This is for instructional purposes only, no screws are used. In the case of cryogenic insulation, there may be damage to the vapor barrier, so the SS Band can be firmly fixed without using screws and without pressing the insulating material with the "V" Cut (applied to the pipe). The practical training course is thermal insulation using MW, but it is integrated and educated with a method that does not use screws.
You put your band on backwards..
Hlo sir mere ko bhi kam mile ga insulation ka
Was ist mit Schrauben ?
This is for instructional purposes only, no screws are used. In the case of cryogenic insulation, there may be damage to the vapor barrier, so the SS Band can be firmly fixed without using screws and without pressing the insulating material with the "V" Cut (applied to the pipe). The practical training course is thermal insulation using MW, but it is integrated and educated with a method that does not use screws.
安装技术不行
Looks like hell
what a mess...!