clogged. Ballast whilst a support system is also an important drainage system in railroads. Over time it gets clogged by natural 'dust' also railroad dust such as rail fillings and brake dust. When it gets clogged it loses its drainage ability and this causes the tracks to flood and lose it stability. In some locations, railroad ballast is removed, cleaned and returned immediately to the track it was supporting.

    • @HyenaEmpyema
      @HyenaEmpyema 11 วันที่ผ่านมา

      @@citled thank you for clarifying.

  • @kens.3729
    @kens.3729 28 วันที่ผ่านมา +3

    Work Crews are Efficient and Show Up to Work. Thanks for the Time Lapse and for Covering the Replacement LIVE. 👍🙏

  • @KatieWilk
    @KatieWilk 28 วันที่ผ่านมา +3

    I like this time-lapse. It's funny seeing everything speeded up. It's still cool to watch this

  • @garylewis3815
    @garylewis3815 21 วันที่ผ่านมา +2

    It's like watching a 1:1 scale model railroad being built..😊....Great vlog..

    • @markh.6687
      @markh.6687 21 วันที่ผ่านมา

      "Look what YOU can build with Atlas Snap Track!"

  • @averageguy7136
    @averageguy7136 27 วันที่ผ่านมา +2

    Very impressive. Good project management to get this done in a shirt amount of time. 4 tampers going at once time is impressive.

  • @newjerseyray
    @newjerseyray 8 วันที่ผ่านมา

    very cool to watch, thanks for posting.

  • @j.martin6787
    @j.martin6787 26 วันที่ผ่านมา +2

    Possibly the coolest train video I have seen

    • @u2bear377
      @u2bear377 18 วันที่ผ่านมา

      Possibly the _dustiest_ train video...

  • @daar1113
    @daar1113 28 วันที่ผ่านมา +3

    Thanks for getting the camera patched back together in time for this event. I thought for sure that Murphey's law would prevail but you beat old Murphey after all.

  • @thomasgautney5586
    @thomasgautney5586 28 วันที่ผ่านมา +3

    Wow! That was spectacular! Git-R-Done!

  • @JawTooth
    @JawTooth 19 วันที่ผ่านมา +1

    Wow, that was awesome!

  • @SETX_Sirens_and_Rail_02
    @SETX_Sirens_and_Rail_02 28 วันที่ผ่านมา +2

    That old diamond was in rough shape it appeared. About time for this beautiful replacement

  • @MrUtubeobia
    @MrUtubeobia 25 วันที่ผ่านมา

    Well planned and executed work! They were ready!

  • @jmcfarlandjr
    @jmcfarlandjr 26 วันที่ผ่านมา

    I just saw the definition of coordination. Great video.

  • @ronaldrondeau7870
    @ronaldrondeau7870 28 วันที่ผ่านมา

    Thanks for that shot vey impressive how its done

  • @NOELTM
    @NOELTM 26 วันที่ผ่านมา +1

    The guys in the foreground chatting for most of the time whilst the crews worked.😉

  • @mpeterll
    @mpeterll 27 วันที่ผ่านมา

    Nice square dance with the ballast tamping machines near the end.
    It looked like the crane was close to tipping with the old diamond until the excavators helped to share the load.

    • @mpeterll
      @mpeterll 26 วันที่ผ่านมา

      @@bluejay713 Whatever they were doing, it was still cool to watch. They weren't pushing spikes though, because with panel track, all the spikes are already fully installed before the track is lifted into place. If they weren't, the track would fall apart when lifted.

    • @mpeterll
      @mpeterll 26 วันที่ผ่านมา

      @@bluejay713 Yes, that much we agree on.

  • @robertwheeler4068
    @robertwheeler4068 28 วันที่ผ่านมา +1

    AMAZING!!!

  • @DogRedful
    @DogRedful 28 วันที่ผ่านมา +3

    1 to 1 scale Kato Unitrack!

