Rangiuru Interchange - DuraMesh - Cirtex Case Study

แชร์
ฝัง
  • เผยแพร่เมื่อ 30 มิ.ย. 2024
  • To improve access to the Business Park, the Rangiuru Interchange will include on and off ramps in both directions from the Papamoa Eastern Link. To meet the need for a quick-to-construct, robust, and cost-effective solution capable of withstanding heavy traffic loads, two MSE bridge abutments were designed. These abutments feature 90-degree DuraMesh panels reinforced with StrataGrid geogrid strips and an attached tilt slab concrete fascia.
    Want to find out more about Cirtex? Check us out on any of the platforms below:
    Website - cirtexcivil.co.nz/
    LinkedIn - / 1006. .
    Facebook - / cirtexcivil
    Instagram - / cirtexcivil
  • วิทยาศาสตร์และเทคโนโลยี

ความคิดเห็น •