  • @yojlik
    @yojlik 27 วันที่ผ่านมา

    surely I'm not the only one making vroom vroom noises whenever the dozer is doin its thang 🤣🤣

  • @u2bear377
    @u2bear377 18 วันที่ผ่านมา

    9:30 The forklift at the left: "The show's over, kid, time to go to sleep".

  • @josephlalock8378
    @josephlalock8378 28 วันที่ผ่านมา

    it's amazing that that many people, standing around for so long, were required to do this job.

  • @dturner40
    @dturner40 28 วันที่ผ่านมา +2

    0:47 interesting to see the crane actually lift the rear of its tracks off the ground picking up the diamond. I would not of thought it would be a good idea for a crane to tip forward that much lifting a load, but maybe they all do that. Never watched one in time lapse. The boom doesn't seem to tip forward....just the cab and tracks. When he is backing up with the diamond, the crane also appears to be tipping forward lifting the tracks off the ground. Just a weird sight to see. It looks like it wants to tip over, but I am sure there are tons of safety sensors in that cab to ensure it doesn't and it is all normal operation.

  • @tdluvs
    @tdluvs 27 วันที่ผ่านมา

    Excellent video. What are the two panel tracks on the right for. Haven’t seen anything like that before

    • @u2bear377
      @u2bear377 18 วันที่ผ่านมา

      You mean expansion compensators?

  • @22pcirish
    @22pcirish 15 วันที่ผ่านมา

    In the UK we wash the stone before it gets to site to cut down on the hazard from dust.

  • @Stefan_Boerjesson
    @Stefan_Boerjesson 28 วันที่ผ่านมา

    Whitch guy is the boss, the coordinator, of all the "ants? Impressive work.

  • @intimidate2161
    @intimidate2161 20 วันที่ผ่านมา

    what is the mesh material placed under the ballast?

  • @GFSwinger1693
    @GFSwinger1693 28 วันที่ผ่านมา

    Looks pretty windy.

  • @kcsthebetterway
    @kcsthebetterway 27 วันที่ผ่านมา +1

    Wish I was that fast on my model railroad😅

  • @JoeyLovesTrains
    @JoeyLovesTrains 26 วันที่ผ่านมา

    It’s surprising how often they do this, and also how interesting that even after hundreds of years of railroads being around, we still don’t have a reliable track crossover that doesn’t need to be replaced every 10 years or so.

  • @Ruvssians
    @Ruvssians 28 วันที่ผ่านมา +1

    Crazy how they do all of this

  • @Norfolksouthern6920
    @Norfolksouthern6920 28 วันที่ผ่านมา +3

    *inserts homedepot theme

    • @brucybabyy7355
      @brucybabyy7355 28 วันที่ผ่านมา

      I was going to say bennie hill

  • @SangNguyen-ic8sr
    @SangNguyen-ic8sr 28 วันที่ผ่านมา +1

    With 10 hours later the new Diamond rails

  • @robertsinclair9979
    @robertsinclair9979 28 วันที่ผ่านมา +4

    No shortage of men and equipment.

    • @markh.6687
      @markh.6687 21 วันที่ผ่านมา +1

      Time is money, that diamond is a major headache and revenue loss being out of service, so they pour men and equipment into the site.

  • @heavenlydays2838
    @heavenlydays2838 28 วันที่ผ่านมา

    The 1 thing im surprised of, is that they did not put the 2 signals to sleep as they were doing all this work. They stayed lit Red thru out.

    • @irmafoster3933
      @irmafoster3933 28 วันที่ผ่านมา

      Rule No. 1. Do Not disarranged the signal system.

  • @briansmith-l1q
    @briansmith-l1q 12 วันที่ผ่านมา

    switches are probably bad enough, but these must do a number on the wheels, tho i have no idea, lol (makes a lot of noise tho)

  • @nlo114
    @nlo114 27 วันที่ผ่านมา

    I could watch this from start to finish, with a pack of sandwiches and a large flask of tea. Not so keen on the dust part of it though.

  • @NBahnAnderl
    @NBahnAnderl 28 วันที่ผ่านมา

    A nice Timelaps.
    Can Annyone explain why American Railways are Placed direct on dirt and Muddy Ground?
    In Germany there where at least 5 Feet deep Groundigs build up to have a stable and entforced Groundlevel that helps to keep te water away from the Gravel and give the Rail a smooth and leveld Bed.

    • @sandysmithvideos228
      @sandysmithvideos228 27 วันที่ผ่านมา +1

      There are about 150,000 miles of track in the U.S. 7 times more than Germany. Mainline track is on top of a crushed rock, a dense graded sub-base, 3-6 feet depending on local conditions which is compacted. Above that there is typically 3-4 layers or lifts of hard rock ballast (trap rock, granite, Gniess) which is tamped and lined. Lesser used sidings receive far less maintenance possibly giving the appearance of being on dirt. When the first tracks were laid in the 1860-1900's there was very little mechanical capability to spread ballast rock. As far as the smooth and level of North American rails, they take a massive loading as the cars, locomotives and trains are vastly heavier than European equipment which degrades cross level, profile and alignment of the track. Also thermal cycling range is higher. Many areas of the western U.S. have freezing sub 10 degrees F to plus 100 degrees F in the summer.

  • @adrianceasar5620
    @adrianceasar5620 19 วันที่ผ่านมา

    just imagine if you forget to install the sd memory card in video camera :)

  • @vesubioromo9425
    @vesubioromo9425 28 วันที่ผ่านมา

    I live here. I didn't know we had quad diamonds anywhere. Does anyone know the streets close by?

    • @SETX_Sirens_and_Rail_02
      @SETX_Sirens_and_Rail_02 28 วันที่ผ่านมา +2

      West Street is the crossing right by it. Tower 26 is actually marked on Google Maps if you search for it

    • @vesubioromo9425
      @vesubioromo9425 28 วันที่ผ่านมา

      @@SETX_Sirens_and_Rail_02 Thanks.

  • @LynnTimmerman
    @LynnTimmerman 27 วันที่ผ่านมา

    Just imagine if our Government worked like that to see what they could achieve in the same time line!!!

  • @thomasgreis4688
    @thomasgreis4688 28 วันที่ผ่านมา +1

    I’m thinking it’s not new diamond trackage. It’s the same one as before, lifted out if the way so they could fix a problem with moist or muddy ground underneath it. Did you see the cement bags and rubber sheets they used to shore it up?

  • @ronaldweir712
    @ronaldweir712 21 วันที่ผ่านมา

    Clearly no dust suppression in evidence. Some of that dust will end up in the lungs of the tracker workers

    • @u2bear377
      @u2bear377 18 วันที่ผ่านมา

      Hope they were wearing HEPAs.

  • @RDC_Autosports
    @RDC_Autosports 28 วันที่ผ่านมา

    had to slow it to .25 so i could see what they were doin 😅

  • @DJShadesUK
    @DJShadesUK 20 วันที่ผ่านมา

    Narrator: They didn't replace the diamonds.

  • @shroom9033
    @shroom9033 25 วันที่ผ่านมา

    Lazy crane operator😂😂😂. Put some throttle in it😅

  • @meht61rus
    @meht61rus 20 วันที่ผ่านมา

    в России такой хе..ей не занимаются, тут был бы мост

  • @helixvonsmelix
    @helixvonsmelix 28 วันที่ผ่านมา

    Well i suppose that they will go back and level it correctly at some point. Is this the how not to do it video?

  • @DrLumpyDMus
    @DrLumpyDMus 24 วันที่ผ่านมา

    If we could get the kids at MacDonalds to work that fast, we'd have REALLY fast food!

  • @rogertemple7193
    @rogertemple7193 28 วันที่ผ่านมา +2

    This is what I call a time lapse Railroad Diamond Replacement
    have a wonderful week and Halloween everyone.🚂🚃🚃🇺🇲